PhilGEPS Registration
Known from stored extractionBidder must satisfy the stated PhilGEPS registration requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Buying agencySAN PABLO CITY WATER DISTRICT
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
This condition includes alternatives, combined thresholds, or detailed license terms that require checking in the official documents.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
REPUBLIC OF THE PHILIPPINES SAN PABLO CITY WATER DISTRICT Maharlika Highway, San Gabriel, San Pablo City Tel. No. (049) 562-9955 Invitation to Bid Contract No. 2026-230 Installation of 75mm.Ø Small Distribution Pipelines at Purok 6, Brgy. San Isidro, San Pablo City
Bidding is restricted to Filipino citizens/sole proprietorships, cooperatives, and partnerships or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines.
It may also be downloaded free of charge from the website of the Philippine Government Electronic Procurement System (PhilGEPS) and the website of the Procuring Entity, provided that bidders shall pay the applicable fee for the Bidding Documents not later than the submission of their bids.
ROXAINE LOURREST A. CARANDANG Head, BAC Secretariat San Pablo City Water District Maharlika Highway, Brgy. San Gabriel, San Pablo City 4000, Laguna, Philippines Laguna Trunkline: (049) 562-9955 loc. 124 or 125 or 128 Manila Line: (02) 8396-9550 loc. 124 or 125 or 128 Direct Line: (049) 503-0075 [email protected] Approved by: EFREN R. DELA PAZ Chairman, Bids and Awards Committee Noted by: AR. MICHAEL M. MANANSALA General Manager xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Checklist of Technical and Financial Documents I. TECHNICAL COMPONENT ENVELOPE a) PhilGEPS Certificate of Registration (Platinum Membership) in accordance with Section 20 of the IRR; b) PCAB License and Registration, in case of Joint Venture (JV); c) Statement of all its ongoing government and private contracts, including contracts awarded but not yet started, if any, whether similar or not similar in nature and complexity to the contract to be bid; d) Statement of the Bidder’s SLCC, in accordance with ITB Clause 5.5. The SLCC shall be supported by an Owner’s Certificate of Final Acceptance issued by the project owner other than the Contractor, or a final rating of at least satisfactory in the CPES, or a similar performance and monitoring system. In case of contracts with the private sector, an equivalent document shall be submitted; e) NFCC computation in accordance with ITB Clause 5.6; f) Joint Venture Agreement (JVA), if applicable; g) Bid Security in the prescribed form and amount in accordance with ITB Clause 16, and validity period under ITB Clause 15; h) Project Requirements, which shall include the following: i) Organizational chart of the personnel to be deployed for the procurement project to be bid; ii) List of Contractor’s personnel (e.g., Project Manager, Project Engineers, Materials Engineers, and Foremen), to be assigned to the procurement project to be bid, with their complete qualifications and experience data. These personnel must meet the required minimum years of experience set in the BDS; iii) List of Contractor’s major equipment units which are owned, leased, or under purchase agreements, supported by proof of ownership or certification of availability of equipment from the equipment lessor or vendor for the duration of the project, as the case may be, which must meet the minimum requirements