Construction ProjectsOpen · stored

Construction of Multi-Purpose Building (Senior Citizen) at Brgy. Lalig

Buying agencyMUNICIPALITY OF TIAONG, QUEZON

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱3,399,387.78
Time remaining23 days leftDeadline Nov 23, 2026, 11:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
No active requirements are storedNeeds verification
Why this matters

The complete eligibility conditions must be checked in the official bidding documents.

Next action
Review official notice

Use the supporting sections below to verify the evidence.

Reference 13320356

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

B.5 Project Billboard/Signboard Quantity: 1.00 each Materials: Ordinary Plywood ( 1/2" x 4' x 8') 2.00 pcs. Coco Lumber (2" x 3" x 12') 5.00 pcs. Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kg. Labor: 1 Carpenter 0.50 day 2 Laborer 0.50 day B.7 Construction Safety and Health Quantity: 1.00 l.s. Materials Safety Helmet 15.00 pc(s) Hand Gloves 15.00 pair(s) Safety Shoes 15.00 pair(s) Misc (Medicine, Medicine Cabinet, Water, First Aid Kit) 1.00 lot 803(1)a Structure Excavation, Common Soil Quantity: 35.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 2.00 hour 2 Dump Truck (12 cu.yd) 2.00 hour 804(1)a Embankment from Structure Excavation Quantity: 35.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 5.00 hour 1 Plate Compactor 5.00 hour 804(2)a Embankment from Borrow Quantity: 18.00 cu.m Materials Common Borrow 23.00 cu.m Labor 1 Foreman 1.00 day 3 Laborer 1.00 day Equipment 1 Backhoe (0.80 cu.m) 4.00 hour 1 Plate Compactor 4.00 hour 804(7) Gravel Fill Quantity 10.06 cu.m Materials Gravel Fill 11.00 cu.m Labor 1 Foreman 2.00 days 3 Laborer 2.00 days Equipment 1 Plate Compactor 8.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)c Structural Concrete (3000 psi, Class A, 28 days) Quantity 9.00 cu.m Materials Ready Mix Concrete 3000Psi @ 28 Days 9.50 cu.m Labor 1 Foreman 1.00 days 2 Skilled Laborer 1.00 days 6 Laborer 1.00 days Equipment 2 Concrete Vibrator 8.00 hour 1 Pumpcrete 5.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)d Structural Concrete (4000 psi, Class A, 28 days) Quantity 14.00 cu.m Materials Ready Mix Concrete 4000Psi @ 28 Days 14.70 cu.m Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 6 Laborer 3.00 days Equipment 2 Concrete Vibrator 8.00 hour 1 Pumpcrete 4.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a1 Reinforcing Steel (Deformed) Grade 40 Quantity 1,183.85 kg Materials Reinforcing Steel Bars Deformed Grade 40 1,184.00 kg GI Tie Wire #16 18.00 kg Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 6 Laborer 3.00 days Equipment 1 Bar Cutter 5.00 hour 1 Bar Bender 5.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a2 Reinforcing Steel (Deformed) Grade 60 Quantity 971.22 kg Materials Reinforcing Steel Bars Deformed Grade 60 972.00 kg GI Tie Wire #16 14.58 kg Labor 1 Foreman 2.00 days 3 Skilled Laborer 2.00 days 6 Laborer 2.00 days Equipment 1 Bar Cutter 4.00 hour 1 Bar Bender 4.