Pre-Bid Conference
Known from stored extractionA specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Buying agencyBOARD OF INVESTMENTS - MAKATI CITY METRO MANILA
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
Relevance does not establish whether your company meets the bid requirements.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Information Technology
The Board of Investments (BOI) is an attached agency of the Department of Trade and Industry (DTI) that is the national government entity responsible for the promotion of investments for both foreign and domestic, in accordance with Executive Order no. 226, also known as the Omnibus Investments Code of 1987, and the recently approved R.A. 11534 or the “Corporate Recovery and Tax Incentives for Enterprise Act” or “CREATE” more law. The BOI seeks to attract quality investments that will encourage technological innovations and provide support for industries to seize the opportunities and challenges of global demands and competition. The agency envisions itself as a global industry promotion agency by 2028 guided by the core values of integrity, excellence, teamwork and passion for knowledge. Its mission is to provide investors with opportunities for investments, comprehensive business support services and fair predictable and consistent industry policies. The current state of the economy due to the on-going pandemic makes it more imperative for BOI to continuously aim for work excellence, as it is an agency, which is at the forefront of enticing investments into the country.
The project aims to modernize the Board of Investments' (BOI) virtualization infrastructure by implementing a secure, scalable, and resilient hybrid platform that integrates on-premises and cloud-based technologies. The solution will support the hosting of critical BOI systems and services while improving systems availability, operational efficiency, centralized management, and disaster recovery capabilities. The project also seeks to strengthen BOI's cybersecurity posture and business continuity readiness by deploying a supported and future-ready virtualization environment aligned with the Agency's digital transformation goals. The implementation shall be consistent with BOI's approved Information Systems Strategic Plan (ISSP) for the period 2024-2026, applicable government policies, and relevant DICT standards and guidelines. Through this initiative, BOI aims to ensure the reliable, secure, and efficient delivery of mission-critical services while providing a flexible platform capable of supporting future growth and evolving operational requirements.
The winning bidder shall supply, deliver, install, configure, and commission the complete virtualization infrastructure, including but not limited to: 3.1 Hardware Deliverables (2 units of Hyperconverged Infrastructure (HCI) Servers) Part Description Qty Form Factor 2U rack server 2 Processors Intel Xeon 6517P 16C 190W 3.2GHz 4 2U V4 Performance Heatsink Memory 64GB TruDDR5 6400MHz (2Rx4) RDIMM 32 Storage 3.5" 16TB 7.2K SAS 12Gb Hot Swap 512e HDD v2 18 2.5" U.2 CD8P 6.4TB Mixed Use NVMe PCIe 5.0 x4 HS SSD 6 M.2 VA 480GB Read Intensive NVMe PCIe 4.0 x4 NHS SSD 4 Networking Broadcom 57414 10/25GbE SFP28 2-Port OCP Ethernet Adapter 4 Mellanox ConnectX-6 Lx 10/25GbE SFP28 2-port PCIe Ethernet Adapter 4 Dual Rate 10G/25G SR SFP28 Transceiver (should be compatible with the current Server Farm Switch of BOI) 8 Riser Slot V4 x8 Rear Riser Slot 3 2 V4 x16 Rear Direct Riser Slot 5 2 V4 x16 Rear Direct Riser Slot 8 2 Power Supply 300W 230V/115V Titanium CRPS Premium Hot-Swap Power Supply 4 2.8m, 13A/100-250V, C13 to C14 Jumper Cord 4 Accessories 2U 6056 20K Performance Fan Module 12 Azure Local - Premier with Integrated OEM Licenses (Azure Local + Windows Server 2025) 2 Data Center Environment 30 Degree Celsius / 86 Degree Fahrenheit 2 3 Years Integrated L1/L2 Azure Local Software Support 2 MX Onsite Deployment 2 Select Storage devices - no configured RAID required 2 440-16i SAS/SATA PCIe Gen4 12Gb HBA 2 2U V4 12x3.5" SAS/SATA Backplane 2 2U V4 Rear 4x2.5" NVMe Gen5 Backplane 2 M.2 RAID B545i-2i SATA/NVMe Adapter 2 M.2 VA 480GB Read Intensive NVMe PCIe 4.0 x4 NHS SSD 4 3m Passive 25G SFP28 DAC Cable 8 Toolless Slide Rail Kit V4 2 2U V3 EIA Latch Standard 2 TPM 2.0 with Secure Boot 2 Disable IPMI-over-LAN 2 XClarity Platinum Upgrade v3 2 V4 Processor Board 2 V4 Laser service indicator 2 Feature Enable TPM on MB 2 MX EOM SKU Searchable MI 2 Windows Specify 2 Preload Specify 2 1x1 3.5" HDD Filler 6 1x1 2.5" HDD Filler 2 2U Air duct Filler for 1P 4 EIA Plate logo Label 2 V4 System I/O Board 2 V4 CPU HS Clip 4 2U V4 3FH Riser Cage 2 Notice for Advanced Format 512e Hard Disk Drives 2 2U V4 1FH Riser Cage 2 2U V4 2U Rear 4x25 Cage 2 2U Main Air Duct 2 Warranty Services Upgrade 2 Mellanox Low-Profile Dual-Port QSFP56 PCIe Bracket L1/SBB 4 2U 2LP Riser Cage Filler 2 HV 2U V4 General WW L1 PKG BOM 2 MR customer specific - ROW 2 V4 2U PLV sponge Kit (Fan Cage) 2 Power Cable, 2x6+12 P-2x3+6 P, 250 mm 2 G4 SAS Cable, SLX8-SLX4, 900mm 2 G4 SAS Cable, SLX8-SLX4 x2, 900mm/1020mm 2 Think System,Power Cable, MTK Power STD to PIC Power 2x3+6P, 250mm 2 PCIe GEN5 Cable, MCIOX8-MTK74pin, 280mm 4 M.2 Signal & Power Cable ,ULP 82P-SLX4/2X10 SB, 400/400mm 2 V4 Agency Label with CE&UKCA 2 V4 Service Label - WW 2 Response time Service Label LI 2 2U MS 12x3.5" SATA/SAS HDD Type Label 2 XCC Label 2 BHS V4 2U Rear 4x2.5" (32-35) NVMe Label 2 1300W TT power rating label WW 2 small Label for 24x2.5"/12x3.5"/10x2.5" 2 WW LPK, Birch Stream 2 N+N Redundancy With Over-Subscription 2 High voltage (200V+) 2 M.2 NVMe 2 MX650 V4 IS 2 MX Badge 1 2 MI-RS03, PCIe10/ PWR10 2 Configuration ID 01 test 2 xSeries HIPO 2 Azure Local with Windows Server 2025 License (16 core) 2 Azure Local with Windows Server 2025 Additional License (2 core) 16 Configuration Instruction 2 440-16i SAS/SATA PCIe Gen4 12Gb HBA Placement 2 Controller 01 2 Configuration ID 01 test 2 Microsoft HCI - OEM SKU 2 Azure Local with Windows Server 2025 License (16 core) 2 Azure Local with Windows Server 2025 Additional License (2 core) 16 Preload 2 Registration only 2 XClarity One 2 XClarity One - Standard, Per Endpoint w/3 Yr SW S&S 2 XClarity Controller Prem-FOD 2 XClarity XCC3 premier - FOD 2 3Yr Premier 24x7 4Hr Resp MX650 V4 2 3Yr KYD Add-On MX650 V4 2 Hardware Installation Standard Server (Off Shift Hours) 2 VX Remote Deployment (up to 4 node cluster) 2 MX Onsite Deployment (up to 2 nodes) 1 3 Year Microsoft Azure Local L1 & L2 SW Support 2 3.2 Microsoft Azure Services
3.3 Azure Local Platform
3.4 Windows Server Licensing
3.5 Documentation
The winning bidder shall provide a complete, integrated, enterprise-grade virtualization modernization solution capable of replacing the existing Board of Investments (BOI) Nutanix virtualization environment and supporting the Agency’s current and future mission-critical information systems. The proposed solution shall include, at a minimum, the required hardware infrastructure, virtualization platform, operating system licensing, Microsoft Azure services, Azure Local, Azure Arc, implementation services, migration assistance, testing, documentation, training, technical support, and warranty. The proposed solution shall:
4.1 Hyperconverged Infrastructure Requirements The HCI platform shall integrate compute, memory, storage, virtualization, and management capabilities into a centrally managed cluster.