for the contract set in the BDS; and iv) Omnibus Sworn Statement in accordance with Section 54.3 of the IRR. II. FINANCIAL COMPONENT ENVELOPE a) Bid Form which includes the Bid prices and Bill of Quantities; xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx SAN PABLO CITY WATER DISTRICT San Pablo City WORK ORDER W.O. No. Project Classification: Date DISTRIBUTION LINES Title: PROPOSED INSTALLATION OF 75MM Ø SMALL DISRIBUTION PIPELINES AT PUROK 6 BRGY. SAN ISIDRO, SAN PABLO CITY Description of Work Location of Work Proposed installation of 75mm Ø PVC Pipelines with Brgy. San Isidro an estimated length of 1, 265.00 LM. San Pablo City Starting Date : Upon approval Schedule Completion: 30 working days Date Completed: Final Completion: Justification Work Breakdown 1 Demolition 2 Excavation 3 Concrete demolition As per Extension of Service Distribution Line 4 Pipelaying 5 Boring Works 6 Interconnection 7 Concrete Thrust Blocking 8 Backfilling. 9 Construction of Bridge Crossing 10 Flushing and Disinfection 11 Restoration 12 Demolition/Clean-up Sketch of Work to be done Project Cost Particulars: Materials P1,297,171.00 See Attached Plan Labor P565,500.00 Overhead Cost P810,610.18 Total Project Cost.: P2,673,281.18 Manner of undertaking the project Action taken by the General Manager By Administration Approved Reason for disapproval/deferred: By Contractor Disapproved Joint Deferred Prepared by: Checked by: Reviewed by: ENGR. HAZEL S. GERONIMO ARCH. MARIO A. BONDAD ENGR. LAZARO FERDINAN S. ABRIGO Acting Division Manager A, EWRD Division Manager A, ED Department Manager A, TSD Reviewed by: Budget checked by: Pre-Audited by: ENGR. ALVIN A. SANTIAGO ROMMEL B. DE LUNA DEOGRACIAS M. REYES Department Manager A, OD Division Manager A , T and B Senior Internal Control Officer A Recommended for Approval by: Approved by: ENGR. DIOSDADO A. BIGLETE ARCH. MICHAEL M. MANANSALA Assistant General Manager A, Technical General Manager A xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx San Pablo City Water District San Pablo City PROPOSED INSTALLATION OF 75MM Ø SMALL DISRIBUTION PIPELINES AT PUROK 6, BRGY. SAN ISIDRO, SAN PABLO CITY No. Work Items Quantity Unit Unit Cost Amount 1 Interconnection at existing 150mm Ø pipelines CI Split Tee 6"Ø x 3"Ø (M/F) 1 pc. 25,000.00 Gate Valve 3"Ø (F/F) 1 pc. 9,000.00 Gate Valve 6"Ø (M/M) Isolation Valve 1 pc. 18,000.00 Flange Adaptor 3"Ø 1 pc. 4,000.00 Sub-Total 56,000.00 2 Pipelines PVC Pipe 3"Ø x 6.0m 209 L 3,800.00 PVC Elbow 3"Ø x 45° 7 pcs. 3,500.00 PVC Elbow 3"Ø x 22 1/2° 5 pcs. 3,500.00 Gate Valve 3"Ø (F/F) 1 pc. 9,000.00 Flange Adaptor 3"Ø 1 pc. 4,000.00 CI Blind Flange 3"Ø 1 pc. 1,000.00 Sub-Total 850,200.00 3 Fire Hydrant/BOV (1) CI Tee 3"Ø x 3"Ø (F/F) 1 pc. 7,000.00 CI. Gate Valve 3"Ø (F/F) 1 pc. 9,000.00 Steel Ring Flange 3"Ø 1 pc. 1,500.00 GI Pipe 2 ½"Ø S-40 ( 6mm thick) 1 L 10,000.00 Brass Gate Valve 2 ½"Ø 1 pc. 7,500.00 GI. Elbow 2 ½"Ø x 90° ( 13mm thick) 1 pc. 550.00 GI St. Elbow 2 ½"Ø x 90° ( 13mm thick) 1 pc. 550.00 GI. Solid Plug 2 ½"Ø 1 pc. 400.00 Sub-Total 36,500.00 4 Pipe Crossing GI Pipe 3"Ø S-40 ( 6mm thick) 3 L 15,000.00 Flange Adaptor 3"Ø 2 pcs. 4,000.00 Gate Valve 3"Ø (F/F) 2 pcs. 9,000.00 Gate Valve 2"Ø (F/F) 1 pc. 6,000.00 CI Tee 3"Ø x 2"Ø (F/F) 1 pc. 4,500.00 Steel Ring Flange 3"Ø 2 pcs. 1,500.00 Steel Ring Flange 2"Ø 1 pc. 600.00 Sleeve Type Coupling 3"Ø 2 pcs. 3,500.00 Air Release Valve 2"Ø ( Threaded Type) 1 pc 23,000.00 Cement 22 bags 265.00 Sand ( S-1) 1.5 cum 2,100.00 