Construction ProjectsOpen · stored

Construction of Two Storey School Building at Paiisa National High School, Brgy. Paiisa, Tiaong, Quezon

Buying agencyMUNICIPALITY OF TIAONG, QUEZON

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱9,999,484.83
Time remaining5 days leftDeadline Nov 5, 2026, 10:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
No active requirements are storedNeeds verification
Why this matters

The complete eligibility conditions must be checked in the official bidding documents.

Next action
Review official notice

Use the supporting sections below to verify the evidence.

Reference 13288137

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

B.5 Project Billboard/Signboard Quantity: 1.00 each Materials: Ordinary Plywood ( 1/2" x 4' x 8') 2.00 pcs. Coco Lumber (2" x 3" x 12') 5.00 pcs. Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kg. Labor: 1 Carpenter 0.50 day 2 Laborer 0.50 day B.7 Construction Safety and Health Quantity: 1.00 l.s. Materials Safety Helmet 30.00 pc(s) Hand Gloves 30.00 pair(s) Safety Shoes 30.00 pair(s) Safety Vest 30.00 pc(s) Rain Coats 30.00 pc(s) Dust Mask 30.00 pc(s) Eye Goggles 30.00 pc(s) Misc (Medicine, Medicine Cabinet, Water, First Aid Kit) 1.00 lot 803(1)a Structure Excavation, Common Soil Quantity: 104.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 6.00 hour 2 Dump Truck (12 cu.yd) 6.00 hour 804(1)a Embankment from Structure Excavation Quantity: 78.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 8.00 hour 1 Plate Compactor 8.00 hour 804(7) Gravel Fill Quantity 25.50 cu.m Materials Gravel Fill 27.00 cu.m Labor 1 Foreman 3.00 days 3 Laborer 3.00 days Equipment 1 Plate Compactor 10.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)c Structural Concrete (3000 psi, Class A, 28 days) Quantity 22.00 cu.m Materials Ready Mix Concrete 3000Psi @ 28 Days 24.00 cu.m Labor 1 Foreman 2.00 days 2 Skilled Laborer 2.00 days 6 Laborer 2.00 days Equipment 2 Concrete Vibrator 6.00 hour 1 Pumpcrete 3.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)d Structural Concrete (4000 psi, Class A, 28 days) Quantity 81.25 cu.m Materials Ready Mix Concrete 4000Psi @ 28 Days 85.00 cu.m Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 6 Laborer 8.00 days Equipment 2 Concrete Vibrator 26.00 hour 1 Pumpcrete 15.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a1 Reinforcing Steel (Deformed) Grade 40 Quantity 7,232.10 kg Materials Reinforcing Steel Bars Deformed Grade 40 7,233.00 kg GI Tie Wire #16 109.00 kg Labor 1 Foreman 8.00 days 3 Skilled Laborer 8.00 days 12 Laborer 8.00 days Equipment 1 Bar Cutter 29.00 hour 1 Bar Bender 29.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a2 Reinforcing Steel (Deformed) Grade 60 Quantity 9,518.17 kg Materials Reinforcing Steel Bars Deformed Grade 60 9,519.00 kg GI Tie Wire #16 143.00 kg Labor 1 Foreman 11.00 days 3 Skilled Laborer 11.00 days 12 Laborer 11.00 days Equipment 1 Bar Cutter 38.00 hour 1 Bar Bender 38.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 903(2) Formworks and Falseworks Quantity 634.00 sq.m Materials Phenolic Board - 1.22m x 2.44m x 18mm 55.00 pc Good Lumber 999.00 bd.ft Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 18.00 days 4 Skilled Laborer 18.00 days 6 Laborer 18.00 days Stripping 6 Laborer 10.00 days Equipment 40 H-Frame 1.7 m x 1.2m, set 43.00 hrs 2pcs H-frames 4pcs diagonal cross braces 4pcs Horizontal cross braces 8pcs joint pins 62 Shoring Jack,3.8 m full extension 43.00 hrs 80 Adj. U-Head Jack, 0.60m 43.00 hrs 80 Adj. Base Jack, 0.60m 43.00 hrs 62 1-1/2" GI Pipe x 6.0 m 43.00 hrs 16 1-1/2" GI Pipe x 3.0 m 43.00 hrs 32 1-1/2" GI Pipe x 4.0 m 43.00 hrs 216 1-1/2" GI Pipe x 1.0 m 43.00 hrs 278 Tie Rod x 0.60m 43.00 hrs 558 Round Wing Not 43.00 hrs 1000(1) Soil Poisoning Quantity 91.00 liter Materials Soil Poisoning 91.00 lit Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100mm Quantity 123.00 sq.m Materials CHB Ordinary (101mm x 203mm x 406mm) 1,599.00 pcs Portland Cement 65.00 bag Sand 6.00 cu.m Reinforcing Steel Bars Deformed Grade 40 399.00 kg GI Tie Wire #16 7.00 kg Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 3 Laborer 5.00 days Equipment 1 One Bagger Mixer 36.