Construction ProjectsInvitation to BidOpen · stored

Improvement of Evacuation Center

Buying agencyMUNICIPALITY OF SAN JUAN, SIQUIJOR

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱2,744,397.23
Time remaining26 days leftDeadline Nov 26, 2026, 9:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
Company screening is not checkedCheck status
Why this matters

Relevance does not establish whether your company meets the bid requirements.

Next action
Check my company

Use the supporting sections below to verify the evidence.

Reference 13320527

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

Item No. Description QTY Unit A. EXISTING BUILDING I. Scaffolding LS LS II. Removal and Disposal of Ceiling Framing and Ceiling 332.53 Sq.m III. Installation of Ceiling Framing and Ceiling 332.53 Sq.m IV. Removal and Installation of Tiles (Accommodation Room) 14.40 Sq.m V. PVC Doors and Door Jamb (with paint) 9.00 Set VI. Electrical Wirings and Lightings LS LS VII. Plumbing Accessories 22.00 Unit VIII. Reinforced Concrete (Raise-up of Existing Laundry) and Repair of Gutter 0.20 Cu.m IX. Shelves and Cabinet Doors (with paint) 26.34 Sq.m B. EXTENSION OF KITCHEN AREA I. Removal and Demolition of Existing Stairs and Floors Slab 25.80 Cu.m II. Backfilling and Compaction of Aggregate Sub Base Course 41.77 Cu.m III. Reinforced Concrete Flooring 5.54 Cu.m IV. Wall Footing 1.32 Cu.m V. CHB Walling with Plaster (both sides) 53.07 Sq.m VI. Reinforced Concrete Kitchen Sink and Laundry Area 0.33 Cu.m VII. Septic Tank (1 chamber) 60.42 Unit VIII. Tile Works (Floor, Laundry Area, Sink) 60.42 Sq.m IX. Ceiling Framing and Ceiling 55.61 Sq.m X. Painting (Inside and Outside) 108.06 Sq.m XI. Doors and Windows 3.00 Unit XII. Plumbing and Sanitary LS LS XIII. Electrical Works LS LS C. PARKING AREA I. Removal and Demolition of Existing Stairs 10.89 Cu.m II. Reinforced Concrete Flooring 18.15 Cu.m D. PLASTIC RAIN COLLECTOR W/ CONCRETE PEDESTAL I. Water Tank (1,500Liters) 1.00 LS II. Concrete Pedestal LS LS III. Support Bars LS LS E. SUPPLY AND INSTALALTION OF AIR CONDITION AND CEILING FAN LS LS SPCL ITEM 1 Construction Safety and Health LS LS SPCL Billboard (COA Requirements) LS LS Pre-bid Conference Date Time Venue 12/11/2026 9:00 AM Conference Hall, 2nd Floor New LGU San Juan Building Poblacion, San Juan Siquijor Created by Emeliza N. Tumala Date Created 30/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004,2004-2026 DBM Procurement Service. All rights reserved.,DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

Submission & process

Pre-Bid Conference

Known from stored extraction

Required in stored extraction

A specific pre-bid conference is identified in the procurement notice.

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Stored timeline

Important dates

Published · Manila

Oct 31, 2026, 12:00 AM

Deadline · Manila

Nov 26, 2026, 9:00 AM

26 days left
First saved / captured

Oct 31, 2026, 4:15 AM

Last database update

Oct 31, 2026, 4:15 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13320527
Original stored title
Invitation to bid for Improvement of Evacuation Center
Original buying agency
MUNICIPALITY OF SAN JUAN, SIQUIJOR
Stored status
active
View original stored description
Item No. Description QTY Unit A. EXISTING BUILDING I. Scaffolding LS LS II. Removal and Disposal of Ceiling Framing and Ceiling 332.53 Sq.m III. Installation of Ceiling Framing and Ceiling 332.53 Sq.m IV. Removal and Installation of Tiles (Accommodation Room) 14.40 Sq.m V. PVC Doors and Door Jamb (with paint) 9.00 Set VI. Electrical Wirings and Lightings LS LS VII. Plumbing Accessories 22.00 Unit VIII. Reinforced Concrete (Raise-up of Existing Laundry) and Repair of Gutter 0.20 Cu.m IX. Shelves and Cabinet Doors (with paint) 26.34 Sq.m B. EXTENSION OF KITCHEN AREA I. Removal and Demolition of Existing Stairs and Floors Slab 25.80 Cu.m II. Backfilling and Compaction of Aggregate Sub Base Course 41.77 Cu.m III. Reinforced Concrete Flooring 5.54 Cu.m IV. Wall Footing 1.32 Cu.m V. CHB Walling with Plaster (both sides) 53.07 Sq.m VI. Reinforced Concrete Kitchen Sink and Laundry Area 0.33 Cu.m VII. Septic Tank (1 chamber) 60.42 Unit VIII. Tile Works (Floor, Laundry Area, Sink) 60.42 Sq.m IX. Ceiling Framing and Ceiling 55.61 Sq.m X. Painting (Inside and Outside) 108.06 Sq.m XI. Doors and Windows 3.00 Unit XII. Plumbing and Sanitary LS LS XIII. Electrical Works LS LS C. PARKING AREA I. Removal and Demolition of Existing Stairs 10.89 Cu.m II. Reinforced Concrete Flooring 18.15 Cu.m D. PLASTIC RAIN COLLECTOR W/ CONCRETE PEDESTAL I. Water Tank (1,500Liters) 1.00 LS II. Concrete Pedestal LS LS III. Support Bars LS LS E. SUPPLY AND INSTALALTION OF AIR CONDITION AND CEILING FAN LS LS SPCL ITEM 1 Construction Safety and Health LS LS SPCL Billboard (COA Requirements) LS LS Pre-bid Conference Date Time Venue 12/11/2026 9:00 AM Conference Hall, 2nd Floor New LGU San Juan Building Poblacion, San Juan Siquijor Created by Emeliza N. Tumala Date Created 30/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004,2004-2026 DBM Procurement Service. All rights reserved.,DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Freshness: First saved / captured Oct 31, 2026, 4:15 AM; last database update Oct 31, 2026, 4:15 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.