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 903(2) Formworks and Falseworks Quantity 125.29 sq.m Materials Phenolic Board - 1.22m x 2.44m x 18mm 11.00 pc Good Lumber 198.00 bd.ft Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 1 Laborer 4.00 days Stripping 2 Laborer 4.00 days Equipment 40 H-Frame 1.7 m x 1.2m, set 9.00 hrs 2pcs H-frames 4pcs diagonal cross braces 4pcs Horizontal cross braces 8pcs joint pins 62 Shoring Jack,3.8 m full extension 9.00 hrs 80 Adj. U-Head Jack, 0.60m 9.00 hrs 80 Adj. Base Jack, 0.60m 9.00 hrs 62 1-1/2" GI Pipe x 6.0 m 9.00 hrs 16 1-1/2" GI Pipe x 3.0 m 9.00 hrs 32 1-1/2" GI Pipe x 4.0 m 9.00 hrs 216 1-1/2" GI Pipe x 1.0 m 9.00 hrs 278 Tie Rod x 0.60m 9.00 hrs 558 Round Wing Not 9.00 hrs 1000(1) Soil Poisoning Quantity 2.00 liter Materials Soil Poisoning 2.00 lit Labor 1 Foreman 0.50 day 1 Laborer 0.50 day Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100mm Quantity 9.11 sq.m Materials CHB Ordinary (101mm x 203mm x 406mm) 119.00 pcs Portland Cement 5.00 bag Sand 1.00 cu.m Reinforcing Steel Bars Deformed Grade 40 30.00 kg GI Tie Wire #16 1.00 kg Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 One Bagger Mixer 3.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150mm Quantity 149.00 sq.m. Materials CHB Ordinary (150mm x 230mm x 406mm) 1,937.00 pcs Portland Cement 79.00 bag Sand 6.00 cu.m Reinforcing Steel Bars Deformed Grade 40 483.00 kg GI Tie Wire #16 8.00 kg Labor 1 Foreman 6.00 days 3 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 One Bagger Mixer 47.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1010(2) Doors Quantity 3.78 sq.m. Materials Panel Door with Door Jamb 3.78 sq.m Flush Hollow Core Door with Door Jamb 1.89 sq.m Door Locks (Schlage or Equivalent) 6.00 set Door Hinge (50mm x 101mm) 24.00 pc Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 2 Laborer 3.00 days 1008(1)c Aluminum Glass Window (Awning Type) Quantity 4.60 sq.m Materials Aluminum framed Glass Window (Awning Type) 4.60 sq.m Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1027(1) Cement Plaster Finish Quantity 325.9 sq.m Materials Portland Cement 108.00 bag Sand 9.00 cu.m Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Quantity 101.13 sq.m Materials 15mm thick Armstrong acoustic ceiling/Fiber cement board 37.00 pcs Metal Furring 3m length 115.00 pcs Carrying Channels 37.00 pcs Hanger Bars/Rod 102.00 pcs Channel clip 607.00 pcs Wall Angle 25.00 pcs Rivets 1,416.00 pcs 1" Metal Screw 405.00 pcs Labor 1 Foreman 10.00 days 1 Skilled Laborer 10.00 days 2 Laborer 10.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1038(1) Reflective Insulation Quantity 101.13 sq.m Materials Reflective Insulation, 10 mm thk 102.00 sq.m Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(1) Glazed Tiles Quantity 24.33 sq.m Materials Ceramic Glazed Tiles 26.00 sq.m Portland Cement 8.00 bags Sand 1.00 cu.m Tile Grout 3.00 bags Consumables (2% of Material Cost) 1.00 lot Labor 1 Foreman 2.00 days 2 Skilled Laborer 2.00 days 3 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(2) Unglazed Tiles Quantity 72 sq.m Materials Ceramic Unglazed Tiles 76.00 sq.m Portland Cement 24.00 bags Sand 2.00 cu.m Tile Grout 9.00 bags Consumables (2% of Material Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 3 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-I Finishing Works Quantity 1.00 l.s. Materials Decorative Red Brick 1.00 lot Acrylic Lettering 1.00 lot PWD Ramp Railing (Painted GI Pipe) 1.00 lot Modular Office Partition 17.00 sq.m Consumables 1.00 lot Labor 1 Foreman 6.00 days 3 Skilled Laborer 6.00 days 3 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)a Painting Works (Masonry/Concrete) Quantity 325.9 sq.m Materials Concrete Neutralizer 7.00 gal Concrete Sealer/Primer 14.00 gal Patching Compound 17.00 gal Semi-Gloss Latex (2 coats only) 27.00 gal Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 1 Laborer 8.