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150mm Quantity 244.00 sq.m. Materials CHB Ordinary (150mm x 230mm x 406mm) 3,172.00 pcs Portland Cement 366.00 bag Sand 11.00 cu.m Reinforcing Steel Bars Deformed Grade 40 791.00 kg GI Tie Wire #16 13.00 kg Labor 1 Foreman 10.00 days 2 Skilled Laborer 10.00 days 3 Laborer 10.00 days Equipment 1 One Bagger Mixer 74.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1010 Doors Quantity 23.00 sq.m. Materials Panel Door 8.00 sq.m Flush Hollow Core Door 15.00 sq.m Door Frames (Jambs, Sills, Head, Transoms and Mullions) 12.00 set Door Locks (Schlage or Equivalent) 12.00 set Door Hinge (50mm x 101mm) 48.00 pc Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 8.00 days 3 Skilled Laborer 8.00 days 3 Laborer 8.00 days 1008(1)c Aluminum Glass Window (Awning Type) Quantity 32.00 sq.m Materials Aluminum framed Glass Window (Awning Type) 32.00 sq.m Consumables (3% of Material Cost) 1.00 lot Labor 1 Foreman 6.00 days 1 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1027(1) Cement Plaster Finish Quantity 734 sq.m Materials Portland Cement 243.00 bag Sand 20.00 cu.m Labor 1 Foreman 10.00 days 2 Skilled Laborer 10.00 days 3 Laborer 10.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Quantity 247 sq.m Materials 4.5 mm Fiber Cement Board 91.00 pcs Metal Furring (3/4" x 2" x 16', 0.5 mm thk) 280.00 pcs Carrying Channel (1" x 2" x 16',0.6 mm thk) 89.00 pcs Hanger Bars/Rod 247.00 pcs Channel clip 1,482.00 pcs Wall Angle, Ga.26 (1" x 1"x 10', 0.4 mm thk) 59.00 pcs Rivets (5/32" x 3/8") 3,458.00 pcs 1" Metal Screw 988.00 pcs Labor 1 Foreman 21.00 days 1 Skilled Laborer 21.00 days 2 Laborer 21.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(11) Fascia Board (19mm, Fiber Cement Board) Quantity 47 l.m. Materials 2-12 mm x 300mm Fiber Cement Board 47.00 m 1" Metal Screws 564.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003 (17) Carpentry and Joinery Works Quantity 1.00 l.s Materials Marine Plywood (1/4'' x 4' x 8') 4.00 pc Good Lumber 50.00 bd-ft CWN, Assorted 3.00 kg Concrete Nail, Assorted 1.00 kg Solvent-Based Primer 0.50 gal Blackboard Paint 3.00 L Paint Thinner 1.00 gal Door Handle Lever Type 11.00 set Consumables 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(1) Glazed Tiles and Trims Quantity 219 sq.m Materials Ceramic Glazed Tiles 230.00 sq.m Portland Cement 72.00 bags Sand 6.00 cu.m Tile Grout 27.00 bags Tile Adhesive 31.00 bags Consumables 1.00 lot Labor 1 Foreman 11.00 days 5 Skilled Laborer 11.00 days 5 Laborer 11.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(2) Unglazed Tiles Quantity 43 sq.m Materials Ceramic Unglazed Tiles 46.00 sq.m Portland Cement 14.00 bags Sand 2.00 cu.m Tile Grout 6.00 bags Consumables (2% of Material Cost) 1.00 lot Labor 1 Foreman 3.00 days 5 Skilled Laborer 3.00 days 5 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1021(1)c Cement Floor Finish (with Floor Hardener) Quantity 12.00 sq.m Materials Cement 9.00 sq.m Sand 1.00 sq.m Floor Hardener 1.00 bag Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1021(1)a Cement Floor Finish (Plain) Quantity 70.00 sq.m Materials Cement 51.00 sq.m Sand 4.00 sq.m Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 3 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-I Finishing Works Quantity 1.00 lot Materials Decorative Red Brick Wall 1.00 lot Stainless Lettering 1.00 set Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 5.00 days 1 Skilled Laborer 5.00 days 3 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)a Painting Works (Masonry/Concrete) Quantity 915 sq.m Materials Concrete Neutralizer 19.00 gal Concrete Sealer/Primer 37.00 gal Patching Compound 46.00 gal Semi-Gloss Latex (2 coats only) 74.00 gal Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 29.00 days 2 Skilled Laborer 29.00 days 1 Laborer 29.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)b Painting Works (Wood) Quantity 16.00 sq.m Materials Glazzing Putty 1.00 gal Flat Wall Paint Enamel 1.00 gal Enamel Quick Dry 1.00 gal Paint Thinner 4.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)c Painting Works (Steel) Quantity 254 sq.m Materials Red Oxide Primer 11.00 gal Flat Wall Enamel 26.00 gal Paint Thinner 64.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 2 Skilled Laborer 9.00 days 1 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1014(1)b2 Prepainted Metal Sheets (above 0.427mm) Rib Type Long Span Quantity 191 sq.m. Materials Prepainted Metal Sheets (above 0.427 mm, Rib Type, Long Span) 201.00 sq.m. Tekscrew w/ J-bolt with washers 1,910.00 pcs Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 1 Skilled Laborer 9.00 days 2 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(7) Structural Steel Quantity 1,454.00 kg. Materials Structural Steel Truss 1,454.00 kg Acetylene 16.00 kg Oxygen 32.00 kg Welding Rod 30.00 kg Consumables Materials (3% of Matl. Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Erection 1 Skilled Laborer 3.00 days 2 Laborer 3.00 days Equipment 1 Welding Machine, Electric Driven/DC Output, 500 Amp 13.00 hours 1 Cutting Outfit 5.00 hours 1 Truck-Mounted Crane, Std Lattice Boom 9.00 hours 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(8)b Structural Steel (Purlins) Quantity 1,400.00 kg Materials Structural Steel Purlins 1,414.00 kg Welding Rod 28.00 kg Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 2 Welding Machine, Electric Driven/DC Output, 500 Amp 16.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(5) Metal Structure Accessories Quantity 419.00 kg Materials Steel Plates 163.00 kg Sagrod with nuts & Bolts 129.00 kg Cross Bracing 127.00 kg 16mm Ø turn buckles 12.00 pc Bolts and Rods 18.00 ea Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1051 (1) Railing Quantity 1.00 l.s Materials Stainless Steel Pipe, Sch 40. (2" | 50 mm dia) 10.00 pc Welding Rod 20.00 kg Stainless Steel Pipe, Sch 40. (2" | 38 mm dia.) 17.00 pc 50 x 100 x 5 mm Rectangular Hollow bar 5.00 pc 50 x 50 x 2 mm Rectangular Hollow bar 18.00 pc Checkered Plate 6mm (Flooring) 10.00 set Consumables 1.00 lot Labor 1 Foreman 9.00 days 5 Skilled Laborer 9.00 days 5 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)b Fabricated Metal Roofing Accessory (Flashing, Ga. 26) Quantity 51.50 l.m Materials Pre-painted flashing, Ga.26 (0.551mm) x 2.44mm 55.00 m Blind Rivets 979.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)c Fabricated Metal Roofing Accessory (Gutter, Ga. 24) Quantity 47.00 l.m Materials Pre-painted Gutter, Ga. 24 (0.701 mm) X 2.44 m 47.00 m 12" x 1" Plain GI Strap 141.00 pc Blind Rivets 752.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1016(1)a Waterproofing (Cement-base) Quantity 118.00 sq.m Materials Waterproofing (Cement-based) 124.00 sq.m Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 8.00 days 1 Skilled Laborer 8.00 days 1 Laborer 8.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(8) Sewer Line Works Quantity 1.00 l.s. Materials 100 mm uPVC Pipe (3m) 16.00 pcs 50 mm PVC Pipe (3m) 11.00 pcs PVC 87.5 deg. Single Branch, Seep Tee (101 mm x 50 mm) 8.00 pcs PVC 87.5deg. (6mm BEND x 101mm) 9.00 pcs PVC Seep, Tee, Single Branch, 87.5° (101mm x 101mm) 17.00 pcs PVS Solvent Cement 20.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(24) Cold Water lines Quantity 1.00 l.s. Materials PPR Pipe (32mm dia) 8.00 pcs PPR Coupling Elbow (32 mm dia) 10.00 pcs PPR Tee Banded (32 mm dia) 16.00 pcs Teflon Tape 216.00 roll Gate Valve (32 mm) 4.00 pcs Check Valve (32 mm) 1.00 pcs Water Meter (32 mm) 1.00 pcs Stainless Steel Water Storage Tank (3000L) 1.00 pcs 1 HP Automatic Water Pump 1.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 3 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(4) Plumbing Fixtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc - American std or equivalent 7.00 pcs Lavatory inc. fittings & acc. American std or equivalent 4.00 pcs Floor Drain 11.00 pcs Urinal 2.00 pcs Urinal Drain 2.00 pcs Faucet 6.00 pcs Brass Clean-Out 1.00 pcs Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(9) Storm Drainage and Downspout Quantity 1.00 l.s. Materials PVC PIPES (101mm D) 9.00 pcs PVC 45deg. SINGLE BRANCH, WYE (101mm x 101mm) 4.00 pcs Solvent 5.00 liters Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(11) Septic Vault/ Tank (Concrete / CHB) Quantity 1.00 l.s. Materials Portland Cement 68.00 bags Sand 5.00 cu.m. Gravel 6.00 sq.m. Reinforcing Steel Bar 916.00 kgs G.I. Wire 26.00 kgs Lumber, Good - 4 uses 164.00 bd-ft Marine Plywood (1/2"x4"x8') 13.00 pc Assorted CWN (1kg/100bd.ft) 4.00 kgs Water Proofing Cement (Sahara or Equivalent) 13.00 bags Brass Clean-out 4.00 pc Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(6) Catch Basin Quantity 1.00 l.s Materials Portland Cement 28.00 bags Sand 7.00 cu.m Gravel 7.00 cu.m Grade 40 Steel 273.00 kgs #16 Galvanized Iron Wire 5.46 kgs Consumables 1.00 lot Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 4 