4.2 Network Connectivity Requirements Each HCI node shall provide redundant, high-speed network connectivity to support storage traffic, virtual machine communications, management functions, cluster synchronization, and secure integration with Microsoft Azure services, ensuring high availability, reliability, and uninterrupted operation of the virtualization environment. The solution shall provide:
The Contractor shall coordinate with BOI ITD for integration with the existing core and server farm switches and network infrastructure. 4.3 Microsoft Windows Server Licensing The Winning bidder shall provide all required Microsoft Windows Server licensing necessary to operate the proposed virtualization environment. The licensing shall:
The winning bidder shall provide all software licenses required to fully support the proposed virtualization platform, operating systems, and hybrid cloud architecture. The bidder shall be responsible for validating, sizing, and supplying the appropriate licensing requirements based on the final approved solution architecture, hardware configuration, workload requirements, and applicable vendor licensing policies. All licenses shall be genuine, properly licensed, transferable to BOI where applicable, and supported throughout the contract period. 4.4 Microsoft Azure Services The winning bidder shall provision, configure, and integrate the Microsoft Azure services necessary to support the approved hybrid architecture using the Board of Investments' (BOI) existing Azure subscriptions, licenses, and cloud resources, where applicable. The winning bidder shall validate the availability and suitability of the Agency's existing Azure entitlements and ensure that all required services are properly configured and optimized to support the approved solution architecture. The proposed Azure environment shall support, as applicable:
The winning bidder shall provision, configure, and integrate the Microsoft Azure services required to support the approved hybrid cloud architecture, virtualization environment, cybersecurity controls, monitoring, backup, and disaster recovery requirements of BOI. The final Azure services, configurations, and resource sizing shall be determined based on BOI's approved technical design, validated workload requirements, security requirements, and the results of the planning, assessment, and discovery activities conducted during project implementation. 4.5 Azure Arc Requirements The solution shall support centralized management of BOI’s hybrid infrastructure through Azure Arc. The winning bidder shall:
The bidder’s proposal identifies Azure Arc as a mechanism for unified management of on-premises and cloud environments. 4.6 Azure Site Recovery (ASR) Requirements The solution shall provide a functional disaster recovery capability using Microsoft Azure Site Recovery. The winning bidder shall:
4.7 Backup and Data Protection The solution shall support integration with BOI’s approved backup and data protection strategy. The Contractor shall:
The winning bidder shall document the approved Recovery Point Objective (RPO) and Recovery Time Objective (RTO) values for each critical workload and shall demonstrate during acceptance testing that the proposed DR solution is capable of meeting the agreed recovery objectives.