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)c Painting Works (Steel) Quantity 199.83 sq.m Materials Red Oxide Primer 8.00 gal Flat Wall Enamel 20.00 gal Paint Thinner 50.00 liter Tinting Color 2.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 2 Skilled Laborer 9.00 days 1 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1014(1)b2 Prepainted Metal Sheets (above 0.427mm) Rib Type Long Span Quantity 120.68 sq.m. Materials Long Span Rib Type Colored Roof, Ga. 26 127.00 sq.m. Tekscrew 1,207.00 pcs Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 2 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(7) Structural Steel Quantity 1.00 l.s Materials Structural Steel Truss 1,484.64 kg Acetylene 17.00 kg Oxygen 33.00 kg Welding Rod 30.00 kg Consumables Materials (1% of Matl. Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Erection 1 Skilled Laborer 3.00 days 2 Laborer 3.00 days Equipment 1 Welding Machine, Electric Driven/DC Output, 500 Amp 20.00 hours 1 Cutting Outfit 14.00 hours 1 Grinding Machine and Accessories 20.00 hours 1 Cargo/Service Truck, 2-5 mt, 160 hp 4.00 hours 1 Boom Truck, NXG1160D3ZAL1X, 197 hp 5.00 hours 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(8)b Structural Steel (Purlins) Quantity 2,746.94 kg Materials Structural Steel Purlins 2,775.00 kg Welding Rod 55.00 kg Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 2 Welding Machine, Electric Driven/DC Output, 500 Amp 31.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(5) Metal Structure Accessories Quantity 437.29 kg Materials Steel Plates 376.32 kg Sagrod with nuts & Bolts 29.37 kg Cross Bracing 31.60 kg 16mm Ø turn buckles 8.00 pc Bolts and Rods 48.00 ea Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 1 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)b Fabricated Metal Roofing Accessory (Flashing, Ga. 26) Quantity 29.25 l.m Materials Pre-painted flashing, Ga.24 (0.701mm) x 2.44mm 31.00 m Blind Rivets 556.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)c Fabricated Metal Roofing Accessory (Gutter, Ga. 24) Quantity 29.25 l.m Materials Pre-painted Gutter, Ga. 24 (0.701 mm) X 2.44 m 30.00 m 12" x 1" Plain GI Strap 88.00 pc Blind Rivets 468.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(8) Sewer Line Works Quantity 1.00 l.s. Materials 100 mm uPVC Pipe (3m) 6.00 pcs 50 mm PVC Pipe (3m) 4.00 pcs 50 mm Coupling 4.00 pcs 50 mm 45 deg Elbow 4.00 pcs 50 mm 90 deg Elbow 4.00 pcs 50 mm Sanitary Tee 3.00 pcs 100 mm Double Branch Tee 1.00 pcs 50 mm P-Trap w/ Plug 2.00 pcs 50 mm Cleanout w/ Plug 2.00 pcs PVC Solvent Cement 2.00 cans Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(24) Cold Water lines Quantity 1.00 l.s. Materials 32mm PPR Pipe (4m) 4.00 pcs 50mm PPR Pipe (4m) 3.00 pcs 32 mm Coupling 5.00 pcs 32 mm Elbow 6.00 pcs 20mm/25mm Elbow 4.00 pcs 32 mm Tee 4.00 pcs Reducer 50 mm x 32 mm 2.00 pcs Reserved Tank 1000L 1.00 unit Teflon Tape 2.00 pcs Hose Bibb 1.00 pcs Gate Valve 1.00 pcs Check Valve 1.00 pcs Water meter 1.00 set Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(9) Storm Drainage and Downspout Quantity 1.00 l.s. Materials 100 mm PVC DS Pipe (3m) 4.00 pcs 100 mm PVC Elbow 4.00 pcs 100 mm PVC Coupling 3.