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) Quantity 1.00 l.s. Materials 20 mmØ uPVC conduit 100.00 l.m 20 mmØ PVC Adapter 40.00 l.m RSC Pipe 1" 1.00 pc Utility box, deep type 36.00 pc Junction box, deep type 40.00 pc Consumables 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1101(33) Wires and Wiring Devices Quantity 1.00 l.s. Materials Wires THWN/THHN 5.5 mm2 110.00 l.m. Wires THWN/THHN 14 mm2 10.00 l.m. Wires THWN/THHN 8.0 mm2 1.00 box Wires THWN/THHN 3.5 mm2 2.00 box Wires THWN/THHN 2.0 mm2 2.00 box One-gang Switch 8.00 set One-gang Two Way Switch 2.00 set Two-Gang Switch 6.00 set Duplex Convenience Outlet 12.00 set Special Purpose Outlet 2.00 set Tape, bolt&nut etc. 1.00 lot JB cover clamps, screw and anchors 1.00 lot Split Type Aircon 2 HP 2.00 lot Exhaust Fan 2.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 3 Skilled Laborer 9.00 days 5 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(1) Panelboard with Main & Branch Breakers Quantity 1.00 l.s. Materials Circuit Breaker 2.00 lot Panelboard Nema 3R 2.00 lot Weather Tight Connector 1" 2.00 pcs Grounding Clamp 5/8 1.00 pc Gronding Rod 5/8 1.00 pc Secondary Rack Single Spool 1.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 6.00 days 2 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1103(1) Lighting Fixtures Quantity 1.00 l.s. Materials 12 watts Recessed Ceiling-mounted LED Box-type light 19.00 set T8 18w Louver Type Double Tube Fluorescent Daylight 16.00 set Emergency Light 12V Dual Light and Color 6.00 unit Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1201 (9) a Overhead Tank (Stainless) Quantity 1.00 set Materials PVC Pipe, 75mm dia. X 3m, S-1000 4.00 pc PVC Blue Pipe, 50mm dia. X 3m 3.00 pc PVC Blue Pipe, 20mm dia. X 3m 1.00 pc PVC Elbow, 75mm dia. X 90deg bend 12.00 pc PVC Elbow, 75mm dia. X 45deg bend 8.00 pc PVC Blue Elbow, 20mm dia. X 90deg bend 2.00 pc PVC Blue Elbow, 50mm dia. X 90deg bend 2.00 pc PVC Blue Tee, 50mm dia. 1.00 pc Stainless coupling 304, 50mm dia 3.00 pc Stainless coupling 304, 20mm dia 2.00 pc PVC Reducer Coupling, 75mm dia X 50mm dia 1.00 pc Gate Valve, 50mm dia 1.00 pc Hose Bibb, 20mm dia 1.00 pc PVC Solvent, 200cc 3.00 pc Stainless Steel Tank (304), 1.90 x 3.0 m (Vertical), includes platform ladder 1.00 pc Consumables 1.00 lot Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 2 Laborer 8.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(18) Solar Panel with Inverter, Battery and Other Devices Quantity 1.00 l.s. Materials Hydbrid Inverter - 12KW 1.00 pc 15kWhigh Voltage LiFePo4 Battery 2.00 pc Smart Meter 1PH - LHE12DRR11001 1.00 pc GCL Solar Panel 620W NT12R/66GDF 20.00 pc MA Rail L2400 22.00 pc MA Mid Clamp 35mm 44.00 pc MA End Clamp 35mm 60.00 pc MA Ground Clamp 35mm 22.00 pc MA Lfoot 60.00 pc MA Splicer 44.00 pc PV Wire Twin Core 2*6mm 200.00 meter AC Wire THHN 30 mm2 60.00 meter AC Wire THHN 3.5 mm2 100.00 meter PV Connector MC4-6mm 12.00 pc DC MCB-63 2P 600V 20A 6.00 pc DC Surge Protection Device 2P 600V 20-40 Kpa 6.00 pc AC Surge Protection Device 2P 275V 20-40 Kpa 1.00 pc ATS (SQ3M-125/2 230V400V) 125A 2P 1.00 pc DC Combiner Box 225A with Joymell MCCB 1.00 pc AC MCB (SCB8-63 400V)2P 100A 2.00 pc Flexible HDPE "1" 40mm 200.00 meter Metal Enclosure Box (800*600*200) 1.00 pc Metal Ground Rod 3M 1.00 pc Cable tray Slotted 80x80 mm 4.00 pc Consumables and other hardwares 1.00 lot Labor 1 Foreman 12.00 days 10 Skilled Laborer 12.00 days 10 Laborer 12.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1106(1) CCTV System Quantity 1.00 l.s. Materials 4mp Full Color Camera 12.00 units 16CH NVR 1.00 pc 8TB Surveillance HDD 1.00 pc 24-Port Gigabit PoE Switch 1.00 pc 1500VA UPS 1.00 pc 43" 4K Smart TV/Monitor 1.00 pc CAT6 UTP Cable 6.00 boxes CCTV Cabinet, Patch Panel, Connectors, Junction Boxes, RJ45, Mounts & Accessories 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1202(6)a1 Fire Extinguisher (10 lbs ABC Dry Chemical) Quantity 4.00 set Materials 10 lbs Fire Extinguisher (ABC Dry Chemical with Wall Bracket) 4.00 set(s) Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1208(1) Fire Alarm System Quantity 1.00 L.s. Materials Fire Alarm Control Panel 1.00 set Manual Pull Switch 2.00 set Bell, Vibrating Type 2.00 set Equipment for Fire Alarm, Smoke Detector 4.00 pcs Consumables 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 1 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

