Similar Contract Experience
Known from stored extractionBidder must satisfy the stated similar-contract experience requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Buying agencyMUNICIPALITY OF VALENCIA, NEGROS ORIENTAL
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
The stored deadline is approaching. Confirm the official deadline before investing more time.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
SCOPE OF WORK: AMOUNT
1.1 Project Billboard/Signboard 6,408.14 1.2 Occupational Safety and Health Program 5,124.00 1.3 Mobilization and Demobilization 42,000.00
2.1 Clearing of Vegetation 34,221.60 2.2 Staking and Lay-out 27,221.25
3.1 Wall Footing 125,267.07 3.2 Concrete Slab Foundation 344,834.95 3.3 Columbarium Wall Partition 1,676,832.84 3.4 Horizontal Concrete Slab Partition 1,058,280.86
4.1 Staking and Lay-out 4,547.55 4.2 Excavation for Column and Wall Footing 6,597.15 4.3 Column Footing 17,860.98 4.4 Column 23,387.22 4.5 Wall Footing 26,721.66 4.6 Beams 1 37,501.28 4.7 Beams 2 31,264.09 4.8 Concrete Floor Slab 38,780.99 4.9 CHB Wall w/ Plaster Finish on Both Sides 115,176.63 4.10 Rafters + Roofing 40,767.83 4.11 Ceiling Works 37,603.11 4.12 Electrical Works 29,161.97 4.13 Plumbing Works 85,705.31 4.14 Septic Tank 40,814.46 4.15 Excavation for Septic Tank 5,764.50 4.16 Paint Finish + Floor Tiles 41,857.96 4.17 Doors, Windows + Cubicles 65,747.33 TOTAL CONTRACT COST: ₱3,969,450.73
of the Works is required One Hundred Sixty (160) Calendar Days. Bidders should have completed a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly, in Section II (Instructions to Bidders).
discretionary “pass/fail” criterion as specified in the 2016 revised Implementing Rules and Regulations (IRR) of Republic Act (RA) No. 9184.
Awards Committee and inspect the Bidding Documents at the address given below from Monday-Thursday 7:00am-6:00pm.
October 8,2026 from given address and website/s below in the amount of Five Thousand Pesos Only (₱ 5,000.00). The Procuring Entity shall allow the bidder to present its proof of payment for the fees in person, by facsimile, or through electronic means.
Office at 2:00 pm, if applicable and/or through videoconferencing/webcasting via Zoom or Messenger, which shall be open to prospective bidders.
address as indicated below, on or before November 3, 2026 at 2:00 pm. Late bids shall not be accepted.
amount stated in ITB Clause 16.
be opened in the presence of the bidders’ representatives who choose to attend the activity.
bidding, or not award the contract at any time prior to contract award in accordance with Sections 35.6 and 41 of the 2016 revised Implementing Rules and Regulations (IRR) of RA No. 9184, without thereby incurring any liability to the affected bidder or bidders. Pre-bid Conference Date Time Venue 20/10/2026 2:00 PM BAC Conference Room, Valencia, Negros Oriental Created by Jerome Olasiman Limpahan Date Created 05/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Bidder must satisfy the stated similar-contract experience requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Bid Security is required in an acceptable form and amount.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 8, 2026, 12:00 AM
Nov 3, 2026, 2:00 PM
3 days leftOct 8, 2026, 2:48 AM
Oct 8, 2026, 2:48 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 8, 2026, 2:48 AM; last database update Oct 8, 2026, 2:48 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.