Proposed Construction of Flood Control Structures (Riverwall) at Caingin, Hulo, Calvario, Zamora and Lawa, City of Meycauayan, Bulacan
Buying agencyCITY OF MEYCAUAYAN, BULACAN
Bid Brief
Is this bid worth a closer look?
Stored notice data. Confirm all decisions with the official documents.
Why this matters
The complete eligibility conditions must be checked in the official bidding documents.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
How screening states work
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
I. GENERAL REQUIREMENTS a. Mobilization/Demobilization b. Temporary Facilities c. Safety and Health d. Project Signboard II. BARANGAY CAINGIN a. Construction of Riverwall Protection a.1. Removal of Actual Structures / Obstructions a.2. Structural Steel, Sheet Pile Type II a.3. Structural Concrete (Job Mix, Class AA, 14 days) a.4. Reinforcing Steel, Grade 40 a.5. Formworks III. BARANGAY CALVARIO a. Construction of Riverwall Protection a.1. Removal of Actual Structures / Obstructions a.2. Structural Steel, Sheet Pile Type II a.3. Structural Concrete (Job Mix, Class AA, 14 days) a.4. Reinforcing Steel, Grade 40 a.5. Formworks b. Construction of Floodgates IV. BARANGAY ZAMORA a. Construction of Riverwall Protection a.1. Removal of Actual Structures / Obstructions a.2. Structural Steel, Sheet Pile Type II a.3. Structural Concrete (Job Mix, Class AA, 14 days) a.4. Reinforcing Steel, Grade 40 a.5. Formworks V. BARANGAY HULO a. Construction of Riverwall Protection a.1. Removal of Actual Structures / Obstructions a.2. Structural Steel, Sheet Pile Type II a.3. Structural Concrete (Job Mix, Class AA, 14 days) a.4. Reinforcing Steel, Grade 40 a.5. Formworks b. Construction of Floodgates VI. BARANGAY LAWA a. Construction of Riverwall Protection a.1. Removal of Actual Structures / Obstructions a.2. Structural Steel, Sheet Pile Type II a.3. Structural Concrete (Job Mix, Class AA, 14 days) a.4. Reinforcing Steel, Grade 40 a.5. Formworks b. Construction of Floodgates
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Review the official notice and bidding documents for the complete requirements.
Oct 12, 2026, 12:00 AM
Nov 3, 2026, 10:00 AM
3 days leftOct 12, 2026, 4:36 AM
Oct 12, 2026, 4:36 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
- Original reference
- 13280450
- Original stored title
- Proposed Construction of Flood Control Structures (Riverwall) at Caingin, Hulo, Calvario, Zamora and Lawa, City of Meycauayan, Bulacan
- Original buying agency
- CITY OF MEYCAUAYAN, BULACAN
- Stored status
- active
View original stored description
Freshness: First saved / captured Oct 12, 2026, 4:36 AM; last database update Oct 12, 2026, 4:36 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.
