Construction ProjectsOpen · stored

Construction of Multi-Purpose Building for Child Development Center at Brgy. San Francisco, Tiaong, Quezon

Buying agencyMUNICIPALITY OF TIAONG, QUEZON

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱3,499,823.98
Time remaining23 days leftDeadline Nov 23, 2026, 3:00 PM
Company screeningCompany screening has not been run for this bid.
Main thing to check
No active requirements are storedNeeds verification
Why this matters

The complete eligibility conditions must be checked in the official bidding documents.

Next action
Review official notice

Use the supporting sections below to verify the evidence.

Reference 13313750

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

B.5 Project Billboard/Signboard Quantity: 1.00 each Materials: Ordinary Plywood ( 1/2" x 4' x 8') 2.00 pcs. Coco Lumber (2" x 3" x 12') 5.00 pcs. Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kg. Labor: 1 Carpenter 0.50 day 2 Laborer 0.50 day B.7 Construction Safety and Health Quantity: 1.00 lot Materials Safety Helmet 15.00 pc(s) Hand Gloves 15.00 pair(s) Safety Shoes 15.00 pair(s) Misc (Medicine, Medicine Cabinet, Water, First Aid Kit) 1.00 lot 803(1)a Structure Excavation, Common Soil Quantity: 41.10 cu.m Labor 1 Foreman 2.00 days 3 Laborer 2.00 days Equipment 1 Backhoe (0.80 cu.m) 3.00 hour 1 Dump Truck (12 cu.yd) 3.00 hour 804(1)a Embankment from Structure Excavation Quantity: 24.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 4.00 hour 1 Plate Compactor 4.00 hour 804(2)a Embankment from Borrow Quantity: 24.30 cu.m Materials Common Borrow 31.00 cu.m Labor 1 Foreman 1.00 day 3 Laborer 1.00 day Equipment 1 Backhoe (0.80 cu.m) 4.00 hour 1 Plate Compactor 4.00 hour 804(7) Gravel Fill Quantity 14.41 cu.m Materials Gravel Fill 16.00 cu.m Labor 1 Foreman 2.00 days 3 Laborer 2.00 days Equipment 1 Plate Compactor 13.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)c Structural Concrete (3000 psi, Class A, 28 days) Quantity 16.40 cu.m Materials Ready Mix Concrete 3000Psi @ 28 Days 18.00 cu.m Labor 1 Foreman 2.50 days 2 Skilled Laborer 2.50 days 6 Laborer 2.50 days Equipment 2 Concrete Vibrator 7.00 hour 1 Pumpcrete 4.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)d Structural Concrete (4000 psi, Class A, 28 days) Quantity 17.60 cu.m Materials Ready Mix Concrete 4000Psi @ 28 Days 19.00 cu.m Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 6 Laborer 4.00 days Equipment 2 Concrete Vibrator 10.00 hour 1 Pumpcrete 5.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a1 Reinforcing Steel (Deformed) Grade 40 Quantity 1,367.00 kg Materials Reinforcing Steel Bars Deformed Grade 40 1,435.00 kg GI Tie Wire #16 22.00 kg Labor 1 Foreman 2.00 days 3 Skilled Laborer 2.00 days 8 Laborer 2.00 days Equipment 1 Bar Cutter 6.00 hour 1 Bar Bender 6.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a2 Reinforcing Steel (Deformed) Grade 60 Quantity 1,202.50 kg Materials Reinforcing Steel Bars Deformed Grade 60 1,263.00 kg GI Tie Wire #16 19.00 kg Labor 1 Foreman 3.00 days 3 Skilled Laborer 3.00 days 8 Laborer 3.00 days Equipment 1 Bar Cutter 6.00 hour 1 Bar Bender 6.