No active requirements are stored.

Review the official notice and bidding documents for the complete requirements.

Stored timeline

Important dates

Published · Manila

Oct 15, 2026, 12:00 AM

Deadline · Manila

Nov 5, 2026, 10:00 AM

5 days left
First saved / captured

Oct 15, 2026, 3:22 AM

Last database update

Oct 15, 2026, 3:22 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13288137
Original stored title
Construction of Two Storey School Building at Paiisa National High School, Brgy. Paiisa, Tiaong, Quezon
Original buying agency
MUNICIPALITY OF TIAONG, QUEZON
Stored status
active
View original stored description
B.5 Project Billboard/Signboard Quantity: 1.00 each Materials: Ordinary Plywood ( 1/2" x 4' x 8') 2.00 pcs. Coco Lumber (2" x 3" x 12') 5.00 pcs. Tarpaulin (8' x 8') 1.00 unit Assorted CWN 1.00 kg. Labor: 1 Carpenter 0.50 day 2 Laborer 0.50 day B.7 Construction Safety and Health Quantity: 1.00 l.s. Materials Safety Helmet 30.00 pc(s) Hand Gloves 30.00 pair(s) Safety Shoes 30.00 pair(s) Safety Vest 30.00 pc(s) Rain Coats 30.00 pc(s) Dust Mask 30.00 pc(s) Eye Goggles 30.00 pc(s) Misc (Medicine, Medicine Cabinet, Water, First Aid Kit) 1.00 lot 803(1)a Structure Excavation, Common Soil Quantity: 104.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 6.00 hour 2 Dump Truck (12 cu.yd) 6.00 hour 804(1)a Embankment from Structure Excavation Quantity: 78.00 cu.m Labor 1 Foreman 1.00 days 3 Laborer 1.00 days Equipment 1 Backhoe (0.80 cu.m) 8.00 hour 1 Plate Compactor 8.00 hour 804(7) Gravel Fill Quantity 25.50 cu.m Materials Gravel Fill 27.00 cu.m Labor 1 Foreman 3.00 days 3 Laborer 3.00 days Equipment 1 Plate Compactor 10.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)c Structural Concrete (3000 psi, Class A, 28 days) Quantity 22.00 cu.m Materials Ready Mix Concrete 3000Psi @ 28 Days 24.00 cu.m Labor 1 Foreman 2.00 days 2 Skilled Laborer 2.00 days 6 Laborer 2.00 days Equipment 2 Concrete Vibrator 6.00 hour 1 Pumpcrete 3.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 900(1)d Structural Concrete (4000 psi, Class A, 28 days) Quantity 81.25 cu.m Materials Ready Mix Concrete 4000Psi @ 28 Days 85.00 cu.m Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 6 Laborer 8.00 days Equipment 2 Concrete Vibrator 26.00 hour 1 Pumpcrete 15.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a1 Reinforcing Steel (Deformed) Grade 40 Quantity 7,232.10 kg Materials Reinforcing Steel Bars Deformed Grade 40 7,233.00 kg GI Tie Wire #16 109.00 kg Labor 1 Foreman 8.00 days 3 Skilled Laborer 8.00 days 12 Laborer 8.00 days Equipment 1 Bar Cutter 29.00 hour 1 Bar Bender 29.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 902(1)a2 Reinforcing Steel (Deformed) Grade 60 Quantity 9,518.17 kg Materials Reinforcing Steel Bars Deformed Grade 60 9,519.00 kg GI Tie Wire #16 143.00 kg Labor 1 Foreman 11.00 days 3 Skilled Laborer 11.00 days 12 Laborer 11.00 days Equipment 1 Bar Cutter 38.00 hour 1 Bar Bender 38.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 903(2) Formworks and Falseworks Quantity 634.00 sq.m Materials Phenolic Board - 1.22m x 2.44m x 18mm 55.00 pc Good Lumber 999.00 bd.ft Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 18.00 days 4 Skilled Laborer 18.00 days 6 Laborer 18.00 days Stripping 6 Laborer 10.00 days Equipment 40 H-Frame 1.7 m x 1.2m, set 43.00 hrs 2pcs H-frames 4pcs diagonal cross braces 4pcs Horizontal cross braces 8pcs joint pins 62 Shoring Jack,3.8 m full extension 43.00 hrs 80 Adj. U-Head Jack, 0.60m 43.00 hrs 80 Adj. Base Jack, 0.60m 43.00 hrs 62 1-1/2" GI Pipe x 6.0 m 43.00 hrs 16 1-1/2" GI Pipe x 3.0 m 43.00 hrs 32 1-1/2" GI Pipe x 4.0 m 43.00 hrs 216 1-1/2" GI Pipe x 1.0 m 43.00 hrs 278 Tie Rod x 0.60m 43.00 hrs 558 Round Wing Not 43.00 hrs 1000(1) Soil Poisoning Quantity 91.00 liter Materials Soil Poisoning 91.00 lit Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a1 CHB Non-Load Bearing (including Reinforcing Steel), 100mm Quantity 123.00 sq.m Materials CHB Ordinary (101mm x 203mm x 406mm) 1,599.00 pcs Portland Cement 65.00 bag Sand 6.00 cu.m Reinforcing Steel Bars Deformed Grade 40 399.00 kg GI Tie Wire #16 7.00 kg Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 3 Laborer 5.00 days Equipment 1 One Bagger Mixer 36.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1046(2)a2 CHB Non-Load Bearing (including Reinforcing Steel), 150mm Quantity 244.00 sq.m. Materials CHB Ordinary (150mm x 230mm x 406mm) 3,172.00 pcs Portland Cement 366.00 bag Sand 11.00 cu.m Reinforcing Steel Bars Deformed Grade 40 791.00 kg GI Tie Wire #16 13.00 kg Labor 1 Foreman 10.00 days 2 Skilled Laborer 10.00 days 3 Laborer 10.00 days Equipment 1 One Bagger Mixer 74.