The following are the Scope of the Work for each component of the project: 5.1 Vision Scope and Planning/Design During this phase, the winning bidder shall conduct project initiation, requirements validation, and detailed planning activities to establish the project vision, scope, objectives, and implementation approach. The existing BOI IT infrastructure, workloads, dependencies, and operational requirements shall be assessed to validate the proposed solution architecture, migration strategy, and transition plan. This phase shall focus on detailed planning, risk assessment, design validation, resource allocation, and project governance activities necessary to ensure the successful implementation of the solution. Key activities under this phase are as follows:
o Validate and consider existing Azure Subscriptions to identify constraints and dependencies. o Conduct planning with BOI IT stakeholders, run through critical solution capabilities of Azure environment, capture, and validate requirements, and ensure these are incorporated in the overall implementation plan. Finalize Project Timeline
Deliverables
5.2 Build Phase During this phase, the winning bidder shall implement the approved solution design and execute the installation, configuration, integration, and validation activities necessary to establish the virtualization and hybrid cloud environment. System configuration, testing, and optimization activities shall be performed to ensure that the solution operates in accordance with the approved technical design and project requirements. Operational procedures, administration guides, and support processes shall likewise be developed and documented to facilitate the transition to production operations. Key activities under this phase are as follows:
o Inventory and Unboxing o Initial setup o Power on o Rack mounting o XCC Configuration
o Work with BOIs to understand the production network environment o Apply updates/patches o Configure out-of-band management port o Configure hardware settings o Load appropriate Windows drivers o Install Windows roles and features o Configure server NIC teaming o Enable and configure Storage Spaces Direct (S2D) on the cluster o Validate storage and cluster functions o Hand over the cluster to the BOI for application deployments
o Create or validate Recovery Services Vault o Configure Azure Monitor and logging prerequisites o Configure Azure networking prerequisites o Configure storage accounts for replication o Configure Azure RBAC access controls o Configure Azure policies and governance requirements
o Provisioning of two (2) Virtual Machines for SIRV Application Servers o Create Hyper-V site within Recovery Services Vault o Configure ASR replication policies o Install Azure Site Recovery Provider on Hyper-V hosts o Register Hyper-V hosts with ASR vault o Configure ASR mobility and replication components o Configure network mappings between on-premises and Azure o Configure target Azure resources for failover o Configure VM replication settings o Configure recovery plans and failover sequence o Configure bandwidth throttling settings if required o Configure monitoring and alerting for replication health
o Configure encryption settings o Configure role-based access controls o Configure secure communication channels o Validate audit logging and monitoring o Configure replication security policies Deliverables
5.3 Deployment Phase Once the initial configuration for Azure Virtual Machines and Site Recovery is complete, the following Azure activities will begin. The Key activities under this phase are as follows:
o Business application testing o Validation of services and workloads
Deliverables:
5.4 Post Deployment During this phase, we will conduct training and ensure proper turnover of the Completed project to BOI.
o Conduct testing and demonstration of live functionality
o As Built Documentation o Issues Encountered and resolutions applied during implementation
Deliverables:
The winning bidder shall provide Three (3) Year Maintenance and Technical support for Azure Environment as provided in the scope of works and technical support services, addressing both critical operational issues and non-critical technical concerns. The support service shall include:
Response Time is the time lapse from the time of acceptance of the service request to the time of resource commitment. The table below describes our applicable response time for the maintenance support after project closure. Severity Level Response Time Level 1 The system is down or seriously impacted, or data is lost or destroyed, and there is no reasonable workaround currently available. Within 1-2 hours once BOI requested for a support (On-site technical assistance) Level 2 The system issue is not critical; no data has been lost, and the system has not failed. The issue may be temporarily circumvented using a well-known and available workaround Phone & Email: within 3.0 hrs.
The service provider must have the necessary eligibility, experience, and expertise in providing the service, with the following credentials:
Procurement of an Enterprise Virtualization Modernization Solution with Hybrid Cloud Integration and Disaster Recovery Infrastructure shall be undertaken through Competitive Bidding pursuant to RA No. 12009, the New Government Procurement Act (NGPA) and its Implementing Rules and Regulations.
A budget ceiling of THIRTY MILLION FIVE HUNDRED THOUSAND PESOS (PhP 30,500,000.00) has been approved and earmarked for the Procurement of an Enterprise Virtualization Modernization Solution with Hybrid Cloud Integration and Disaster Recovery Infrastructure, including all incidental expenses for the duration of the project. Prices are in PHP Peso and are VAT inclusive.