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 903(2) Formworks and Falseworks Quantity 170.80 sq.m Materials Phenolic Board - 1.22m x 2.44m x 18mm 15.00 pc Good Lumber 270.00 bd.ft Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Stripping 1 Foreman 2.00 days 2 Laborer 2.00 days Equipment 40 H-Frame 1.7 m x 1.2m, set 12.00 hrs 2pcs H-frames 4pcs diagonal cross braces 4pcs Horizontal cross braces 8pcs joint pins 62 Shoring Jack,3.8 m full extension 12.00 hrs 80 Adj. U-Head Jack, 0.60m 12.00 hrs 80 Adj. Base Jack, 0.60m 12.00 hrs 62 1-1/2" GI Pipe x 6.0 m 12.00 hrs 16 1-1/2" GI Pipe x 3.0 m 12.00 hrs 32 1-1/2" GI Pipe x 4.0 m 12.00 hrs 216 1-1/2" GI Pipe x 1.0 m 12.00 hrs 278 Tie Rod x 0.60m 12.00 hrs 558 Round Wing Not 12.00 hrs 1000(1) Soil Poisoning Quantity 3.00 liter Materials Soil Poisoning 3.00 lit Labor 1 Foreman 0.50 day 1 Skilled Laborer 0.50 days 1 Laborer 0.50 day Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100mm Quantity 61.60 sq.m Materials CHB Ordinary (101mm x 203mm x 406mm) 801.00 pcs Portland Cement 33.00 bag Sand 3.00 cu.m Reinforcing Steel Bars Deformed Grade 40 200.00 kg GI Tie Wire #16 4.00 kg Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 3 Laborer 4.00 days Equipment 1 One Bagger Mixer 17.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150mm Quantity 114.40 sq.m. Materials CHB Ordinary (150mm x 230mm x 406mm) 1,488.00 pcs Portland Cement 61.00 bag Sand 5.00 cu.m Reinforcing Steel Bars Deformed Grade 40 371.00 kg GI Tie Wire #16 6.00 kg Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 3 Laborer 7.00 days Equipment 1 One Bagger Mixer 36.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1010(2)a Doors, Flush Quantity 7.56 sq.m. Materials Flush Hollow Core Door with Door Jamb 4.20 sq.m PVC Swing Door with Door Jamb 3.36 sq.m Door Locks (Schlage or Equivalent) 4.00 set Door Hinge (50mm x 101mm) 16.00 pc Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days 1008(1)c Aluminum Glass Window (Awning Type) Quantity 9.84 sq.m Materials Aluminum framed Glass Window (Awning Type) 9.84 sq.m Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1027(1) Cement Plaster Finish Quantity 299.5 sq.m Materials Portland Cement 99.00 bag Sand 9.00 cu.m Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Quantity 96.8 sq.m Materials 15mm thick Armstrong acoustic ceiling/Fiber cement board 27.00 pcs Pre-painted Spandrel 24.03 sq.m Metal Furring 3m length 110.00 pcs Carrying Channels 35.00 pcs Hanger Bars/Rod 97.00 pcs Channel clip 581.00 pcs Wall Angle 24.00 pcs Rivets 1,356.00 pcs 1" Metal Screw 388.00 pcs Labor 1 Foreman 10.00 days 2 Skilled Laborer 10.00 days 2 Laborer 10.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1038(1) Reflective Insulation Quantity 96.8 sq.m Materials Reflective Insulation, 10 mm thk 97.00 sq.m Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(2) Unglazed Tiles Quantity 86.7 sq.m Materials Ceramic Unglazed Tiles 92.00 sq.m Portland Cement 29.00 bags Sand 3.00 cu.m Tile Grout 11.00 bags Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 2 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-I Finishing Works Quantity 1.00 lot Materials Decorative Red Brick 1.00 lot Acrylic Lettering 1.00 lot PWD Ramp Railing (Painted GI Pipe) 1.00 lot Window Grills 105.92 sq.ft. Consumables 1.00 lot Labor 1 Foreman 6.00 days 2 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)a