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(4) Plumbing Fixtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc. (round) american std or equiv. 1.00 pcs Lavatory inc. fittings & acc. American std or equivalent 1.00 pcs Floor Drain 2.00 pcs Urinal 1.00 pcs Stainless Sink-Double 1.00 pcs Stainless Wall Faucet 2.00 pcs Consumables (3% of Material Cost) 1.00 lot Labor 1 Foreman 3.50 days 1 Skilled Laborer 3.50 days 2 Laborer 3.50 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(11) Septic Vault/ Tank (Concrete / CHB) Quantity 1.00 l.s. Materials Portland Cement 68.00 bags Sand 5.00 cu.m. Gravel 6.00 sq.m. Reinforcing Steel Bar 916.00 kgs G.I. Wire 26.00 kgs Lumber, Good - 4 uses 164.00 bd-ft Marine Plywood (1/2"x4"x8') 13.00 pc Assorted CWN (1kg/100bd.ft) 4.00 kgs Water Proofing Cement (Sahara or Equivalent) 13.00 bags Brass Clean-out 4.00 pc Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 4 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(6) Catch Basin (CHB) Quantity 1.00 l.s Materials Portland Cement 8.00 bags Sand 1.00 cu.m Gravel 3/4 1.00 cu.m RSB Grade 40, 10 mm 45.00 kgs #16 Galvanized Iron Wire 1.00 kgs Metal Grating 19.00 kgs CHB, Non Load Bearing, 4" 52.00 pcs Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) Quantity 1.00 l.s. Materials 20 mmØ uPVC conduit 65.00 l.m 20 mmØ PVC Adapter 25.00 l.m Utility box, deep type 15.00 pc Junction box, deep type 25.00 pc Consumables 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1101(33) Wires and Wiring Devices Quantity 1.00 l.s. Materials Electric Wires THWN/THNN 2.0 mm2 130.00 l.m. Electric Wires THWN/THNN 3.5 mm2 80.00 l.m. Electric Wires THWN/THNN 5.5 mm2 46.00 l.m. One-gang Switch 2.00 set Two-Gang Switch 1.00 set Three-Gang Switch 2.00 set Duplex Convenience Outlet 8.00 set Heavy Duty Outlet 1.00 set Tape, bolt&nut, mica tube, terminal lugs,etc. 1.00 lot JB cover clamps, screw and anchors Split Type Aircon 2 HP 1.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 6.00 days 1 Skilled Laborer 6.00 days 3 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(1) Panelboard with Main & Branch Breakers Quantity 1.00 l.s. Materials Enclosed Air Circuit Breaker 1.00 lot 30AT Circuit Breaker 1.00 pc 30AT Circuit Breaker with cover 1.00 pc Panelboard & Cabinets 1.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1103(1) Lighting Fixtures Quantity 1.00 l.s. Materials 12 watts Ceiling-mounted LED Box-type light 24.00 set 2-20W Emergency Light 2.00 set Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(18) Solar Panel with Inverter, Battery and Other Devices Quantity 1.00 l.s. Materials Hydbrid Inverter Livoltek 1PH/220V 5kWp (Hyper 5000) 1.00 pcs GCL Solar Panel 620W NT12R/66GDF 8.00 pcs MA Rail L2400 16.00 pcs MA Mid Clamp 35mm 32.00 pcs MA End Clamp 35mm 48.00 pcs MA Ground Lug 35mm 8.00 pcs MA Rail Splice 16.00 pcs Suntree PV Wire Single Core 4mm 100.00 meters AC Wire THHN 5.5 mm2 100.00 meters AC Wire THHN 3.5 mm2 50.00 meters Suntree PV Connector MC4-6mm 10.00 pcs SL7N-63 2P 5A 800VDC 2.00 pcs SUP2H8-PV 2P 800VDC 20-40kA 2.00 pcs AC SPD (SUP0-T1+T2) AC240V 4P 65kA 1.00 pcs SCB8-63 2P 32A 400VAC 1.00 pcs Flexible HDPE 3/4 20mm 100.00 pcs Suntree Distribution Box 12WAY (PMH12PN) 2.00 pcs Plastic Cable Tray Slotted 80x80 mm 3.00 pcs Metal Ground Rod 3M 1.00 pcs Consumables 1.00 lot Labor 1 Foreman 7.00 days 6 Skilled Laborer 7.00 days 7 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

