Construction ProjectsOpen · stored

Installation of Gabion at Sitio Proper, Barangay Loctuga

Buying agencyMUNICIPALITY OF LIBACAO, AKLAN

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱999,705.21
Time remaining3 days leftDeadline Nov 3, 2026, 10:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
Filipino Ownership RequirementNeeds verification
Why this matters

This condition includes alternatives, combined thresholds, or detailed license terms that require checking in the official documents.

Next action
Verify ownership conditions

Use the supporting sections below to verify the evidence.

Reference 13274267

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Useful evidence for this bid

  • PCAB License

Requires document review

  • NFCC: NFCC and Line of Credit alternatives are not automatically evaluated from the browser-local profile.
  • Filipino Ownership Requirement: The ownership threshold is not supported by the current automatic comparator.
Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

Republic of the Philippines Province of Aklan MUNICIPALITY OF LIBACAO

  • * *

The Local Government Unit of Libacao, through its Bids and Awards Committee (BAC), invites contractors to submit bids for the following Contract: Contract I.D.: 2026LGU056 Contract Name: Installation of Gabion at Sitio Proper, Barangay Loctuga Contract Location: Loctuga, Libacao, Aklan Brief Description: Installation of a three-layer gabion mesh system, each unit measuring 1m x 2m x 1m, and a 2m x 6m x 0.30m gabion mattress, with a wire thickness of 2.7mm and an 8cm x 10cm mesh opening. The mesh is double-twisted and zinc-coated (galvanized), covering a total width of 4 meters and an overall length of 30 meters. Approved Budget for the Contract (ABC): PHP 999,705.21 Source of Funds: LDRRMF Special Trust Fund Contract Duration: 90 Calendar days The BAC is conducting the Public Bidding for this Contract in accordance with RA 9184 and its Implementing Rules and Regulations (IRR). To be eligible to bid for this Contract, a Contractor must meet the following major requirements: (a) Filipino citizen or 75% Filipino-owned partnership/corporation with PCAB license for Size Range _____, (b) completion of a similar contract costing at least 50% of the ABC, and (c) Net Financial Contracting Capacity (NFCC) at least equal to the ABC. The Local Government Unit will use non-discretionary “pass/fail” criteria in the eligibility check, preliminary examination of bids, evaluation of bids, post qualification and award. The Schedule of key procurement activities for this Contract is shown below: Activity Time Place 1.Issuance of Bidding Documents October 7, 2026 – November 3, 2026 *Hard Copies at 2nd Floor, Office of the Municipal Mayor, Municipal Hall, Libacao, Aklan 2.Pre-bid Conference October 20, 2026 10:00 am 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan 3.Receipt by the BAC of Bids November 3, 2026 10:00 am 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan 4.Opening of Bids November 3, 2026 10:00 am 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan Bidders shall pay the BAC a non-refundable fee of Php 1000.00 for the Bidding Documents, upon securing hard copies of the Documents. Bidders that downloaded the Documents from the PhilGEPS website shall pay the fee upon submission of their bids. Bidder shall show proof of evidence that they are the authorized representative to submit/drop bid of the Contractor they represent. The Local Government Unit of Libacao reserves the right to accept or reject any bid and to annul the bidding process any time before the Contract Award, without incurring any liability to the affected bidders, in accordance with the Provisions of Section 41 of RA 9184 and its IRR. Any requests for additional information concerning this bidding shall be directed to the following: BAC Chairman: MAXIMO N. SARCENO Address: Office of the Municipal Environmental and Natural Resources Officer LGU, Libacao, Aklan Telephone No.(036) 273-2351 BAC Secretariat: ALYSSA MARIE T. NAVARRETE EDZEN T. CAHILIG AURORA O. NALANGAN MELVIN S. ZABALA Address: LGU, Libacao, Aklan Telephone No. (036) 273-2223 Email Address: [email protected] Approved by: SGD. MAXIMO N. SARCENO BAC Chairman Date of Publication: October 7, 2026 Pre-bid Conference Date Time Venue 20/10/2026 10:00 AM 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan Created by Alyssa Marie Navarrete Date Created 06/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

Ownership

Filipino Ownership Requirement

Needs verification

Required in stored extraction

Bidder must satisfy the stated Filipino ownership or reciprocity requirement.

Reciprocity exception mentioned
No
Minimum Filipino ownership (%)
75

This condition includes alternatives, combined thresholds, or detailed license terms that require checking in the official documents.