Painting Works (Masonry/Concrete) Quantity 299.5 sq.m Materials Concrete Neutralizer 6.00 gal Concrete Sealer/Primer 12.00 gal Patching Compound 15.00 gal Semi-Gloss Latex (2 coats only) 24.00 gal Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)c Painting Works (Steel) Quantity 167.1 sq.m Materials Red Oxide Primer 7.00 gal Flat Wall Enamel 17.00 gal Paint Thinner 42.00 liter Tinting Color 2.00 liter Consumables 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1014(1)b2 Prepainted Metal Sheets (above 0.427mm) Rib Type Long Span Quantity 98.55 sq.m. Materials Long Span Rib Type Colored Roof, Ga. 26 104.00 sq.m. Tekscrew 986.00 pcs Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 6.00 days 2 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(7) Structural Steel Quantity 1.00 l.s Materials Structural Steel Truss 1,378.40 kg Acetylene 16.00 kg Oxygen 31.00 kg Welding Rod 28.00 kg Consumables Materials (1% of Matl. Cost) 1.00 lot Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 2 Laborer 8.00 days Erection 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Welding Machine, Electric Driven/DC Output, 500 Amp 20.00 hours 1 Cutting Outfit 14.00 hours 1 Grinding Machine and Accessories 20.00 hours 1 Cargo/Service Truck, 2-5 mt, 160 hp 4.00 hours 1 Boom Truck, NXG1160D3ZAL1X, 197 hp 5.00 hours 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(8)b Structural Steel (Purlins) Quantity 3,446.70 kg Materials Structural Steel Purlins 3,482.00 kg Welding Rod 69.00 kg Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 4 Laborer 7.00 days Equipment 2 Welding Machine, Electric Driven/DC Output, 500 Amp 45.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(5) Metal Structure Accessories Quantity 399.26 kg Materials Steel Plates 329.00 kg Sagrod with nuts & Bolts 23.33 kg Cross Bracing 46.93 kg 16mm Ø turn buckles 16.00 pc Bolts and Rods 40.00 ea Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)b Fabricated Metal Roofing Accessory (Flashing, Ga. 26) Quantity 32.40 l.m Materials Pre-painted flashing, Ga.24 (0.701mm) x 2.44mm 35.00 m Blind Rivets 616.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)c Fabricated Metal Roofing Accessory (Gutter, Ga. 24) Quantity 32.40 l.m Materials Pre-painted Gutter, Ga. 24 (0.701 mm) X 2.44 m 33.00 m 12" x 1" Plain GI Strap 98.00 pc Blind Rivets 519.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(8) Sewer Line Works Quantity 1.00 l.s. Materials PVC Pipe, 150mm Ø x 3m 4.00 pcs PVC Pipe, 100mm Ø x 3m 6.00 pcs PVC Pipe, 50mm Ø x 3m 11.00 pcs Reducer 100mm x 50mm 14.00 pcs WYE 100 mm 10.00 pcs Elbow 100 mm 3.00 pcs PVC Pipe, 50 mm Elbow 13.00 pcs PVC Elbow 45 deg. 50mm Ø 8.00 pcs PVC Elbow 45 deg. 100mm Ø 8.00 pcs Sanitary Tee 50 mm 13.00 pcs Sanitary Tee 100 mm 3.00 pcs Coupling 50 mm 9.00 pcs Coupling 100 mm 10.00 pcs Coupling 150 mm 3.00 pcs P-Trap 6.00 pcs Cleanout 3.00 pcs PVC Solvent Cement 8.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(24) Cold Water lines Quantity 1.00 l.s. Materials PPRC CWL, 32mm Ø X 4m 8.00 pcs PPRC CWL, 50mm Ø X 4m 2.00 pcs PPRC CWL Coupling, 32mm Ø 5.00 pcs PPRC CWL Elbow 90 deg, 32mm Ø 27.00 pcs PPRC CWL Elbow 90 deg, 50mm Ø 4.00 pcs PPRC CWL Tee, 32mm Ø 11.00 pcs PPRC CWL Reducer coupling, 32mm Ø x 50mm Ø 2.00 pcs Reserved Tank 1000L 1.00 unit Male/Female Adapter 10.00 pcs Ball Valve 32mm 2.00 pcs Teflon Tape 10.00 pcs Hose Bibb 1.00 pcs Gate valve 2.00 pcs Check Valve 1.00 pcs Water meter 1.