The delivery and commissioning of all items for the Server Virtualization Project shall not exceed 150 calendar days upon issuance of the corresponding Notice to Proceed (NTP). The commissioning and initial testing shall be conducted within 2-3 calendar days after each component is completed and witnessed and accepted by the end user. After completion of the Server Virtualization Project, the BAC-TWG together with end user shall conduct Functionality and User Acceptance Tests. This will ensure that all of the project's specifications and requirements are met. The winning bidder must provide in hard and soft copies detailed project documentation of the following: a. Project Implementation Plan with Timetable, b. Installation and configuration manual, c. Incident and problem escalation procedure with a list of designated technical support engineers, d. SLA (Service Level Agreement) e. User Acceptance Test Plan
The winning bidder shall provide hands-on and face-to-face in-depth technical training to for at least five (5) designated BOI ITD Personnel for at least three (3) days for the whole module. Training shall cover:
The training program shall include hands-on exercises, demonstrations, and practical laboratory activities using the actual implemented solution and operational environment. The training shall be completed prior to the issuance of the Certificate of Project Completion and Acceptance to ensure that designated five (5) Information Technology Division personnel have acquired the necessary knowledge and technical competencies to administer, operate, maintain, monitor, troubleshoot, and support the implemented solution.
The budget authorized for Procurement of an Enterprise Virtualization Modernization Solution with Hybrid Cloud Integration and Disaster Recovery Infrastructure shall be sourced from the 2026 Capital Outlay (CO) and Maintenance and Other Operating. Expenses (MOOE), pursuant to the Philippine General Appropriation Act of 2026.
10% Project Mobilization: Covers initial costs, including project planning and resource allocation, and submits the Project Implementation Plan including the risk management plan 25% Upon Delivery, implementation, and Acceptance of the Two (2) Physical Server and its components (storage, power supply, power cords, transceivers, fiber optic cables, etc.) 25% Upon implementation, configuration, and Acceptance of Hybrid Environment with Disaster Recovery 15% Upon submission of Certification of 100% Completion of Microsoft Azure under existing Enterprise Agreement-Server and Cloud Enrollment (EA-SCE). 15 % Upon submission of completion for the Services for Virtualization Installation and Initial Configuration for Azure Backup and Site Recovery 5% Training of FAS-ITD personnel for the completed Enterprise Virtualization Modernization Solution. 5% Retention Fee 100%
In case there is a delay in the delivery and installation of the software where BOI is not at fault, the contracted service provider shall be subject to sanctions as specified in the contract to be signed by both parties based on the applicable provisions of the Procurement Law.
The Board of Investments (BOI), through the Head of the Procuring Entity (HoPE), reserves the right to reject any and all Bids, declare a failure of bidding, or not award the contract in accordance with Section 70 of Republic Act No. 12009, otherwise known as the “New Government Procurement Act,” and its Implementing Rules and Regulations (IRR), without thereby incurring any liability to the affected bidder or bidders.
Pursuant to Section 11.2 of the Implementing Rules and Regulations of Republic Act No. 12009
Accordingly, the explicit reference to the brand name "Microsoft Azure" is made strictly for reasons of technical compatibility and interoperability with the agency's existing system. This brand reference is necessary to preserve the overall performance, functionality, and useful life of the Procuring Entity's current IT investments, in full compliance with Section 11.2 of the Implementing Rules and Regulations (IRR) of Republic Act No. 12009 (New Government Procurement Act) Pre-bid Conference Date Time Venue 04/11/2026 10:00 AM MS TEAMS Other Information Please register for the Pre-Bid Conference for the Procurement of an Enterprise Virtualization Modernization Solution scheduled on November 4, 2026, by completing the registration form below: Registration Form: https://forms.cloud.microsoft/r/b5MKLy6ygC?origin=lprLink The Microsoft Teams meeting link and details will be provided upon successful registration. Thank you! Created by Jerry Rojas Pajarillo Date Created 26/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 27, 2026, 12:00 AM
Nov 24, 2026, 9:00 AM
24 days leftOct 28, 2026, 1:12 AM
Oct 28, 2026, 1:12 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 28, 2026, 1:12 AM; last database update Oct 28, 2026, 1:12 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.