Gravel 3/4" 3.5 cum 2,100.00 12mm Ø Deformed Bar 15 pcs. 245.00 10mm Ø Deformed Bar 12 pcs. 170.00 Flat Bar 2" 1 pc 185.00 Tire Wire #14 10 kg. 80.00 3/4" x 4' x 8' Pinoly Plywood 6 pcs. 800.00 2" x 3" x 10' Coco Lumber 16 pcs. 110.00 2" x 2" x 10' Coco Lumber 12 pcs. 73.00 CWN # 2 2 kl 90.00 CWN # 3 3 kls 90.00 Sub-Total 146,016.00 5 Restoration Works For Restoration of Interconnection works/ End points with FH /thrust block (1 .5m x 1.5 m t= 6 inches): Cement 18 bags 265.00 Sand S-1 1 cu.m 2,100.00 Gravel 3/4 2 cu.m 2,100.00 For Restoration of pavement (50m x 0.5m t= 6 inches) : Cement 35 bags 265.00 Sand S-1 2 cu.m 2,100.00 Gravel 3/4 4 cu.m 2,100.00 Sand Bedding (1254m x 0.5m t=4 inches) : Sand S-1 63 cu.m 2,100.00 Base-Course (50m x 0.5m t=4 inches) and for FH concrete pad: Gravel 3/4 4 cu.m 2,100.00 Grouted Riprap Works approximately 4sqm or 1.20cum riprap with 100mm to 150mm size: Cement 6 bags 265.00 Sand 0.5 cu.m 2,100.00 Stone size (4" - 6") 1.2 cu.m 2,000.00 178,685.00 6 Miscellaneous Hacksaw Blade 6 pcs. 115.00 Marpak Grease 20 cans 120.00 Welding Rod 25 kg. 130.00 Bolts and Nuts 5/8" x 3" 60 pcs. 80.00 Bolts and Nuts 5/8" x 6" 10 pcs. 120.00 Valve Box Cover 4 pcs. 1,800.00 Neolite Rubber 3 sq.m 1,000.00 Cotton Thread 1 roll 230.00 PVC Pipe 150mm.Ø x 6.0m (soil pipe) 1 L 7,000.00 Sub-Total 29,770.00 Total Amount P1,297,171.00 LABOR COST Description No. Rate / day No. of Days Total Foreman 1 1,500.00 30 45,000.00 Skilled Pipe Fitter 1 1,350.00 30 40,500.00 Skilled (Boring Works- 1 team) 6 1,000.00 6 36,000.00 Operator ( Jackhammer/ Concrete Cutting) 3 1,000.00 6 18,000.00 Mason ( Restoration/Bridge Crossing Works- 2 teams) 8 1,000.00 12 96,000.00 Welder 2 1,000.00 6 12,000.00 Driver 1 600.00 30 18,000.00 Unskilled(Pipelaying) 16 600.00 20 192,000.00 Unskilled (Helper-hauling/demolition/hydrotesting/restoration) 6 600.00 30 108,000.00 P565,500.00 Total Direct Cost ( Materials and Labor) P1,862,671.00 OVERHEAD COST Hydrotesting Fee Sec 20 ( 1,265m x 15.00) 18,975.00 (see Section # 9 of the Term and Reference(TOR) for the condition on water use.) Temporary Facilities ( 1.5% of Direct Cost) 27,940.07 Mobilization and Demobilization ( 3% of Direct Cost) 55,880.13 Equipment Cost/Rentals ( 10% of Direct Cost) 186,267.10 Unforeseen / Contingencies (5% labor + 5% material cost) 93,133.55 Health and Safety Provision ( 1% of Direct Cost) 18,626.71 Profit ( 10% of Direct Cost) 186,267.10 Tax ( 12% of Direct Cost) 223,520.52 Total Amount P810,610.18 TOTAL PROJECT COST P2,673,281.18 Prepared by: Checked by: ENGR. HAZEL S. GERONIMO ARCH. MARIO A. BONDAD Acting Division Manager A, EWRD Division Manager A, ED Reviewed by: ENGR. LAZARO FERDINAN S. ABRIGO ENGR. ALVIN A. SANTIAGO Department Manager A,TSD Department Manager A,OD Recommended for Approval by: Approved by: ENGR. DIOSDADO A. BIGLETE ARCH. MICHAEL M. MANANSALA Assistant General Manager A, Technical General Manager A xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx San Pablo City Water District San Pablo City PROPOSED INSTALLATION OF 75MM Ø SMALL DISRIBUTION PIPELINES AT PUROK 6, BRGY. SAN ISIDRO, SAN PABLO CITY WORK SCHEDULE No. ACTIVITIES Days 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 1 Mobilization 2 Excavation 3 Concrete Demolition 4 Pipelaying 5 Boring 6 Interconnection Interconnection Works 7 Concrete Thrust Blocking. 