Construction ProjectsOpen · stored

IMPROVEMENT OF POST HARVEST FACILITY - BITONG, GALIMUYOD, ILOCOS SUR

Buying agencyMUNICIPALITY OF GALIMUYOD, ILOCOS SUR

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱1,995,915.10
Time remaining6 days leftDeadline Nov 6, 2026, 12:00 PM
Company screeningCompany screening has not been run for this bid.
Main thing to check
No active requirements are storedNeeds verification
Why this matters

The complete eligibility conditions must be checked in the official bidding documents.

Next action
Review official notice

Use the supporting sections below to verify the evidence.

Reference 13294021

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Construction Projects

Removal of Structures and Obstruction 1.00 l.s. Structure Excavation (common soil) 2.30 cu.m. Embankment from Structure Excavation 0.74 cu.m. Embankment from Common Borrow by Equipment 0.92 cu.m. Gravel Bedding 15.93 cu.m. Structural Concrete for Footing, Footing Tie Beam, Column, Suspended Slab, Girder/Beam (Class A, 28days) 1.02 cu.m. Structural Concrete on Slab on Fill (2500 psi, 28days) 15.67 cu.m. Reinforcing Steel Bar, G40 625.08 kg Formworks & Falseworks 3.36 sq.m. Cement Plaster Finish 3.68 sq.m. Painting Works (metal Painting) 518.46 sq.m. 150mm CHB Non-Load Bearing (including Reinforcing Steel) 3.68 sq.m. Prepainted Rib Type Metal Sheets (long span, 0.05mm thk) 211.27 sq.m. Fabricated Metal Roofing Accessory (Flashing) 53.00 m. Fabricated Metal Roofing Accessory (Gutter) 21.00 m. Structural Steel Purlins 1041.00 kg Structural Steel Trusses 5909.00 kg Metal Structure Accessories (Steel Plates) 45.00 kg Metal Structure Accessories (Bolts and Rods) 24.00 kg Metal Structure Accessories (Sagrods) 69.00 kg Metal Structure Accessories (Cross Bracing) 104.00 kg Metal Structure Accessories (Turnbuckle) 10.00 pc Electrical Works 1.00 lot Plumbing Works 1.00 l.s Scaffoldings 1.00 l.s Construction Safety & Health Program 45.00 days Project Billboard 64.00 sq.ft. Other Information Bidding Date - November 6, 2026, 2:00PM at the BAC Conference Hall, Galimuyod, Ilocos Sur Created by Abner Escobar Guilambo Date Created 16/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

No active requirements are stored.

Review the official notice and bidding documents for the complete requirements.

Stored timeline

Important dates

Published · Manila

Oct 19, 2026, 12:00 AM

Deadline · Manila

Nov 6, 2026, 12:00 PM

6 days left
First saved / captured

Oct 19, 2026, 4:53 AM

Last database update

Oct 19, 2026, 4:53 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13294021
Original stored title
IMPROVEMENT OF POST HARVEST FACILITY - BITONG, GALIMUYOD, ILOCOS SUR
Original buying agency
MUNICIPALITY OF GALIMUYOD, ILOCOS SUR
Stored status
active
View original stored description
Removal of Structures and Obstruction 1.00 l.s. Structure Excavation (common soil) 2.30 cu.m. Embankment from Structure Excavation 0.74 cu.m. Embankment from Common Borrow by Equipment 0.92 cu.m. Gravel Bedding 15.93 cu.m. Structural Concrete for Footing, Footing Tie Beam, Column, Suspended Slab, Girder/Beam (Class A, 28days) 1.02 cu.m. Structural Concrete on Slab on Fill (2500 psi, 28days) 15.67 cu.m. Reinforcing Steel Bar, G40 625.08 kg Formworks & Falseworks 3.36 sq.m. Cement Plaster Finish 3.68 sq.m. Painting Works (metal Painting) 518.46 sq.m. 150mm CHB Non-Load Bearing (including Reinforcing Steel) 3.68 sq.m. Prepainted Rib Type Metal Sheets (long span, 0.05mm thk) 211.27 sq.m. Fabricated Metal Roofing Accessory (Flashing) 53.00 m. Fabricated Metal Roofing Accessory (Gutter) 21.00 m. Structural Steel Purlins 1041.00 kg Structural Steel Trusses 5909.00 kg Metal Structure Accessories (Steel Plates) 45.00 kg Metal Structure Accessories (Bolts and Rods) 24.00 kg Metal Structure Accessories (Sagrods) 69.00 kg Metal Structure Accessories (Cross Bracing) 104.00 kg Metal Structure Accessories (Turnbuckle) 10.00 pc Electrical Works 1.00 lot Plumbing Works 1.00 l.s Scaffoldings 1.00 l.s Construction Safety & Health Program 45.00 days Project Billboard 64.00 sq.ft. Other Information Bidding Date - November 6, 2026, 2:00PM at the BAC Conference Hall, Galimuyod, Ilocos Sur Created by Abner Escobar Guilambo Date Created 16/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Freshness: First saved / captured Oct 19, 2026, 4:53 AM; last database update Oct 19, 2026, 4:53 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.