Pre-Bid Conference
Known from stored extractionA specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Buying agencyNATIONAL IRRIGATION ADMINISTRATION - IMO LA UNION
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
Relevance does not establish whether your company meets the bid requirements.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
I. GENERAL REQUIREMENTS a. Project Billboard/ Sign Board II. CONSTRUCTION SAFETY AND HEALTH III. TEMPORARY WORKS, CONSTRUCTION PLANT, MOBILIZATION OF CONSTRUCTION EQUIPMENT AND DEMOBILIZATION WORK a. Mobilization & Demobilization Works IV. WELL DRILLING V. WELL CASING AND WELL DEVELOPMENT a. Well Cleaning and Development b. Gravel Pack/ Gravel Filter c. uPVC Pipe c.1 Supply, Delivery and Installation of 8” Ø uPVC Pipe Casing withCentralizer d. HDG Pipe d.1. Supply, Delivery and Installation of 3” Ø HDG Pipe Sched. 40 e. Concrete Base VI. PUMPING TEST VII. SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMP, PIPING AND ACCESSORIES a. Supply and Delivery of Materials a.1 Submersible Solar Water Pump, 15hp a.2 4"Ø Flow Meter a.3 Hydraulic Control Valve a.4 Supply and Delivery 4"Ø HDG Steel Pipe SC 40 & Fittings b. Installation of Materials VIII. SUPPLY, DELIVERY AND INSTALLATION OF SOLAR PANELS a. Supply and Delivery of Materials a.1 PVC Modules (Solar Panel – Monocrystalline 700 watts min.) a.2 MC4 Connector a.3 DC Cable from PV String a.4 AC Cable a.5 1” diam. PVC Electrical Conduit a.6 Grounding b. Installation of Materials IX. SOLAR INVERTER AND CONTROLLER a. Supply and Delivery of Solar Inverter and Controller for15 HP b. Installation of Solar Inverter and Controller X. MOUNTING STRUCTURE a. Mounting Structure a.1 Supply, Delivery and Fabrication of Mounting Structure a.2 Installation Mounting Structure b. Structure Excavation (Manual) c. Structure Backfill with Compaction (Manual) d. Concrete Structures d.1 Concrete Structure, 211 kg/sq.cm., Class A e. Reinforcing Steel Bars, All Sizes e.1 Furnishing and Stockpiling e.2 Cutting, Bending and Placing f. Gravel Blanket XI. AI SATELLITE ASSISTED MONITORING SYSTEM a. Supply and Delivery of AI Satellite Assisted Monitoring System b. Installation of AI Satellite Assisted Monitoring XII. DISTRIBUTION PIPES a. Supply and Delivery of HDPE SDR. 17, 4”Ø x 6m Pipe b. Supply and Delivery of HDPE SDR. 17, 2”Ø x 6m Pipe c. Supply and Delivery of HDPE SDR. 17 Fittings d. Installation of Distribution Pipes XIII. TESTING AND COMMISSION a. Testing and Commissioning of Pumping System Pre-bid Conference Date Time Venue 05/11/2026 10:00 AM LA UNION IMO CONFERENCE ROOM SAN JOSE NORTE, AGOO, LA UNION Created by Rhea Maiquez Santiago Date Created 27/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 28, 2026, 12:00 AM
Nov 17, 2026, 2:00 PM
17 days leftOct 28, 2026, 1:27 AM
Oct 28, 2026, 1:27 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 28, 2026, 1:27 AM; last database update Oct 28, 2026, 1:27 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.