8 Backfilling 9 Construction of Bridge Crossing 10 Flushing and Disinfection 11 Restoration 12 Demolition/Clean-Up Prepared by: Checked by: Reviewed by: Recommended for Approval by: Approved by: ENGR. HAZEL S. GERONIMO ARCH. MARIO A. BONDAD ENGR. LAZARO FERDINAN S. ABRIGO ENGR. ALVIN A. SANTIAGO ENGR. DIOSDADO A. BIGLETE ARCH. MICHAEL M.MANANSALA Acting Division Manager A, EWRD Division Manager A, ED Department Manager A, TSD Department Manager A, OD Assistant General Manager A, Technical General Manager A xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx SAN PABLO CITY WATER DISTRICT San Pablo City PROPOSED INSTALLATION OF 75 MM Ø DISTRIBUTION PIPELINES AT PUROK 6 , BRGY. SAN ISIDRO, SAN PABLO CITY TECHNICAL SPECIFICATIONS A PROJECT SPECIFICATIONS 1 EARTHWORKS EXCAVATION 1.1 Excavation shall include the removal of materials that would interfere with the proper execution and completion of the work. The removal of said materials shall conform to the width and depth as shown in the drawings. 1.2 Contractors shall provide and maintain all supports and shoring that may be deemed necessary. 1.3 The walls and faces of all excavations in which workers are exposed to danger from unstable ground shall be guarded against by shoring system, sloping of the excavation or other method. 1.4 All excess excavated materials shall be removed and disposed at designated site. 2 BACKFILL 2.1 Materials to be used for backfill shall be selected materials free from grass roots, bush or other vegetation or rocks having maximum dimension larger than 100 mm. 2.2 Pipeline trenches backfills shall be placed in layers not exceeding 150 mm in thickness and each layer shall be thoroughly compacted. 2.3 A sand bedding with a thickness of 4 inches shall be laid before the installation of the pipe. 3 PIPING 3.1 The depth of the proposed pipelines will depend on the elevation, alignment, and location of the existing pipelines to be interconnected, ensuring proper connection and compliance with the engineering standards. 3.2 All pipes fittings, closure pieces, support, bolts and nuts, gaskets, jointing, materials and appurtenances shall be formed and installed. 3.3 All bolts, nuts and studs in the assembly of piping shall conform with the requirements as specified. 3.4 All exposed piping shall be adequately supported with devices of appropriate design. 3.5 All pipes and fittings shall be installed by duly certified TESDA pipe fitters with corresponding certification. 3.6 Thrust blocks in piping should be observed, specially at every joint and interconnection point, to ensure the stability of the pipe when subjected to high pressure. 4 SURFACE RESTORATION 4.1 All pavement, shrubberies, fences, poles or other property that were damaged shall restored to its original conditions. 4.2 A gravel bedding with a thickness of 4 inches shall be laid before the pouring of concrete mortar. 5 DISTRIBUTION PIPELINES 5.1 Pipelines Supply and Installation of uPVC Pipe 75 mm (6") Ø x 6.0m Series 8 (C-150) Fixed seal Nominal Size: 3 inches (75mm) Nominal Outside Diameter: 90 mm Minimum Wall Thickness: 5.2 mm Maximum Wall Thickness: 5.8 mm Effective Length of Pipes: 6 m (6000 mm) Supply and Installation of uPVC 75 mm (3") Ø Elbow 45⁰ long Nominal Size: 3 inches (75 mm) Nominal Outside Diameter: 90mm Minimum Wall Thickness: 5.2 mm Maximum Wall Thickness: 5.8 mm Supply and Installation of uPVC 75 mm (3") Ø Elbow 22.5⁰ long Nominal Size: 3 inches (75 mm) Nominal Outside Diameter: 90mm Minimum Wall Thickness: 5.2 mm Maximum Wall Thickness: 5.8 mm 5.2 Gate Valves Gate Valve 75mmØ (F/F)
pressure bearing parts.