No active requirements are stored.

Review the official notice and bidding documents for the complete requirements.

Stored timeline

Important dates

Published · Manila

Oct 31, 2026, 12:00 AM

Deadline · Manila

Nov 23, 2026, 11:00 AM

23 days left
First saved / captured

Oct 31, 2026, 4:20 AM

Last database update

Oct 31, 2026, 4:20 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13320356
Original stored title
Construction of Multi-Purpose Building (Senior Citizen) at Brgy. Lalig
Original buying agency
MUNICIPALITY OF TIAONG, QUEZON
Stored status
active
View original stored description
B.5 Project Billboard/Signboard Quantity: 1.00 each Materials: Ordinary Plywood ( 1/2" x 4' x 8') 2.00 pcs. Coco Lumber (2" x 3" x 12') 5.00 pcs. Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kg. Labor: 1 Carpenter 0.50 day 2 Laborer 0.50 day B.7 Construction Safety and Health Quantity: 1.00 l.s. Materials Safety Helmet 15.00 pc(s) Hand Gloves 15.00 pair(s) Safety Shoes 15.00 pair(s) Misc (Medicine, Medicine Cabinet, Water, First Aid Kit) 1.00 lot 803(1)a Structure Excavation, Common Soil Quantity: 35.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 2.00 hour 2 Dump Truck (12 cu.yd) 2.00 hour 804(1)a Embankment from Structure Excavation Quantity: 35.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 5.00 hour 1 Plate Compactor 5.00 hour 804(2)a Embankment from Borrow Quantity: 18.00 cu.m Materials Common Borrow 23.00 cu.m Labor 1 Foreman 1.00 day 3 Laborer 1.00 day Equipment 1 Backhoe (0.80 cu.m) 4.00 hour 1 Plate Compactor 4.00 hour 804(7) Gravel Fill Quantity 10.06 cu.m Materials Gravel Fill 11.00 cu.m Labor 1 Foreman 2.00 days 3 Laborer 2.00 days Equipment 1 Plate Compactor 8.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)c Structural Concrete (3000 psi, Class A, 28 days) Quantity 9.00 cu.m Materials Ready Mix Concrete 3000Psi @ 28 Days 9.50 cu.m Labor 1 Foreman 1.00 days 2 Skilled Laborer 1.00 days 6 Laborer 1.00 days Equipment 2 Concrete Vibrator 8.00 hour 1 Pumpcrete 5.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)d Structural Concrete (4000 psi, Class A, 28 days) Quantity 14.00 cu.m Materials Ready Mix Concrete 4000Psi @ 28 Days 14.70 cu.m Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 6 Laborer 3.00 days Equipment 2 Concrete Vibrator 8.00 hour 1 Pumpcrete 4.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a1 Reinforcing Steel (Deformed) Grade 40 Quantity 1,183.85 kg Materials Reinforcing Steel Bars Deformed Grade 40 1,184.00 kg GI Tie Wire #16 18.00 kg Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 6 Laborer 3.00 days Equipment 1 Bar Cutter 5.00 hour 1 Bar Bender 5.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a2 Reinforcing Steel (Deformed) Grade 60 Quantity 971.22 kg Materials Reinforcing Steel Bars Deformed Grade 60 972.00 kg GI Tie Wire #16 14.58 kg Labor 1 Foreman 2.00 days 3 Skilled Laborer 2.00 days 6 Laborer 2.00 days Equipment 1 Bar Cutter 4.00 hour 1 Bar Bender 4.