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(9) Storm Drainage and Downspout Quantity 1.00 l.s. Materials 100mm Ø PVC DS 8.00 pcs 100mm Ø PVC Pipe 90deg elbow 8.00 pcs 100mm Ø PVC Pipe Coupling 6.00 pcs Roof Drain (Dome Type Strainer) 4.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(4) Plumbing FIxtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc. (round) american std or equivalent 2.00 pcs Lavatory inc. fittings & acc. American std or equivalent 2.00 pcs Floor Drain 3.00 pcs Stainless Sink-Double 1.00 pcs Deck Mounted Faucet 3.00 pcs Stainless Wall Faucet 7.00 pcs Bidet Set 2.00 pcs Consumables (3% of Material Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(11) Septic Vault/ Tank (Concrete / CHB) Quantity 1.00 l.s. Materials Portland Cement 68.00 bags Sand 5.00 cu.m. Gravel 6.00 sq.m. Reinforcing Steel Bar 916.00 kgs G.I. Wire 26.00 kgs Lumber, Good - 4 uses 164.00 bd-ft Marine Plywood (1/2"x4"x8') 13.00 pc Assorted CWN (1kg/100bd.ft) 4.00 kgs Water Proofing Cement (Sahara or Equivalent) 13.00 bags Brass Clean-out 4.00 pc Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(5)b Catch Basin (CHB) Quantity 4.00 each Materials Portland Cement 8.00 bags Sand 1.00 cu.m Gravel 3/4 1.00 cu.m RSB Grade 40, 10 mm 45.00 kgs #16 Galvanized Iron Wire 1.00 kgs Metal Grating 19.00 kgs CHB, Non Load Bearing, 4" 52.00 pcs Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) Quantity 1.00 l.s. Materials 20 mmØ uPVC conduit 60.00 l.m 20 mmØ PVC Adapter 30.00 l.m RSC Pipe 1" 1.00 pc Utility box, deep type 40.00 pc junction box, deep type 20.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1101(33) Wires and Wiring Devices Quantity 1.00 l.s. Materials Wires THWN/THHN 5.5 mm2 40.00 l.m. Wires THWN/THHN 14 mm2 8.00 l.m. Wires THWN/THHN 8.0 mm2 1.00 box Wires THWN/THHN 3.5 mm2 80.00 l.m. Wires THWN/THHN 2.0 mm2 120.00 l.m. One-gang Switch 2.00 set Two-Gang Switch 2.00 set Three-Gang Switch 1.00 set Duplex Convenience Outlet 7.00 set Special Purpose Outlet 1.00 set Tape, bolt&nut etc. 1.00 lot Split Type Aircon 2 HP 1.00 lot Exhaust Fan 1.00 lot JB cover clamps, screw and anchors 1.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 7.00 days 1 Skilled Laborer 7.00 days 3 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(1) Panelboard with Main & Branch Breakers Quantity 1.00 l.s. Materials Circuit Breaker 1.00 lot Panelboard Nema 3R 1.00 lot Weather Tight Connector 1" 2.00 pcs Grounding Clamp 5/8 1.00 pc Grounding Rod 5/8 1.00 pc Secondary Rack Single Spool 1.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1103(1) Lighting Fixtures Quantity 1.00 l.s. Materials 12 watts Recessed Ceiling-mounted LED Box-type light 9.00 set T8 18w Louver Type Double Tube Fluorescent Daylight 6.00 set Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 2 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1208 Fire Alarm System & Fire Extinguishers Quantity 1.00 l.s. Materials Manual Fire Alarm w/ Switch 1.00 set Fire Extinguisher 2.00 pcs Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