Low Torque
6 CEMENT Cement shall conform with the "Standard Specifications for Portland Cement" (ASTM-C-150 latest revision). B PCAB LICENSE Valid PCAB License - General Engineering -4 ( Water Supply), Category C D WORK DURATION Forty Five (45) Working Days. Prepared by: Reviewed and Evaluated by: Engr. HAZEL S. GERONIMO Arch. MARIO A. BONDAD Acting Division Manager A, EWRD Division Manager A, ED Reviewed by: Engr. LAZARO FERDINAN S. ABRIGO Engr. ALVIN A. SANTIAGO Department Manager A, TSD Department Manager A, OD Recommended for Approval by: Approved by: Engr. DIOSDADO A. BIGLETE Arch. MICHAEL M. MANANSALA Assistant General Manager A, Technical General Manager A xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Republic of the Philippines SAN PABLO CITY WATER DISTRICT Maharlika Highway, San Gabriel, San Pablo City Tel. Nos.: (049) 562 9955 Fax No.: (049) 562 2751 TERMS OF REFERENCE (TOR) Project Title: Request for Approval of the Proposed Installation of 75mmØ Small Distribution Pipelines at Purok 6, Brgy. San Isidro,San Pablo City
The proposed installation of 75 mm Ø (3”) distribution pipelines in Brgy. San Isidro will benefit approximately 175 households in the area. The project will extend the service area of SPCWD, providing residents with improved access to a reliable and potable water supply. The installation of the proposed pipelines will also support additional service connections, allowing more households to be served by SPCWD and contributing to increased revenue for the district. Furthermore, the project will improve water distribution within the area and help address the existing water supply needs of the affected residents. Based on the project evaluation, the proposed installation has an estimated payback period of 36.51 months, or approximately 3 years, making it beneficial to the residents while also demonstrating financial viability for the district.
reliability.
-The Contractor shall undertake all works necessary for the completion of the project, including but not limited to the following:
Including welding works
-Changes in Interconnection and return of Materials
The Contractor shall complete the works within forty-five (45) working days from receipt of the Notice to Proceed (NTP).
The Approved Budget for the Contract is ₱ 2,673,281.18 inclusive of direct costs, indirect costs, overhead, profit, taxes, and contingencies.
Contractor
-Facilitate barangay permits and right-of-way clearances (if applicable).
Install proper barricades around the work area. Provide appropriate signboards and warning signs for public and worker safety. Ensure all helpers/workers wear the required uniform, safety helmets and safety shoes at all times while working.
Roads and concrete pavements Perimeter fence and other structures Concrete access to concessionaire’s houses Other affected properties
SPCWD
All supplied materials shall be brand new and covered by a warranty of at least one (1) year. The Contractor shall also warrant the quality of workmanship for a minimum period of one (1) year from the date of final inspection and acceptance of the project.
Fifteen percent (15%) of the total contract amount shall be released upon mobilization, subject to the submission and approval of the required mobilization documents.
Progress billings shall be processed based on the actual work accomplished, upon submission of a duly verified Accomplishment Report, supporting documents, and inspection certification by the authorized representative. Note: Pipelaying works shall be considered for payment under progress billing only after the completed section has successfully passed the required hydrostatic pressure and leakage test.
Ten percent (10%) of the total contract amount shall be deducted from each progress billing as retention money. The retained amount shall be released one (1) year after the final inspection and acceptance of the project, provided that no defects are noted during the warranty period.
Prepared by: ENGR. HAZEL S. GERONIMO Acting Division Manager A, EWRD Checked by: ARCH. MARIO A. BONDAD Division Manager A, ED Reviewed by: ENGR. LAZARO FERDINAN S. ABRIGO Department Manager, TSD ENGR. ALVIN A. SANTIAGO Department Manager A, OD Recommended for Approval by: ENGR. DIOSDADO A. BIGLETE Assistant General Manager A, Technical Approved by: ARCH. MICHAEL M. MANANSALA General Manager A Pre-bid Conference Date Time Venue 22/10/2026 2:00 PM SPCWD - RTC Created by Roxaine Lourrest A. Carandang Date Created 14/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Bidder must satisfy the stated PhilGEPS registration requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Bidder must satisfy the stated Filipino ownership or reciprocity requirement.
This condition includes alternatives, combined thresholds, or detailed license terms that require checking in the official documents.
Bidder must satisfy the stated PCAB licensing requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Bidder must satisfy the stated Single Largest Completed Contract requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Bidder must satisfy the stated similar-contract experience requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Bidder must satisfy the stated Net Financial Contracting Capacity requirement.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Bid Security is required in an acceptable form and amount.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 15, 2026, 12:00 AM
Nov 3, 2026, 2:00 PM
3 days leftOct 15, 2026, 3:29 AM
Oct 15, 2026, 3:29 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 15, 2026, 3:29 AM; last database update Oct 15, 2026, 3:29 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.