Construction ProjectsOpen · stored

Construction of Hanging Footbridge, Brgy. Yabon, Janiuay, Iloilo

Buying agencyMUNICIPALITY OF JANIUAY, ILOILO

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱6,500,000.00
Time remaining18 days leftDeadline Nov 18, 2026, 10:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
Company screening is not checkedCheck status
Why this matters

Relevance does not establish whether your company meets the bid requirements.

Next action
Check my company

Use the supporting sections below to verify the evidence.

Reference 13307770

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

ITEM NO. DESCRIPTION QUANTITY 1 TO SUPPLY OF LABOR & MATERIALS FOR THE CONSTRUCTION OF HANGING FOOTBRIDGE, BRGY. YABON, JANIUAY,ILOILO WITH THE FOLLOWING SCOPE OF WORKS; 1 JOB PART A. FACILITIES FOR THE ENGINEER A.1.1 (8) PROVISION OF FIELD OFFICE FOR THE ENGINEER (RENTAL BASIS) QUANTITY: 4.04 MONTH PART B. OTHER GENERAL REQUIREMENTS B.5 PROJECT BILLBOARD/SIGNBOARD QUANTITY: 2.00 EACH B.7(2) OCCUPATIONAL SAFETY AND HEALTH PROGRAM QUANTITY: 1.00 ls B.9 MOBILIZATION/DEMOBILIZATION QUANTITY: 1.00 ls PART C. EARTHWORKS 103(2)a1 BRIDGE STUCTURE EXCAVATION (COMMON SOIL) QUANTITY: 231.50 cu.m. 104(1)a EMBANKMENT FROM ROADWAY/STRUCTURE EXCAVATION (COMMON SOIL) QUANTITY: 235.11 cu.m. 104(2)a EMBANKMENT FROM BORROW (COMMON SOIL) QUANTITY: 235.35 cu.m. PART D. SUBBASE AND BASE COURSE 200(1) AGGREGATE SUBBASE COURSE QUANTITY: 135.00 cu.m. PART E. SURFACE COURSES 311(1)b1 PORTLAND CEMENT CONCRETE PAVEMENT (UNREINFORCED),0.20M. THICK, 14 DAYS QUANTITY: 480.00 sq.m. PART F. BRIDGE CONSTRUCTION 400(4)a1 PRECAST CONCRETE PILES, FURNISHED (400MMX400MM) QUANTITY: 64.00 m. 400(14)PRECAST CONCRETE PILES, DRIVEN QUANTITY: 64.00 m. 403(5)a1 STRUCTURAL STEEL, FURNISHED, FABRICATED AND ERECTED, GRADE 36 QUANTITY: 8,576.25 kg. 404(1)a REINFORCING STEEL GRADE 40 QUANTITY: 3,436.77 kg. 404(1)b REINFORCING STEEL GRADE 60 QUANTITY: 4,433.84 kg. 405(1)b3 STRUCTURAL CONCRETE CLASS "A", 27.58 MPA, 28 DAYS QUANTITY: 123.47 cu.m 407(8) LEAN CONCRETE, CLASS "B" (16.5 Mpa) QUANTITY: 5.14 cu.m. PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES 505(2)a GROUTED RIPRAP (CLASS A) QUANTITY: 104.65 cu.m. PART I. MATERIALS DETAILS 710 (1) REINFORCING STEEL AND WIRE ROPE QUANTITY: 2,103.01 Kg. 711(1) FENCE AND GUARDRAIL QUANTITY: 196.00 sq.m. 712(1) STRUCTURAL METAL (CHECKERED PLATE) QUANTITY: 3,327.27 kg. Pre-bid Conference Date Time Venue 03/11/2026 9:00 AM New Conference Room, 2nd Floor Municipal Hall Building, Janiuay, Iloilo Created by Anagen B. Clavecillas Date Created 26/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

Submission & process

Pre-Bid Conference

Known from stored extraction

Required in stored extraction

A specific pre-bid conference is identified in the procurement notice.