Construction licensing

PCAB License

Known from stored extraction

Required in stored extraction

Bidder must satisfy the stated PCAB licensing requirement.

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Financial capacity

NFCC

Known from stored extraction

Required in stored extraction

Bidder must satisfy the stated Net Financial Contracting Capacity requirement.

Extracted threshold: ₱999,705.21

Amount basis
ABC

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Submission & process

Pre-Bid Conference

Known from stored extraction

Required in stored extraction

A specific pre-bid conference is identified in the procurement notice.

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Stored timeline

Important dates

Published · Manila

Oct 7, 2026, 12:00 AM

Deadline · Manila

Nov 3, 2026, 10:00 AM

3 days left
First saved / captured

Oct 7, 2026, 1:24 AM

Last database update

Oct 7, 2026, 1:24 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13274267
Original stored title
Installation of Gabion at Sitio Proper, Barangay Loctuga
Original buying agency
MUNICIPALITY OF LIBACAO, AKLAN
Stored status
active
View original stored description
Republic of the Philippines Province of Aklan MUNICIPALITY OF LIBACAO * * * The Local Government Unit of Libacao, through its Bids and Awards Committee (BAC), invites contractors to submit bids for the following Contract: Contract I.D.: 2026LGU056 Contract Name: Installation of Gabion at Sitio Proper, Barangay Loctuga Contract Location: Loctuga, Libacao, Aklan Brief Description: Installation of a three-layer gabion mesh system, each unit measuring 1m x 2m x 1m, and a 2m x 6m x 0.30m gabion mattress, with a wire thickness of 2.7mm and an 8cm x 10cm mesh opening. The mesh is double-twisted and zinc-coated (galvanized), covering a total width of 4 meters and an overall length of 30 meters. Approved Budget for the Contract (ABC): PHP 999,705.21 Source of Funds: LDRRMF Special Trust Fund Contract Duration: 90 Calendar days The BAC is conducting the Public Bidding for this Contract in accordance with RA 9184 and its Implementing Rules and Regulations (IRR). To be eligible to bid for this Contract, a Contractor must meet the following major requirements: (a) Filipino citizen or 75% Filipino-owned partnership/corporation with PCAB license for Size Range _____, (b) completion of a similar contract costing at least 50% of the ABC, and (c) Net Financial Contracting Capacity (NFCC) at least equal to the ABC. The Local Government Unit will use non-discretionary “pass/fail” criteria in the eligibility check, preliminary examination of bids, evaluation of bids, post qualification and award. The Schedule of key procurement activities for this Contract is shown below: Activity Time Place 1.Issuance of Bidding Documents October 7, 2026 – November 3, 2026 *Hard Copies at 2nd Floor, Office of the Municipal Mayor, Municipal Hall, Libacao, Aklan 2.Pre-bid Conference October 20, 2026 10:00 am 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan 3.Receipt by the BAC of Bids November 3, 2026 10:00 am 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan 4.Opening of Bids November 3, 2026 10:00 am 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan Bidders shall pay the BAC a non-refundable fee of Php 1000.00 for the Bidding Documents, upon securing hard copies of the Documents. Bidders that downloaded the Documents from the PhilGEPS website shall pay the fee upon submission of their bids. Bidder shall show proof of evidence that they are the authorized representative to submit/drop bid of the Contractor they represent. The Local Government Unit of Libacao reserves the right to accept or reject any bid and to annul the bidding process any time before the Contract Award, without incurring any liability to the affected bidders, in accordance with the Provisions of Section 41 of RA 9184 and its IRR. Any requests for additional information concerning this bidding shall be directed to the following: BAC Chairman: MAXIMO N. SARCENO Address: Office of the Municipal Environmental and Natural Resources Officer LGU, Libacao, Aklan Telephone No.(036) 273-2351 BAC Secretariat: ALYSSA MARIE T. NAVARRETE EDZEN T. CAHILIG AURORA O. NALANGAN MELVIN S. ZABALA Address: LGU, Libacao, Aklan Telephone No. (036) 273-2223 Email Address: [email protected] Approved by: SGD. MAXIMO N. SARCENO BAC Chairman Date of Publication: October 7, 2026 Pre-bid Conference Date Time Venue 20/10/2026 10:00 AM 2nd Floor, Conference Hall, Municipal Hall, Libacao, Aklan Created by Alyssa Marie Navarrete Date Created 06/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Freshness: First saved / captured Oct 7, 2026, 1:24 AM; last database update Oct 7, 2026, 1:24 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.