Construction ProjectsOpen · stored

PROPOSED REPAIR AND IMPROVEMENT OF DELA RAMA HEALTH CENTER (PHASE 2) LOCATED AT BRGY. BF, PARANAQUE CITY

Buying agencyCITY OF PARAÑAQUE

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱8,051,685.16
Time remaining26 days leftDeadline Nov 26, 2026, 9:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
Company screening is not checkedCheck status
Why this matters

Relevance does not establish whether your company meets the bid requirements.

Next action
Check my company

Use the supporting sections below to verify the evidence.

Reference 13312002

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

sCOPE OF WORK: 1.General Requirements 1.1 Installation of signboards. 1.2 Installation of temporary site enclosure 1.3 Demolition, excavation, and dismantling works. 1.4 Clearing and grubbing of unsuitable soil 1.5 Clearing,cleaning,hauling and disposal of debris. 1.6 Rental of Equipment. 2.Concreting and Masonry Works 2.1 Construction of footings and wall footing 2.2 Construction of columns and beams. 2.3 Laying of gravel bedding/surface layer. 2.4 Construction of concrete slab on the perimeter of the structure 2.5 Installation of non-skid floor tiles on entrance and driveway 2.6 Installation of floor and wall tiles on new toilets 2.7 Construction of utility room (see details.) 2.8 Construction of new electrical pole 2.9 Construction of concrete perimeter fence with plaster groove or stucco finish 3.Carpentry & Formworks 3.1 Installation of formworks for columns and beams 3.2 Fabrication and installation of doors with door jambs and its accessories. 3.3 Installation of metal furring and ceiling panels 4.Roofing and Steel Works 4.1 Replacement and installation of existing polycarbonate roof to steel roof at entran 4.2 Installation of new roof panels with purlins and rafters along the driveway 4.3 Construction of steel railings on perimeter fence with steel gates 4.4 Construction of steel posts with pedestal for roof frames at driveway 4.5 Construction of new steel gate at the side of driveway 5.Painting Works 5.1 Surface preparation and skimcoating of affected areas to be painted. 5.2 Application of paints of exterior walls,fence,ceilig,and utility house 5.3 Application of primer and final coat on all affected steel structures 6.Electrical Works 6.1 Roughing-ins of wires and pipes 6.2 Installation of electrical lightings and switches 6.3 Installation of electrical convenience outlets 6.4 Installation of exhaust fans on proposed new toilets 6.5 Installation of ceiling fans at entrance waiting area 6.6 Installation of CCTV system 7.Plumbing Works 7.1 Roughing-ins of sanitary and waterline pipes 7.2 Installaton of slop sink, plumbing fixtures and accessories 7.3 Installation of water tank at utility room roof deck 7.4 Installation of new pump motor, pressure tank and accessories for water tank 7.5 Application of waterproofing at utility roofdeck, toilet walls, genset and pump room

  • Fabricated Materials

8.1 Supply & Installation of powder coated steel framed awning glass toilet windows9. Special Items 9.1 Supply & Installation of modular tables and chairs on various offices/clinics 9.2 Supply & Installation of modular shelves and hanging cabinets 9.3 Installation of Arcylic Signages and luminous signages Pre-bid Conference Date Time Venue 10/11/2026 1:30 PM People’s Hall, 9th Floor, Legislative Building, Paranaque City Hall Created by MA. CARLA JEAN SAN JUAN Date Created 27/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

Submission & process

Pre-Bid Conference

Known from stored extraction

Required in stored extraction

A specific pre-bid conference is identified in the procurement notice.

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Stored timeline

Important dates

Published · Manila

Oct 30, 2026, 12:00 AM

Deadline · Manila

Nov 26, 2026, 9:00 AM

26 days left
First saved / captured

Oct 30, 2026, 2:26 AM

Last database update

Oct 30, 2026, 2:26 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13312002
Original stored title
PROPOSED REPAIR AND IMPROVEMENT OF DELA RAMA HEALTH CENTER (PHASE 2) LOCATED AT BRGY. BF, PARANAQUE CITY
Original buying agency
CITY OF PARAÑAQUE
Stored status
active
View original stored description
sCOPE OF WORK: 1.General Requirements 1.1 Installation of signboards. 1.2 Installation of temporary site enclosure 1.3 Demolition, excavation, and dismantling works. 1.4 Clearing and grubbing of unsuitable soil 1.5 Clearing,cleaning,hauling and disposal of debris. 1.6 Rental of Equipment. 2.Concreting and Masonry Works 2.1 Construction of footings and wall footing 2.2 Construction of columns and beams. 2.3 Laying of gravel bedding/surface layer. 2.4 Construction of concrete slab on the perimeter of the structure 2.5 Installation of non-skid floor tiles on entrance and driveway 2.6 Installation of floor and wall tiles on new toilets 2.7 Construction of utility room (see details.) 2.8 Construction of new electrical pole 2.9 Construction of concrete perimeter fence with plaster groove or stucco finish 3.Carpentry & Formworks 3.1 Installation of formworks for columns and beams 3.2 Fabrication and installation of doors with door jambs and its accessories. 3.3 Installation of metal furring and ceiling panels 4.Roofing and Steel Works 4.1 Replacement and installation of existing polycarbonate roof to steel roof at entran 4.2 Installation of new roof panels with purlins and rafters along the driveway 4.3 Construction of steel railings on perimeter fence with steel gates 4.4 Construction of steel posts with pedestal for roof frames at driveway 4.5 Construction of new steel gate at the side of driveway 5.Painting Works 5.1 Surface preparation and skimcoating of affected areas to be painted. 5.2 Application of paints of exterior walls,fence,ceilig,and utility house 5.3 Application of primer and final coat on all affected steel structures 6.Electrical Works 6.1 Roughing-ins of wires and pipes 6.2 Installation of electrical lightings and switches 6.3 Installation of electrical convenience outlets 6.4 Installation of exhaust fans on proposed new toilets 6.5 Installation of ceiling fans at entrance waiting area 6.6 Installation of CCTV system 7.Plumbing Works 7.1 Roughing-ins of sanitary and waterline pipes 7.2 Installaton of slop sink, plumbing fixtures and accessories 7.3 Installation of water tank at utility room roof deck 7.4 Installation of new pump motor, pressure tank and accessories for water tank 7.5 Application of waterproofing at utility roofdeck, toilet walls, genset and pump room 8. Fabricated Materials 8.1 Supply & Installation of powder coated steel framed awning glass toilet windows9. Special Items 9.1 Supply & Installation of modular tables and chairs on various offices/clinics 9.2 Supply & Installation of modular shelves and hanging cabinets 9.3 Installation of Arcylic Signages and luminous signages Pre-bid Conference Date Time Venue 10/11/2026 1:30 PM People’s Hall, 9th Floor, Legislative Building, Paranaque City Hall Created by MA. CARLA JEAN SAN JUAN Date Created 27/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Freshness: First saved / captured Oct 30, 2026, 2:26 AM; last database update Oct 30, 2026, 2:26 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.