No active requirements are stored.

Review the official notice and bidding documents for the complete requirements.

Stored timeline

Important dates

Published · Manila

Oct 29, 2026, 12:00 AM

Deadline · Manila

Nov 23, 2026, 3:00 PM

23 days left
First saved / captured

Oct 29, 2026, 6:49 AM

Last database update

Oct 29, 2026, 6:49 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13313750
Original stored title
Construction of Multi-Purpose Building for Child Development Center at Brgy. San Francisco, Tiaong, Quezon
Original buying agency
MUNICIPALITY OF TIAONG, QUEZON
Stored status
active
View original stored description
B.5 Project Billboard/Signboard Quantity: 1.00 each Materials: Ordinary Plywood ( 1/2" x 4' x 8') 2.00 pcs. Coco Lumber (2" x 3" x 12') 5.00 pcs. Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kg. Labor: 1 Carpenter 0.50 day 2 Laborer 0.50 day B.7 Construction Safety and Health Quantity: 1.00 lot Materials Safety Helmet 15.00 pc(s) Hand Gloves 15.00 pair(s) Safety Shoes 15.00 pair(s) Misc (Medicine, Medicine Cabinet, Water, First Aid Kit) 1.00 lot 803(1)a Structure Excavation, Common Soil Quantity: 41.10 cu.m Labor 1 Foreman 2.00 days 3 Laborer 2.00 days Equipment 1 Backhoe (0.80 cu.m) 3.00 hour 1 Dump Truck (12 cu.yd) 3.00 hour 804(1)a Embankment from Structure Excavation Quantity: 24.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 4.00 hour 1 Plate Compactor 4.00 hour 804(2)a Embankment from Borrow Quantity: 24.30 cu.m Materials Common Borrow 31.00 cu.m Labor 1 Foreman 1.00 day 3 Laborer 1.00 day Equipment 1 Backhoe (0.80 cu.m) 4.00 hour 1 Plate Compactor 4.00 hour 804(7) Gravel Fill Quantity 14.41 cu.m Materials Gravel Fill 16.00 cu.m Labor 1 Foreman 2.00 days 3 Laborer 2.00 days Equipment 1 Plate Compactor 13.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)c Structural Concrete (3000 psi, Class A, 28 days) Quantity 16.40 cu.m Materials Ready Mix Concrete 3000Psi @ 28 Days 18.00 cu.m Labor 1 Foreman 2.50 days 2 Skilled Laborer 2.50 days 6 Laborer 2.50 days Equipment 2 Concrete Vibrator 7.00 hour 1 Pumpcrete 4.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)d Structural Concrete (4000 psi, Class A, 28 days) Quantity 17.60 cu.m Materials Ready Mix Concrete 4000Psi @ 28 Days 19.00 cu.m Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 6 Laborer 4.00 days Equipment 2 Concrete Vibrator 10.00 hour 1 Pumpcrete 5.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a1 Reinforcing Steel (Deformed) Grade 40 Quantity 1,367.00 kg Materials Reinforcing Steel Bars Deformed Grade 40 1,435.00 kg GI Tie Wire #16 22.00 kg Labor 1 Foreman 2.00 days 3 Skilled Laborer 2.00 days 8 Laborer 2.00 days Equipment 1 Bar Cutter 6.00 hour 1 Bar Bender 6.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a2 Reinforcing Steel (Deformed) Grade 60 Quantity 1,202.50 kg Materials Reinforcing Steel Bars Deformed Grade 60 1,263.00 kg GI Tie Wire #16 19.00 kg Labor 1 Foreman 3.00 days 3 Skilled Laborer 3.00 days 8 Laborer 3.00 days Equipment 1 Bar Cutter 6.00 hour 1 Bar Bender 6.