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1010 Doors Quantity 23.00 sq.m. Materials Panel Door 8.00 sq.m Flush Hollow Core Door 15.00 sq.m Door Frames (Jambs, Sills, Head, Transoms and Mullions) 12.00 set Door Locks (Schlage or Equivalent) 12.00 set Door Hinge (50mm x 101mm) 48.00 pc Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 8.00 days 3 Skilled Laborer 8.00 days 3 Laborer 8.00 days 1008(1)c Aluminum Glass Window (Awning Type) Quantity 32.00 sq.m Materials Aluminum framed Glass Window (Awning Type) 32.00 sq.m Consumables (3% of Material Cost) 1.00 lot Labor 1 Foreman 6.00 days 1 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1027(1) Cement Plaster Finish Quantity 734 sq.m Materials Portland Cement 243.00 bag Sand 20.00 cu.m Labor 1 Foreman 10.00 days 2 Skilled Laborer 10.00 days 3 Laborer 10.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) Quantity 247 sq.m Materials 4.5 mm Fiber Cement Board 91.00 pcs Metal Furring (3/4" x 2" x 16', 0.5 mm thk) 280.00 pcs Carrying Channel (1" x 2" x 16',0.6 mm thk) 89.00 pcs Hanger Bars/Rod 247.00 pcs Channel clip 1,482.00 pcs Wall Angle, Ga.26 (1" x 1"x 10', 0.4 mm thk) 59.00 pcs Rivets (5/32" x 3/8") 3,458.00 pcs 1" Metal Screw 988.00 pcs Labor 1 Foreman 21.00 days 1 Skilled Laborer 21.00 days 2 Laborer 21.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003(11) Fascia Board (19mm, Fiber Cement Board) Quantity 47 l.m. Materials 2-12 mm x 300mm Fiber Cement Board 47.00 m 1" Metal Screws 564.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1003 (17) Carpentry and Joinery Works Quantity 1.00 l.s Materials Marine Plywood (1/4'' x 4' x 8') 4.00 pc Good Lumber 50.00 bd-ft CWN, Assorted 3.00 kg Concrete Nail, Assorted 1.00 kg Solvent-Based Primer 0.50 gal Blackboard Paint 3.00 L Paint Thinner 1.00 gal Door Handle Lever Type 11.00 set Consumables 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(1) Glazed Tiles and Trims Quantity 219 sq.m Materials Ceramic Glazed Tiles 230.00 sq.m Portland Cement 72.00 bags Sand 6.00 cu.m Tile Grout 27.00 bags Tile Adhesive 31.00 bags Consumables 1.00 lot Labor 1 Foreman 11.00 days 5 Skilled Laborer 11.00 days 5 Laborer 11.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1018(2) Unglazed Tiles Quantity 43 sq.m Materials Ceramic Unglazed Tiles 46.00 sq.m Portland Cement 14.00 bags Sand 2.00 cu.m Tile Grout 6.00 bags Consumables (2% of Material Cost) 1.00 lot Labor 1 Foreman 3.00 days 5 Skilled Laborer 3.00 days 5 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1021(1)c Cement Floor Finish (with Floor Hardener) Quantity 12.00 sq.m Materials Cement 9.00 sq.m Sand 1.00 sq.m Floor Hardener 1.00 bag Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1021(1)a Cement Floor Finish (Plain) Quantity 70.00 sq.m Materials Cement 51.00 sq.m Sand 4.00 sq.m Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 3 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot SPL-I Finishing Works Quantity 1.00 lot Materials Decorative Red Brick Wall 1.00 lot Stainless Lettering 1.00 set Consumables (5% of Material Cost) 1.00 lot Labor 1 Foreman 5.00 days 1 Skilled Laborer 5.00 days 3 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)a Painting Works (Masonry/Concrete) Quantity 915 sq.m Materials Concrete Neutralizer 19.00 gal Concrete Sealer/Primer 37.00 gal Patching Compound 46.00 gal Semi-Gloss Latex (2 coats only) 74.00 gal Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 29.00 days 2 Skilled Laborer 29.00 days 1 Laborer 29.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)b Painting Works (Wood) Quantity 16.00 sq.m Materials Glazzing Putty 1.00 gal Flat Wall Paint Enamel 1.00 gal Enamel Quick Dry 1.00 gal Paint Thinner 4.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1032(1)c Painting Works (Steel) Quantity 254 sq.m Materials Red Oxide Primer 11.00 gal Flat Wall Enamel 26.00 gal Paint Thinner 64.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 2 Skilled Laborer 9.00 days 1 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1014(1)b2 Prepainted Metal Sheets (above 0.427mm) Rib Type Long Span Quantity 191 sq.m. Materials Prepainted Metal Sheets (above 0.427 mm, Rib Type, Long Span) 201.00 sq.m. Tekscrew w/ J-bolt with washers 1,910.00 pcs Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 1 Skilled Laborer 9.00 days 2 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(7) Structural Steel Quantity 1,454.00 kg. Materials Structural Steel Truss 1,454.00 kg Acetylene 16.00 kg Oxygen 32.00 kg Welding Rod 30.00 kg Consumables Materials (3% of Matl. Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Erection 1 Skilled Laborer 3.00 days 2 Laborer 3.00 days Equipment 1 Welding Machine, Electric Driven/DC Output, 500 Amp 13.00 hours 1 Cutting Outfit 5.00 hours 1 Truck-Mounted Crane, Std Lattice Boom 9.00 hours 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(8)b Structural Steel (Purlins) Quantity 1,400.00 kg Materials Structural Steel Purlins 1,414.00 kg Welding Rod 28.00 kg Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 2 Welding Machine, Electric Driven/DC Output, 500 Amp 16.00 hour 1 Minor Tools (10% of Labor Cost) 1.00 lot 1047(5) Metal Structure Accessories Quantity 419.00 kg Materials Steel Plates 163.00 kg Sagrod with nuts & Bolts 129.00 kg Cross Bracing 127.00 kg 16mm Ø turn buckles 12.00 pc Bolts and Rods 18.00 ea Consumables (1% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1051 (1) Railing Quantity 1.00 l.s Materials Stainless Steel Pipe, Sch 40. (2" | 50 mm dia) 10.00 pc Welding Rod 20.00 kg Stainless Steel Pipe, Sch 40. (2" | 38 mm dia.) 17.00 pc 50 x 100 x 5 mm Rectangular Hollow bar 5.00 pc 50 x 50 x 2 mm Rectangular Hollow bar 18.00 pc Checkered Plate 6mm (Flooring) 10.00 set Consumables 1.00 lot Labor 1 Foreman 9.00 days 5 Skilled Laborer 9.00 days 5 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)b Fabricated Metal Roofing Accessory (Flashing, Ga. 26) Quantity 51.50 l.m Materials Pre-painted flashing, Ga.26 (0.551mm) x 2.44mm 55.00 m Blind Rivets 979.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1013(2)c Fabricated Metal Roofing Accessory (Gutter, Ga. 24) Quantity 47.00 l.m Materials Pre-painted Gutter, Ga. 24 (0.701 mm) X 2.44 m 47.00 m 12" x 1" Plain GI Strap 141.00 pc Blind Rivets 752.00 pc Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 1.00 days 1 Skilled Laborer 1.00 days 1 Laborer 1.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1016(1)a Waterproofing (Cement-base) Quantity 118.00 sq.m Materials Waterproofing (Cement-based) 124.00 sq.m Consumables (3% of Materials Cost) 1.00 lot Labor 1 Foreman 8.00 days 1 Skilled Laborer 8.00 days 1 Laborer 8.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(8) Sewer Line Works Quantity 1.00 l.s. Materials 100 mm uPVC Pipe (3m) 16.00 pcs 50 mm PVC Pipe (3m) 11.00 pcs PVC 87.5 deg. Single Branch, Seep Tee (101 mm x 50 mm) 8.00 pcs PVC 87.5deg. (6mm BEND x 101mm) 9.00 pcs PVC Seep, Tee, Single Branch, 87.5° (101mm x 101mm) 17.00 pcs PVS Solvent Cement 20.00 liter Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(24) Cold Water lines Quantity 1.00 l.s. Materials PPR Pipe (32mm dia) 8.00 pcs PPR Coupling Elbow (32 mm dia) 10.00 pcs PPR Tee Banded (32 mm dia) 16.00 pcs Teflon Tape 216.00 roll Gate Valve (32 mm) 4.00 pcs Check Valve (32 mm) 1.00 pcs Water Meter (32 mm) 1.00 pcs Stainless Steel Water Storage Tank (3000L) 1.00 pcs 1 HP Automatic Water Pump 1.00 pcs Consumables (5% of Materials) 1.00 lot Labor 1 Foreman 7.00 days 2 Skilled Laborer 7.00 days 3 Laborer 7.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1002(4) Plumbing Fixtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc - American std or equivalent 7.00 pcs Lavatory inc. fittings & acc. American std or equivalent 4.00 pcs Floor Drain 11.00 pcs Urinal 2.00 pcs Urinal Drain 2.00 pcs Faucet 6.00 pcs Brass Clean-Out 1.00 pcs Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 2 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(9) Storm Drainage and Downspout Quantity 1.00 l.s. Materials PVC PIPES (101mm D) 9.00 pcs PVC 45deg. SINGLE BRANCH, WYE (101mm x 101mm) 4.00 pcs Solvent 5.00 liters Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 1 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(11) Septic Vault/ Tank (Concrete / CHB) Quantity 1.00 l.s. Materials Portland Cement 68.00 bags Sand 5.00 cu.m. Gravel 6.00 sq.m. Reinforcing Steel Bar 916.00 kgs G.I. Wire 26.00 kgs Lumber, Good - 4 uses 164.00 bd-ft Marine Plywood (1/2"x4"x8') 13.00 pc Assorted CWN (1kg/100bd.ft) 4.00 kgs Water Proofing Cement (Sahara or Equivalent) 13.00 bags Brass Clean-out 4.00 pc Labor 1 Foreman 4.00 days 2 Skilled Laborer 4.00 days 4 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1001(6) Catch Basin Quantity 1.00 l.s Materials Portland Cement 28.00 bags Sand 7.00 cu.m Gravel 7.00 cu.m Grade 40 Steel 273.00 kgs #16 Galvanized Iron Wire 5.46 kgs Consumables 1.00 lot Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 4 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) Quantity 1.00 l.s. Materials 20 mmØ uPVC conduit 100.00 l.m 20 mmØ PVC Adapter 40.00 l.m RSC Pipe 1" 1.00 pc Utility box, deep type 36.00 pc Junction box, deep type 40.00 pc Consumables 1.00 lot Labor 1 Foreman 2.00 days 1 Skilled Laborer 2.00 days 2 Laborer 2.