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 903(2) Formworks and Falseworks Quantity 125.29 sq.m Materials Phenolic Board - 1.22m x 2.44m x 18mm 11.00 pc Good Lumber 198.00 bd.ft Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 1 Laborer 4.00 days Stripping 2 Laborer 4.00 days Equipment 40 H-Frame 1.7 m x 1.2m, set 9.00 hrs 2pcs H-frames 4pcs diagonal cross braces 4pcs Horizontal cross braces 8pcs joint pins 62 Shoring Jack,3.8 m full extension 9.00 hrs 80 Adj. U-Head Jack, 0.60m 9.00 hrs 80 Adj. Base Jack, 0.60m 9.00 hrs 62 1-1/2" GI Pipe x 6.0 m 9.00 hrs 16 1-1/2" GI Pipe x 3.0 m 9.00 hrs 32 1-1/2" GI Pipe x 4.0 m 9.00 hrs 216 1-1/2" GI Pipe x 1.0 m 9.00 hrs 278 Tie Rod x 0.60m 9.00 hrs 558 Round Wing Not 9.00 hrs 1000(1) Soil Poisoning Quantity 2.00 liter Materials Soil Poisoning 2.00 lit Labor 1 Foreman 0.50 day 1 Laborer 0.50 day Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100mm Quantity 9.11 sq.m Materials CHB Ordinary (101mm x 203mm x 406mm) 119.00 pcs Portland Cement 5.00 bag Sand 1.00 cu.m Reinforcing Steel Bars Deformed Grade 40 30.00 kg GI Tie Wire #16 1.00 kg Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 One Bagger Mixer 3.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150mm Quantity 149.00 sq.m. Materials CHB Ordinary (150mm x 230mm x 406mm) 1,937.00 pcs Portland Cement 79.00 bag Sand 6.00 cu.m Reinforcing Steel Bars Deformed Grade 40 483.00 kg GI Tie Wire #16 8.00 kg Labor 1 Foreman 6.00 days 3 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 One Bagger Mixer 47.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1010(2) Doors Quantity 3.78 sq.m. Materials Panel Door with Door Jamb 3.78 sq.m Flush Hollow Core Door with Door Jamb 1.89 sq.m Door Locks (Schlage or Equivalent) 6.00 set Door Hinge (50mm x 101mm) 24.00 pc Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 2 Laborer 3.00 days 1008(1)c Aluminum Glass Window (Awning Type) Quantity 4.60 sq.m Materials Aluminum framed Glass Window (Awning Type) 4.60 sq.m Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1027(1) Cement Plaster Finish Quantity 325.9 sq.m Materials Portland Cement 108.00 bag Sand 9.00 cu.m Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Quantity 101.13 sq.m Materials 15mm thick Armstrong acoustic ceiling/Fiber cement board 37.00 pcs Metal Furring 3m length 115.00 pcs Carrying Channels 37.00 pcs Hanger Bars/Rod 102.00 pcs Channel clip 607.00 pcs Wall Angle 25.00 pcs Rivets 1,416.00 pcs 1" Metal Screw 405.00 pcs Labor 1 Foreman 10.00 days 1 Skilled Laborer 10.00 days 2 Laborer 10.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1038(1) Reflective Insulation Quantity 101.13 sq.m Materials Reflective Insulation, 10 mm thk 102.00 sq.m Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(1) Glazed Tiles Quantity 24.33 sq.m Materials Ceramic Glazed Tiles 26.00 sq.m Portland Cement 8.00 bags Sand 1.00 cu.m Tile Grout 3.00 bags Consumables (2% of Material Cost) 1.00 lot Labor 1 Foreman 2.00 days 2 Skilled Laborer 2.00 days 3 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(2) Unglazed Tiles Quantity 72 sq.m Materials Ceramic Unglazed Tiles 76.00 sq.m Portland Cement 24.00 bags Sand 2.00 cu.m Tile Grout 9.00 bags Consumables (2% of Material Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 3 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-I Finishing Works Quantity 1.00 l.s. Materials Decorative Red Brick 1.00 lot Acrylic Lettering 1.00 lot PWD Ramp Railing (Painted GI Pipe) 1.00 lot Modular Office Partition 17.00 sq.m Consumables 1.00 lot Labor 1 Foreman 6.00 days 3 Skilled Laborer 6.00 days 3 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)a Painting Works (Masonry/Concrete) Quantity 325.9 sq.m Materials Concrete Neutralizer 7.00 gal Concrete Sealer/Primer 14.00 gal Patching Compound 17.00 gal Semi-Gloss Latex (2 coats only) 27.00 gal Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 1 Laborer 8.