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 903(2) Formworks and Falseworks Quantity 170.80 sq.m Materials Phenolic Board - 1.22m x 2.44m x 18mm 15.00 pc Good Lumber 270.00 bd.ft Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Stripping 1 Foreman 2.00 days 2 Laborer 2.00 days Equipment 40 H-Frame 1.7 m x 1.2m, set 12.00 hrs 2pcs H-frames 4pcs diagonal cross braces 4pcs Horizontal cross braces 8pcs joint pins 62 Shoring Jack,3.8 m full extension 12.00 hrs 80 Adj. U-Head Jack, 0.60m 12.00 hrs 80 Adj. Base Jack, 0.60m 12.00 hrs 62 1-1/2" GI Pipe x 6.0 m 12.00 hrs 16 1-1/2" GI Pipe x 3.0 m 12.00 hrs 32 1-1/2" GI Pipe x 4.0 m 12.00 hrs 216 1-1/2" GI Pipe x 1.0 m 12.00 hrs 278 Tie Rod x 0.60m 12.00 hrs 558 Round Wing Not 12.00 hrs 1000(1) Soil Poisoning Quantity 3.00 liter Materials Soil Poisoning 3.00 lit Labor 1 Foreman 0.50 day 1 Skilled Laborer 0.50 days 1 Laborer 0.50 day Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100mm Quantity 61.60 sq.m Materials CHB Ordinary (101mm x 203mm x 406mm) 801.00 pcs Portland Cement 33.00 bag Sand 3.00 cu.m Reinforcing Steel Bars Deformed Grade 40 200.00 kg GI Tie Wire #16 4.00 kg Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 3 Laborer 4.00 days Equipment 1 One Bagger Mixer 17.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150mm Quantity 114.40 sq.m. Materials CHB Ordinary (150mm x 230mm x 406mm) 1,488.00 pcs Portland Cement 61.00 bag Sand 5.00 cu.m Reinforcing Steel Bars Deformed Grade 40 371.00 kg GI Tie Wire #16 6.00 kg Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 3 Laborer 7.00 days Equipment 1 One Bagger Mixer 36.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1010(2)a Doors, Flush Quantity 7.56 sq.m. Materials Flush Hollow Core Door with Door Jamb 4.20 sq.m PVC Swing Door with Door Jamb 3.36 sq.m Door Locks (Schlage or Equivalent) 4.00 set Door Hinge (50mm x 101mm) 16.00 pc Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days 1008(1)c Aluminum Glass Window (Awning Type) Quantity 9.84 sq.m Materials Aluminum framed Glass Window (Awning Type) 9.84 sq.m Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1027(1) Cement Plaster Finish Quantity 299.5 sq.m Materials Portland Cement 99.00 bag Sand 9.00 cu.m Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Quantity 96.8 sq.m Materials 15mm thick Armstrong acoustic ceiling/Fiber cement board 27.00 pcs Pre-painted Spandrel 24.03 sq.m Metal Furring 3m length 110.00 pcs Carrying Channels 35.00 pcs Hanger Bars/Rod 97.00 pcs Channel clip 581.00 pcs Wall Angle 24.00 pcs Rivets 1,356.00 pcs 1" Metal Screw 388.00 pcs Labor 1 Foreman 10.00 days 2 Skilled Laborer 10.00 days 2 Laborer 10.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1038(1) Reflective Insulation Quantity 96.8 sq.m Materials Reflective Insulation, 10 mm thk 97.00 sq.m Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(2) Unglazed Tiles Quantity 86.7 sq.m Materials Ceramic Unglazed Tiles 92.00 sq.m Portland Cement 29.00 bags Sand 3.00 cu.m Tile Grout 11.00 bags Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 2 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-I Finishing Works Quantity 1.00 lot Materials Decorative Red Brick 1.00 lot Acrylic Lettering 1.00 lot PWD Ramp Railing (Painted GI Pipe) 1.00 lot Window Grills 105.92 sq.ft. Consumables 1.00 lot Labor 1 Foreman 6.00 days 2 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)a Painting Works (Masonry/Concrete) Quantity 299.5 sq.m Materials Concrete Neutralizer 6.00 gal Concrete