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1101(33) Wires and Wiring Devices Quantity 1.00 l.s. Materials Wires THWN/THHN 5.5 mm2 110.00 l.m. Wires THWN/THHN 14 mm2 10.00 l.m. Wires THWN/THHN 8.0 mm2 1.00 box Wires THWN/THHN 3.5 mm2 2.00 box Wires THWN/THHN 2.0 mm2 2.00 box One-gang Switch 8.00 set One-gang Two Way Switch 2.00 set Two-Gang Switch 6.00 set Duplex Convenience Outlet 12.00 set Special Purpose Outlet 2.00 set Tape, bolt&nut etc. 1.00 lot JB cover clamps, screw and anchors 1.00 lot Split Type Aircon 2 HP 2.00 lot Exhaust Fan 2.00 lot Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 9.00 days 3 Skilled Laborer 9.00 days 5 Laborer 9.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(1) Panelboard with Main & Branch Breakers Quantity 1.00 l.s. Materials Circuit Breaker 2.00 lot Panelboard Nema 3R 2.00 lot Weather Tight Connector 1" 2.00 pcs Grounding Clamp 5/8 1.00 pc Gronding Rod 5/8 1.00 pc Secondary Rack Single Spool 1.00 pc Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 6.00 days 2 Skilled Laborer 6.00 days 2 Laborer 6.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1103(1) Lighting Fixtures Quantity 1.00 l.s. Materials 12 watts Recessed Ceiling-mounted LED Box-type light 19.00 set T8 18w Louver Type Double Tube Fluorescent Daylight 16.00 set Emergency Light 12V Dual Light and Color 6.00 unit Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1201 (9) a Overhead Tank (Stainless) Quantity 1.00 set Materials PVC Pipe, 75mm dia. X 3m, S-1000 4.00 pc PVC Blue Pipe, 50mm dia. X 3m 3.00 pc PVC Blue Pipe, 20mm dia. X 3m 1.00 pc PVC Elbow, 75mm dia. X 90deg bend 12.00 pc PVC Elbow, 75mm dia. X 45deg bend 8.00 pc PVC Blue Elbow, 20mm dia. X 90deg bend 2.00 pc PVC Blue Elbow, 50mm dia. X 90deg bend 2.00 pc PVC Blue Tee, 50mm dia. 1.00 pc Stainless coupling 304, 50mm dia 3.00 pc Stainless coupling 304, 20mm dia 2.00 pc PVC Reducer Coupling, 75mm dia X 50mm dia 1.00 pc Gate Valve, 50mm dia 1.00 pc Hose Bibb, 20mm dia 1.00 pc PVC Solvent, 200cc 3.00 pc Stainless Steel Tank (304), 1.90 x 3.0 m (Vertical), includes platform ladder 1.00 pc Consumables 1.00 lot Labor 1 Foreman 8.00 days 2 Skilled Laborer 8.00 days 2 Laborer 8.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1102(18) Solar Panel with Inverter, Battery and Other Devices Quantity 1.00 l.s. Materials Hydbrid Inverter - 12KW 1.00 pc 15kWhigh Voltage LiFePo4 Battery 2.00 pc Smart Meter 1PH - LHE12DRR11001 1.00 pc GCL Solar Panel 620W NT12R/66GDF 20.00 pc MA Rail L2400 22.00 pc MA Mid Clamp 35mm 44.00 pc MA End Clamp 35mm 60.00 pc MA Ground Clamp 35mm 22.00 pc MA Lfoot 60.00 pc MA Splicer 44.00 pc PV Wire Twin Core 2*6mm 200.00 meter AC Wire THHN 30 mm2 60.00 meter AC Wire THHN 3.5 mm2 100.00 meter PV Connector MC4-6mm 12.00 pc DC MCB-63 2P 600V 20A 6.00 pc DC Surge Protection Device 2P 600V 20-40 Kpa 6.00 pc AC Surge Protection Device 2P 275V 20-40 Kpa 1.00 pc ATS (SQ3M-125/2 230V400V) 125A 2P 1.00 pc DC Combiner Box 225A with Joymell MCCB 1.00 pc AC MCB (SCB8-63 400V)2P 100A 2.00 pc Flexible HDPE "1" 40mm 200.00 meter Metal Enclosure Box (800*600*200) 1.00 pc Metal Ground Rod 3M 1.00 pc Cable tray Slotted 80x80 mm 4.00 pc Consumables and other hardwares 1.00 lot Labor 1 Foreman 12.00 days 10 Skilled Laborer 12.00 days 10 Laborer 12.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1106(1) CCTV System Quantity 1.00 l.s. Materials 4mp Full Color Camera 12.00 units 16CH NVR 1.00 pc 8TB Surveillance HDD 1.00 pc 24-Port Gigabit PoE Switch 1.00 pc 1500VA UPS 1.00 pc 43" 4K Smart TV/Monitor 1.00 pc CAT6 UTP Cable 6.00 boxes CCTV Cabinet, Patch Panel, Connectors, Junction Boxes, RJ45, Mounts & Accessories 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1202(6)a1 Fire Extinguisher (10 lbs ABC Dry Chemical) Quantity 4.00 set Materials 10 lbs Fire Extinguisher (ABC Dry Chemical with Wall Bracket) 4.00 set(s) Consumables (5% of Materials Cost) 1.00 lot Labor 1 Foreman 3.00 days 1 Skilled Laborer 3.00 days 1 Laborer 3.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot 1208(1) Fire Alarm System Quantity 1.00 L.s. Materials Fire Alarm Control Panel 1.00 set Manual Pull Switch 2.00 set Bell, Vibrating Type 2.00 set Equipment for Fire Alarm, Smoke Detector 4.00 pcs Consumables 1.00 lot Labor 1 Foreman 4.00 days 1 Skilled Laborer 4.00 days 1 Laborer 4.00 days Equipment 1 Minor Tools (10% of Labor Cost) 1.00 lot

Freshness: First saved / captured Oct 15, 2026, 3:22 AM; last database update Oct 15, 2026, 3:22 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.