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)c Painting Works (Steel) Quantity 199.83 sq.m Materials Red Oxide Primer 8.00 gal Flat Wall Enamel 20.00 gal Paint Thinner 50.00 liter Tinting Color 2.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 2 Skilled Laborer 9.00 days 1 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1014(1)b2 Prepainted Metal Sheets (above 0.427mm) Rib Type Long Span Quantity 120.68 sq.m. Materials Long Span Rib Type Colored Roof, Ga. 26 127.00 sq.m. Tekscrew 1,207.00 pcs Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 2 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(7) Structural Steel Quantity 1.00 l.s Materials Structural Steel Truss 1,484.64 kg Acetylene 17.00 kg Oxygen 33.00 kg Welding Rod 30.00 kg Consumables Materials (1% of Matl. Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Erection 1 Skilled Laborer 3.00 days 2 Laborer 3.00 days Equipment 1 Welding Machine, Electric Driven/DC Output, 500 Amp 20.00 hours 1 Cutting Outfit 14.00 hours 1 Grinding Machine and Accessories 20.00 hours 1 Cargo/Service Truck, 2-5 mt, 160 hp 4.00 hours 1 Boom Truck, NXG1160D3ZAL1X, 197 hp 5.00 hours 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(8)b Structural Steel (Purlins) Quantity 2,746.94 kg Materials Structural Steel Purlins 2,775.00 kg Welding Rod 55.00 kg Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 2 Welding Machine, Electric Driven/DC Output, 500 Amp 31.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(5) Metal Structure Accessories Quantity 437.29 kg Materials Steel Plates 376.32 kg Sagrod with nuts & Bolts 29.37 kg Cross Bracing 31.60 kg 16mm Ø turn buckles 8.00 pc Bolts and Rods 48.00 ea Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 1 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)b Fabricated Metal Roofing Accessory (Flashing, Ga. 26) Quantity 29.25 l.m Materials Pre-painted flashing, Ga.24 (0.701mm) x 2.44mm 31.00 m Blind Rivets 556.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)c Fabricated Metal Roofing Accessory (Gutter, Ga. 24) Quantity 29.25 l.m Materials Pre-painted Gutter, Ga. 24 (0.701 mm) X 2.44 m 30.00 m 12" x 1" Plain GI Strap 88.00 pc Blind Rivets 468.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(8) Sewer Line Works Quantity 1.00 l.s. Materials 100 mm uPVC Pipe (3m) 6.00 pcs 50 mm PVC Pipe (3m) 4.00 pcs 50 mm Coupling 4.00 pcs 50 mm 45 deg Elbow 4.00 pcs 50 mm 90 deg Elbow 4.00 pcs 50 mm Sanitary Tee 3.00 pcs 100 mm Double Branch Tee 1.00 pcs 50 mm P-Trap w/ Plug 2.00 pcs 50 mm Cleanout w/ Plug 2.00 pcs PVC Solvent Cement 2.00 cans Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(24) Cold Water lines Quantity 1.00 l.s. Materials 32mm PPR Pipe (4m) 4.00 pcs 50mm PPR Pipe (4m) 3.00 pcs 32 mm Coupling 5.00 pcs 32 mm Elbow 6.00 pcs 20mm/25mm Elbow 4.00 pcs 32 mm Tee 4.00 pcs Reducer 50 mm x 32 mm 2.00 pcs Reserved Tank 1000L 1.00 unit Teflon Tape 2.00 pcs Hose Bibb 1.00 pcs Gate Valve 1.00 pcs Check Valve 1.00 pcs Water meter 1.00 set Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(9) Storm Drainage and Downspout Quantity 1.00 l.s. Materials 100 mm PVC DS Pipe (3m) 4.00 pcs 100 mm PVC Elbow 4.00 pcs 100 mm PVC Coupling 3.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(4) Plumbing Fixtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc. (round) american std or equiv. 