Sealer/Primer 12.00 gal Patching Compound 15.00 gal Semi-Gloss Latex (2 coats only) 24.00 gal Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)c Painting Works (Steel) Quantity 167.1 sq.m Materials Red Oxide Primer 7.00 gal Flat Wall Enamel 17.00 gal Paint Thinner 42.00 liter Tinting Color 2.00 liter Consumables 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1014(1)b2 Prepainted Metal Sheets (above 0.427mm) Rib Type Long Span Quantity 98.55 sq.m. Materials Long Span Rib Type Colored Roof, Ga. 26 104.00 sq.m. Tekscrew 986.00 pcs Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 6.00 days 2 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(7) Structural Steel Quantity 1.00 l.s Materials Structural Steel Truss 1,378.40 kg Acetylene 16.00 kg Oxygen 31.00 kg Welding Rod 28.00 kg Consumables Materials (1% of Matl. Cost) 1.00 lot Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 2 Laborer 8.00 days Erection 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Welding Machine, Electric Driven/DC Output, 500 Amp 20.00 hours 1 Cutting Outfit 14.00 hours 1 Grinding Machine and Accessories 20.00 hours 1 Cargo/Service Truck, 2-5 mt, 160 hp 4.00 hours 1 Boom Truck, NXG1160D3ZAL1X, 197 hp 5.00 hours 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(8)b Structural Steel (Purlins) Quantity 3,446.70 kg Materials Structural Steel Purlins 3,482.00 kg Welding Rod 69.00 kg Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 4 Laborer 7.00 days Equipment 2 Welding Machine, Electric Driven/DC Output, 500 Amp 45.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(5) Metal Structure Accessories Quantity 399.26 kg Materials Steel Plates 329.00 kg Sagrod with nuts & Bolts 23.33 kg Cross Bracing 46.93 kg 16mm Ø turn buckles 16.00 pc Bolts and Rods 40.00 ea Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)b Fabricated Metal Roofing Accessory (Flashing, Ga. 26) Quantity 32.40 l.m Materials Pre-painted flashing, Ga.24 (0.701mm) x 2.44mm 35.00 m Blind Rivets 616.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)c Fabricated Metal Roofing Accessory (Gutter, Ga. 24) Quantity 32.40 l.m Materials Pre-painted Gutter, Ga. 24 (0.701 mm) X 2.44 m 33.00 m 12" x 1" Plain GI Strap 98.00 pc Blind Rivets 519.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(8) Sewer Line Works Quantity 1.00 l.s. Materials PVC Pipe, 150mm Ø x 3m 4.00 pcs PVC Pipe, 100mm Ø x 3m 6.00 pcs PVC Pipe, 50mm Ø x 3m 11.00 pcs Reducer 100mm x 50mm 14.00 pcs WYE 100 mm 10.00 pcs Elbow 100 mm 3.00 pcs PVC Pipe, 50 mm Elbow 13.00 pcs PVC Elbow 45 deg. 50mm Ø 8.00 pcs PVC Elbow 45 deg. 100mm Ø 8.00 pcs Sanitary Tee 50 mm 13.00 pcs Sanitary Tee 100 mm 3.00 pcs Coupling 50 mm 9.00 pcs Coupling 100 mm 10.00 pcs Coupling 150 mm 3.00 pcs P-Trap 6.00 pcs Cleanout 3.00 pcs PVC Solvent Cement 8.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(24) Cold Water lines Quantity 1.00 l.s. Materials PPRC CWL, 32mm Ø X 4m 8.00 pcs PPRC CWL, 50mm Ø X 4m 2.00 pcs PPRC CWL Coupling, 32mm Ø 5.00 pcs PPRC CWL Elbow 90 deg, 32mm Ø 27.00 pcs PPRC CWL Elbow 90 deg, 50mm Ø 4.00 pcs PPRC CWL Tee, 32mm Ø 11.00 pcs PPRC CWL Reducer coupling, 32mm Ø x 50mm Ø 2.00 pcs Reserved Tank 1000L 1.00 unit Male/Female Adapter 10.00 pcs Ball Valve 32mm 2.00 pcs Teflon Tape 10.00 pcs Hose Bibb 1.00 pcs Gate valve 2.00 pcs Check Valve 1.00 pcs Water meter 1.