PCAB License
Needs verificationBidder must satisfy the stated PCAB licensing requirement.
The stored source condition is incomplete or ambiguous. Verify the complete official wording.
Buying agencyMUNICIPALITY OF TUBOD, LANAO DEL NORTE
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
The stored source condition is incomplete or ambiguous. Verify the complete official wording.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
INVITATION TO BID CONTRACT OF MATERIALS AND LABOR FOR THE CONSTRUCTION OF EMERGENCY RESPONSE ADMINISTRATIVE, COMMUNICATION AND LOGISTICS CENTER AT TUBOD COLLEGE Purok 5A Poblacion, Tubod, Lanao del Norte (ITB-2026-VPP-099) Approved Budget for the Contract: Php 646,309.10 The Municipality of Tubod, Lanao del Norte, through its Bids and Awards Committee (BAC), invites contractors registered with and classified by the Philippine Contractors Accreditation Board (PCAB) to apply for eligibility and if found eligible, to bid for the hereunder contract: Name of Project : Contract of Materials and Labor for the Construction of Emergency Response Administrative, Communication and Logistics Center at Tubod College Location : Purok 5A Poblacion, Tubod, Lanao del Norte Source of Fund : Calamity Fund Procurement Mode : Public Bidding Contract Duration : Thirty-Three (33) Calendar Days Brief Description : Contract of Materials and Labor for the Construction of Emergency Response Administrative, Communication and Logistics Center at Tubod College Scope of Work: Item No. Description B.5 Project Billboard/Signboard 414 (1) Forms and Falseworks 404(1)a Reinforcing Steel 405 Structural Concrete (Class A) 1046 Masonry Works 1003 Carpentry and Joinery Works (Cladding & Ceiling) 1010(2)b Wooden Doors 1008(1)a Aluminum Glass Windows 1018 Ceramic/Granite Tiles 1032 Painting Works 1100 Electrical Conduits, Boxes & Fittings 1101 Wires and Wiring Devices The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary “pass/fail criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-qualification and Award of contract shall be governed by the pertinent provisions of R.A. 9184 and it’s implementing Rules and Regulations (IRR). The complete schedule of activities is listed, as follows: Activities Schedule
BAC Office, 2nd Floor MDRRMO New Building
Operation Center 2nd Floor MDRRMO New Bldg., Tubod, Lanao del Norte
Opening of Bids & Eligibility Check) November 5, 2026 @ 1:00 P.M. Operation Center 2nd Floor MDRRMO New Bldg., Tubod, Lanao del Norte
Operation Center 2nd Floor MDRRMO New Bldg., Tubod, Lanao del Norte
Operation Center 2nd Floor MDRRMO New Bldg., Tubod, Lanao del Norte
Award November 11 and 12, 2026 All bids shall be accompanied by a bid security. The bid security shall be in an amount equal to a percentage of the ABC in accordance with the following schedule: Form of Bid Security Amount of Bid Security (Equal to Percentage of the ABC) a) Cash, cashier’s/manager’s check issued by a Universal or Commercial Bank Two percent (2%) b) Bank draft/guarantee or irrevocable letter of credit issued by a Universal or Commercial Bank: Provided, however, that it shall be confirmed or authenticated by a Universal or Commercial Bank, if issued by a foreign bank. c. Surety Bond callable upon demand issued by a surety or insurance company duly certified by the Insurance Commission as authorized to issue such security. Five percent (5%) d. Any combination of the foregoing Proportionate to share of form with respect to total amount of security. Bidders may also submit bid securities in the form of cashier’s/manager’s check, bank draft/guarantee, or irrevocable letter of credit from other banks certified by the BSP as authorized to issue such financial instrument. In lieu of a bid security, the bidder may submit a Bid Securing Declaration. Bid Documents will be available only to prospective bidders upon payment of a non–refundable amount of ONE THOUSAND PESOS ONLY (Php 1,000.00) at the Office of the Municipal Treasurer, Tubod, Lanao del Norte. The Municipality of Tubod, Lanao del Norte assumes no responsibility whatsoever to compensate or indemnify bidders for any expenses incurred in the preparation of the bid. LGU – Tubod Bids and Awards Committee C/O Mrs. Nerilyn C. Gonato BAC Secretariat Cellphone No. 0963-459-0974 Approved by: VICMAR P. PALOMA BAC Chairperson Pre-bid Conference Date Time Venue 22/10/2026 1:00 PM BAC Office Operation Center, 2nd Floor MDRRMO New Building, Marcelino Pepito St., Poblacion, Tubod, Lanao del Norte Created by Vicmar P. Paloma Date Created 15/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Bidder must satisfy the stated PCAB licensing requirement.
The stored source condition is incomplete or ambiguous. Verify the complete official wording.
Bid Security is required in an acceptable form and amount.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 16, 2026, 12:00 AM
Nov 5, 2026, 1:00 PM
5 days leftOct 16, 2026, 12:50 AM
Oct 16, 2026, 12:50 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 16, 2026, 12:50 AM; last database update Oct 16, 2026, 12:50 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.