1.00 pcs Lavatory inc. fittings & acc. American std or equivalent 1.00 pcs Floor Drain 2.00 pcs Urinal 1.00 pcs Stainless Sink-Double 1.00 pcs Stainless Wall Faucet 2.00 pcs Consumables (3% of Material Cost) 1.00 lot Labor 1 Foreman 3.50 days 1 Skilled Laborer 3.50 days 2 Laborer 3.50 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(11) Septic Vault/ Tank (Concrete / CHB) Quantity 1.00 l.s. Materials Portland Cement 68.00 bags Sand 5.00 cu.m. Gravel 6.00 sq.m. Reinforcing Steel Bar 916.00 kgs G.I. Wire 26.00 kgs Lumber, Good - 4 uses 164.00 bd-ft Marine Plywood (1/2"x4"x8') 13.00 pc Assorted CWN (1kg/100bd.ft) 4.00 kgs Water Proofing Cement (Sahara or Equivalent) 13.00 bags Brass Clean-out 4.00 pc Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 4 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(6) Catch Basin (CHB) Quantity 1.00 l.s Materials Portland Cement 8.00 bags Sand 1.00 cu.m Gravel 3/4 1.00 cu.m RSB Grade 40, 10 mm 45.00 kgs #16 Galvanized Iron Wire 1.00 kgs Metal Grating 19.00 kgs CHB, Non Load Bearing, 4" 52.00 pcs Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) Quantity 1.00 l.s. Materials 20 mmØ uPVC conduit 65.00 l.m 20 mmØ PVC Adapter 25.00 l.m Utility box, deep type 15.00 pc Junction box, deep type 25.00 pc Consumables 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1101(33) Wires and Wiring Devices Quantity 1.00 l.s. Materials Electric Wires THWN/THNN 2.0 mm2 130.00 l.m. Electric Wires THWN/THNN 3.5 mm2 80.00 l.m. Electric Wires THWN/THNN 5.5 mm2 46.00 l.m. One-gang Switch 2.00 set Two-Gang Switch 1.00 set Three-Gang Switch 2.00 set Duplex Convenience Outlet 8.00 set Heavy Duty Outlet 1.00 set Tape, bolt&nut, mica tube, terminal lugs,etc. 1.00 lot JB cover clamps, screw and anchors Split Type Aircon 2 HP 1.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 6.00 days 1 Skilled Laborer 6.00 days 3 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(1) Panelboard with Main & Branch Breakers Quantity 1.00 l.s. Materials Enclosed Air Circuit Breaker 1.00 lot 30AT Circuit Breaker 1.00 pc 30AT Circuit Breaker with cover 1.00 pc Panelboard & Cabinets 1.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1103(1) Lighting Fixtures Quantity 1.00 l.s. Materials 12 watts Ceiling-mounted LED Box-type light 24.00 set 2-20W Emergency Light 2.00 set Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(18) Solar Panel with Inverter, Battery and Other Devices Quantity 1.00 l.s. Materials Hydbrid Inverter Livoltek 1PH/220V 5kWp (Hyper 5000) 1.00 pcs GCL Solar Panel 620W NT12R/66GDF 8.00 pcs MA Rail L2400 16.00 pcs MA Mid Clamp 35mm 32.00 pcs MA End Clamp 35mm 48.00 pcs MA Ground Lug 35mm 8.00 pcs MA Rail Splice 16.00 pcs Suntree PV Wire Single Core 4mm 100.00 meters AC Wire THHN 5.5 mm2 100.00 meters AC Wire THHN 3.5 mm2 50.00 meters Suntree PV Connector MC4-6mm 10.00 pcs SL7N-63 2P 5A 800VDC 2.00 pcs SUP2H8-PV 2P 800VDC 20-40kA 2.00 pcs AC SPD (SUP0-T1+T2) AC240V 4P 65kA 1.00 pcs SCB8-63 2P 32A 400VAC 1.00 pcs Flexible HDPE 3/4 20mm 100.00 pcs Suntree Distribution Box 12WAY (PMH12PN) 2.00 pcs Plastic Cable Tray Slotted 80x80 mm 3.00 pcs Metal Ground Rod 3M 1.00 pcs Consumables 1.00 lot Labor 1 Foreman 7.00 days 6 Skilled Laborer 7.00 days 7 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot

Freshness: First saved / captured Oct 31, 2026, 4:20 AM; last database update Oct 31, 2026, 4:20 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.