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(9) Storm Drainage and Downspout Quantity 1.00 l.s. Materials 100mm Ø PVC DS 8.00 pcs 100mm Ø PVC Pipe 90deg elbow 8.00 pcs 100mm Ø PVC Pipe Coupling 6.00 pcs Roof Drain (Dome Type Strainer) 4.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(4) Plumbing FIxtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc. (round) american std or equivalent 2.00 pcs Lavatory inc. fittings & acc. American std or equivalent 2.00 pcs Floor Drain 3.00 pcs Stainless Sink-Double 1.00 pcs Deck Mounted Faucet 3.00 pcs Stainless Wall Faucet 7.00 pcs Bidet Set 2.00 pcs Consumables (3% of Material Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(11) Septic Vault/ Tank (Concrete / CHB) Quantity 1.00 l.s. Materials Portland Cement 68.00 bags Sand 5.00 cu.m. Gravel 6.00 sq.m. Reinforcing Steel Bar 916.00 kgs G.I. Wire 26.00 kgs Lumber, Good - 4 uses 164.00 bd-ft Marine Plywood (1/2"x4"x8') 13.00 pc Assorted CWN (1kg/100bd.ft) 4.00 kgs Water Proofing Cement (Sahara or Equivalent) 13.00 bags Brass Clean-out 4.00 pc Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(5)b Catch Basin (CHB) Quantity 4.00 each Materials Portland Cement 8.00 bags Sand 1.00 cu.m Gravel 3/4 1.00 cu.m RSB Grade 40, 10 mm 45.00 kgs #16 Galvanized Iron Wire 1.00 kgs Metal Grating 19.00 kgs CHB, Non Load Bearing, 4" 52.00 pcs Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) Quantity 1.00 l.s. Materials 20 mmØ uPVC conduit 60.00 l.m 20 mmØ PVC Adapter 30.00 l.m RSC Pipe 1" 1.00 pc Utility box, deep type 40.00 pc junction box, deep type 20.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1101(33) Wires and Wiring Devices Quantity 1.00 l.s. Materials Wires THWN/THHN 5.5 mm2 40.00 l.m. Wires THWN/THHN 14 mm2 8.00 l.m. Wires THWN/THHN 8.0 mm2 1.00 box Wires THWN/THHN 3.5 mm2 80.00 l.m. Wires THWN/THHN 2.0 mm2 120.00 l.m. One-gang Switch 2.00 set Two-Gang Switch 2.00 set Three-Gang Switch 1.00 set Duplex Convenience Outlet 7.00 set Special Purpose Outlet 1.00 set Tape, bolt&nut etc. 1.00 lot Split Type Aircon 2 HP 1.00 lot Exhaust Fan 1.00 lot JB cover clamps, screw and anchors 1.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 7.00 days 1 Skilled Laborer 7.00 days 3 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(1) Panelboard with Main & Branch Breakers Quantity 1.00 l.s. Materials Circuit Breaker 1.00 lot Panelboard Nema 3R 1.00 lot Weather Tight Connector 1" 2.00 pcs Grounding Clamp 5/8 1.00 pc Grounding Rod 5/8 1.00 pc Secondary Rack Single Spool 1.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1103(1) Lighting Fixtures Quantity 1.00 l.s. Materials 12 watts Recessed Ceiling-mounted LED Box-type light 9.00 set T8 18w Louver Type Double Tube Fluorescent Daylight 6.00 set Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 2 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1208 Fire Alarm System & Fire Extinguishers Quantity 1.00 l.s. Materials Manual Fire Alarm w/ Switch 1.00 set Fire Extinguisher 2.00 pcs Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot

Freshness: First saved / captured Oct 29, 2026, 6:49 AM; last database update Oct 29, 2026, 6:49 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.