Invitation to Bid for Construction of Water System, Phase 2 (with Additional Water Reservoir & Install. Of Hoses), Brgy. Danawan, Surigao City ITB No. 016-2026
The BLGU- Poctoy, intends to apply the sum of One Million Pesos (Php1,000,000.00) being the Approved Budget for the Contract (ABC) to payments under the contract for Construction of Water System, Phase 2 (with Additional Water Reservoir & Install. Of Hoses), Brgy. Danawan, this city (ITB No. 016-2026). Bids received in excess of the ABC shall be automatically rejected at bid opening.
The BLGU- Poctoy, now invites bids for Construction of Water System, Phase 2 (with Additional Water Reservoir & Install. Of Hoses), Brgy. Danawan, this city (ITB No. 016-2026). Completion of the Works is required 60 calendar days. Bidders should have completed a contract similar to the Project. The description of an eligible bidder is contained in the Bidding Documents, particularly, in Section II Instructions to Bidders.
Bidding will be conducted through open competitive bidding procedures using non-discretionary “pass/fail” criterion as specified in the 2016 Revised Implementing Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the “Government Procurement Reform Act.”
Interested bidders may obtain further information from the Bids and Awards Committee, thru the BAC, Brgy. Poctoy, Surigao City and inspect the Bidding Documents at the address given below from 9:00 A.M. to 5:00 p.m., Mondays to Fridays.
A complete set of Bidding Documents may be acquired by interested bidders on October 19-30, 2026, Mondays to Fridays from the address below and upon payment of the applicable fee for the Bidding Documents, pursuant to the latest Guidelines issued by the GPPB, in the amount of One Thousand Pesos (Php1,000.00).
The BLGU- Poctoy will hold a Pre-Bid Conference on October 19, 2026, 2:00 p.m. at Brgy. Hall, Brgy. Poctoy, Surigao City which shall be open to prospective bidders.
Bids must be duly received by the BAC Secretariat at the address below on or before 2:00 p.m., October 30, 2026. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 18.
Bid opening shall be on October 30, 2026, 2:00 p.m. at Brgy. Hall, Brgy. Poctoy, Surigao City. Bids will be opened in the presence of the bidders’ representatives who choose to attend at the address below. Late bids shall not be accepted.
The BLGU- Poctoy, reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in accordance with Section 41 of RA 9184 and its IRR, without thereby incurring any liability to the affected bidder or bidders.
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
Extracted from the stored notice
Key requirements
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Experience & similar contracts
Similar Contract Experience
Known from stored extraction
Required in stored extraction
Bidder must satisfy the stated similar-contract experience requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Submission & process
Bid Security
Known from stored extraction
Required in stored extraction
Bid Security is required in an acceptable form and amount.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Pre-Bid Conference
Known from stored extraction
Required in stored extraction
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Stored timeline
Important dates
Published · Manila
Oct 10, 2026, 12:00 AM
Deadline · Manila
Oct 30, 2026, 2:00 PM
Stored deadline passed
First saved / captured
Oct 10, 2026, 2:43 AM
Last database update
Oct 10, 2026, 2:43 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Freshness: First saved / captured Oct 10, 2026, 2:43 AM; last database update Oct 10, 2026, 2:43 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.