Establishment of Greenhouse with Hydroponics Facility
Buying agencyMUNICIPALITY OF LEON, ILOILO
Bid Brief
Is this bid worth a closer look?
Stored notice data. Confirm all decisions with the official documents.
Why this matters
The complete eligibility conditions must be checked in the official bidding documents.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
How screening states work
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
I GENERAL REQUIREMENTS A. 1.00 lot Project Signboard, COA, Billboard and Project Marker B. 1.00 lot Mobilization and Demobilization II EARTHWORKS A. 224.00 sq.m Site Clearing and Grubbing B. 10.81 cu.m Structure Common Excavation, Common Soil III REINFORCED CONCRETE WORKS 6.72 cu.m Structure Concrete with RSB and Formworks IV MASONRY WORKS A. 36.00 sq.m CHB Non-load Bearing, 4" (including Reinforcing Steel) B. 24.00 sq.m Cement Plaster finish V STEEL FRAMING WORKS 2,690.25 kgs Structural Steel VI PAINTING WORKS 2,690.25 kgs Steel Painting VII ROOFING AND COVERING WORKS 1.00 lot PE, Plastic, Insect Net, Mesh, Shade Net,Weed eliminator, and other accessories VIII HYDROPONIC SYSTEM 1.00 lot PVCX Tubes, PVC Pipes, PE Pipes, Fittings, Controller, Submersible Pump, Multi-fans, Cooling Pads, Aluminum Frames, Hydroponic Pots TERMS AND CONDITIONS 1 Contract period shall be ninety (90) calendar days. 2 Winning bidder should start the work 5 days after the receipt of Notice to Proceed (NTP). 3 The winning bidder should inform the Provincial Agriculturist in writing before the start of work. 4 Liquidated damages shall be charged to contractor for the delay as provided in RA 9184 as well as other contract implementation guidelines concerning this project. 5 Winning bidder shall observe safety precautions during the work and shall be liable for damages to person/property (ies) arising from the construction of the project. 6 Works shall be in conformity to the approved plans and specifications as stipulated on the Program of Works. 7 All materials shall be delivered on jobsite and inspected by the Engineer-in-Charge prior to the construction of work. 8 Winning bidder must clear the construction site upon completion and prior to acceptance by the end user. 9 Winning bidder shall provide 8' x 8' size of tarpaulin with layout as per specifications (refer to Provincial Agriculture Office)
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Review the official notice and bidding documents for the complete requirements.
Oct 26, 2026, 12:00 AM
Nov 17, 2026, 9:30 AM
17 days leftOct 26, 2026, 1:54 AM
Oct 26, 2026, 1:54 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
- Original reference
- 13305607
- Original stored title
- Establishment of Greenhouse with Hydroponics Facility
- Original buying agency
- MUNICIPALITY OF LEON, ILOILO
- Stored status
- active
View original stored description
Freshness: First saved / captured Oct 26, 2026, 1:54 AM; last database update Oct 26, 2026, 1:54 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.
