REQUEST FOR EXPRESSION OF INTEREST FOR FEASIBILITY STUDY AND DETAILED ENGINEERING DESIGN FOR RETROFITTING OF PANTABANGAN DAM PORTAL STILLING BASIN
The NIA-UPRIIS-DRD, through the Internally Generated Fund (IGF-FRLC) MOOE FY-2026 intends to apply the sum of Php 6,500,000.00 being the Approved Budget for the Contract (ABC) to payments under the contract for FEASIBILITY STUDY AND DETAILED ENGINEERING DESIGN FOR RETROFITTING OF PANTABANGAN DAM PORTAL STILLING BASIN, Contract ID No.: 2026-DRD-CO-CS-02. Bids received in excess of the ABC shall be automatically rejected at the opening of the financial proposals.
The National Irrigation Administration-Upper Pampanga River Integrated Irrigation System Dam and Reservoir Division now calls for the submission of short-listing documents for Feasibility Study and Detailed Engineering using the Highest Rated Responsive Bid (HRRB). Short-listing documents of interested consultants must be duly received by the Bids and Awards Committee (BAC) Secretariat on or before October 15, 2026 at National Irrigation Administration-Upper Pampanga River Integrated Irrigation Systems (NIA-UPRIIS), Dam and Reservoir Division, Fatima, Pantabangan, Nueva Ecija. Applications for eligibility will be evaluated based on a non-discretionary “pass/fail” criterion.
Interested bidders may obtain further information from National Irrigation Administration-Upper Pampanga River Integrated Irrigation System Dam and Reservoir Division and inspect the Bidding Documents at the address given below from 8:00 AM to 5:00 PM (Monday to Thursday).
A complete set of Bidding Documents may be acquired by interested Bidders on October 15, 2026 - November 4, 2026, from the given address below at Brgy. Fatima, Pantabangan, Nueva Ecija and upon payment of the applicable fee for the Bidding Documents, pursuant to the latest Guidelines issued by the GPPB, in the amount of Php 10,000.00.
It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the Procuring Entity, provided that Bidders shall pay the applicable fee for the Bidding Documents not later than the submission of their bids.
The BAC shall draw up the short-list of consultants from those who have submitted Expression of Interest, including the short-listing documents, and have been determined as eligible in accordance with the provisions of Republic Act (RA) No. 12009, otherwise known as the “New Government Procurement Act”, and its Implementing Rules and Regulations (IRR). The short-list shall consist of three (3) to seven(7) prospective bidders; in case of one (1) or less than the required number apply for eligibility and short-listing, pass the eligibility check, and/or the minimum score required in the short-listing, the BAC shall consider the same who will be entitled to submit bids manually. The criteria and rating system for short-listing are:
Shortlisting Criteria - Percent Rating (%) A. Applicable experience of the consultant and members in case of joint ventures, considering both the overall experiences of 108 the firm or, in the case of new firms, the individual experiences of the principal and key staff, including the times when employed by other consultants - 30% B. Qualification of personnel who may be assigned to the job in relation to the extent and complexity of the undertaking - 40% C. Current workload relative to capacity (Financial Capability) - 30% Total (%) - 100 The minimum % required to be shortlist is seventy percent (70%)
Bidding will be conducted through competitive selection using non-discretionary “pass/fail” criterion as specified in the Implementing Rules and Regulations (IRR) of RA No. 12009.
Bidding is restricted to Filipino citizens/sole proprietorships, cooperatives, and partnerships or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines.
The Procuring Entity shall evaluate bids to determine the Highest Rated Bid using the Quality-Cost Based Evaluation/Selection (QCBE/QCBS) procedure. The financial and technical proposals shall be assigned with corresponding weights, with the financial proposal allotted a weight of twenty percent (20%) and technical proposal shall be eighty percent (80%). The criteria and rating system for the evaluation of bids shall be provided in the Instructions to Bidders.
Short-Listing Documents must be received by the Procuring Entity’s BAC at the NIA-UPRIIS Dam and Reservoir Division, Brgy. Fatima, Pantabangan, Nueva Ecija on or before October 15, 2026 at 2:00 PM.
The contract shall be completed within 150 calendar days starting from the receipt of the Notice to Proceed, until the issuance of Certificate of Completion for the consulting services.
All Bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 16.
The certification as to the current workload relative to capacity shall be made in accordance with the Instructions to Bidders in relation to TPF 5 therein.
The National Irrigation Administration-Upper Pampanga River Integrated Irrigation System Dam and Reservoir Division reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 70 of RA No. 12009 and its IRR, without thereby incurring any liability to the affected bidder or bidders.
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
Extracted from the stored notice
Key requirements
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Ownership
Filipino Ownership Requirement
Needs verification
Required in stored extraction
Bidder must satisfy the stated Filipino ownership or reciprocity requirement.
Reciprocity exception mentioned
No
Minimum Filipino ownership (%)
60
This condition includes alternatives, combined thresholds, or detailed license terms that require checking in the official documents.
Submission & process
Bid Security
Known from stored extraction
Required in stored extraction
Bid Security is required in an acceptable form and amount.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Pre-Bid Conference
Known from stored extraction
Required in stored extraction
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Stored timeline
Important dates
Published · Manila
Oct 8, 2026, 12:00 AM
Deadline · Manila
Nov 4, 2026, 8:30 AM
4 days left
First saved / captured
Oct 8, 2026, 2:48 AM
Last database update
Oct 8, 2026, 2:48 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Freshness: First saved / captured Oct 8, 2026, 2:48 AM; last database update Oct 8, 2026, 2:48 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.