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Stored timeline

Important dates

Published · Manila

Oct 27, 2026, 12:00 AM

Deadline · Manila

Nov 18, 2026, 10:00 AM

18 days left
First saved / captured

Oct 28, 2026, 1:22 AM

Last database update

Oct 28, 2026, 1:22 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13307770
Original stored title
Construction of Hanging Footbridge, Brgy. Yabon, Janiuay, Iloilo
Original buying agency
MUNICIPALITY OF JANIUAY, ILOILO
Stored status
active
View original stored description
Construction of Hanging Footbridge, Brgy. Yabon, Janiuay, Iloilo ITEM NO. DESCRIPTION QUANTITY 1 TO SUPPLY OF LABOR & MATERIALS FOR THE CONSTRUCTION OF HANGING FOOTBRIDGE, BRGY. YABON, JANIUAY,ILOILO WITH THE FOLLOWING SCOPE OF WORKS; 1 JOB PART A. FACILITIES FOR THE ENGINEER A.1.1 (8) PROVISION OF FIELD OFFICE FOR THE ENGINEER (RENTAL BASIS) QUANTITY: 4.04 MONTH PART B. OTHER GENERAL REQUIREMENTS B.5 PROJECT BILLBOARD/SIGNBOARD QUANTITY: 2.00 EACH B.7(2) OCCUPATIONAL SAFETY AND HEALTH PROGRAM QUANTITY: 1.00 ls B.9 MOBILIZATION/DEMOBILIZATION QUANTITY: 1.00 ls PART C. EARTHWORKS 103(2)a1 BRIDGE STUCTURE EXCAVATION (COMMON SOIL) QUANTITY: 231.50 cu.m. 104(1)a EMBANKMENT FROM ROADWAY/STRUCTURE EXCAVATION (COMMON SOIL) QUANTITY: 235.11 cu.m. 104(2)a EMBANKMENT FROM BORROW (COMMON SOIL) QUANTITY: 235.35 cu.m. PART D. SUBBASE AND BASE COURSE 200(1) AGGREGATE SUBBASE COURSE QUANTITY: 135.00 cu.m. PART E. SURFACE COURSES 311(1)b1 PORTLAND CEMENT CONCRETE PAVEMENT (UNREINFORCED),0.20M. THICK, 14 DAYS QUANTITY: 480.00 sq.m. PART F. BRIDGE CONSTRUCTION 400(4)a1 PRECAST CONCRETE PILES, FURNISHED (400MMX400MM) QUANTITY: 64.00 m. 400(14)PRECAST CONCRETE PILES, DRIVEN QUANTITY: 64.00 m. 403(5)a1 STRUCTURAL STEEL, FURNISHED, FABRICATED AND ERECTED, GRADE 36 QUANTITY: 8,576.25 kg. 404(1)a REINFORCING STEEL GRADE 40 QUANTITY: 3,436.77 kg. 404(1)b REINFORCING STEEL GRADE 60 QUANTITY: 4,433.84 kg. 405(1)b3 STRUCTURAL CONCRETE CLASS "A", 27.58 MPA, 28 DAYS QUANTITY: 123.47 cu.m 407(8) LEAN CONCRETE, CLASS "B" (16.5 Mpa) QUANTITY: 5.14 cu.m. PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES 505(2)a GROUTED RIPRAP (CLASS A) QUANTITY: 104.65 cu.m. PART I. MATERIALS DETAILS 710 (1) REINFORCING STEEL AND WIRE ROPE QUANTITY: 2,103.01 Kg. 711(1) FENCE AND GUARDRAIL QUANTITY: 196.00 sq.m. 712(1) STRUCTURAL METAL (CHECKERED PLATE) QUANTITY: 3,327.27 kg. Pre-bid Conference Date Time Venue 03/11/2026 9:00 AM New Conference Room, 2nd Floor Municipal Hall Building, Janiuay, Iloilo Created by Anagen B. Clavecillas Date Created 26/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Freshness: First saved / captured Oct 28, 2026, 1:22 AM; last database update Oct 28, 2026, 1:22 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.