Electrical Systems and Lighting ComponentsOpen · stored

PROCUREMENT & INSTALLATION OF SOLAR PANELS (CASTILLEJOS SUPER HEALTH CENTER ON-GRID PV SYSTEM CONFIGURATION)

Buying agencyMUNICIPALITY OF CASTILLEJOS, ZAMBALES

Bid Brief

Is this bid worth a closer look?

Stored notice data. Confirm all decisions with the official documents.

Open · storedCompany screening · Not checked
Approved budget₱5,174,782.20
Time remaining10 days leftDeadline Nov 10, 2026, 9:00 AM
Company screeningCompany screening has not been run for this bid.
Main thing to check
Company screening is not checkedCheck status
Why this matters

Relevance does not establish whether your company meets the bid requirements.

Next action
Check my company

Use the supporting sections below to verify the evidence.

Reference 13295085

Decision support

Company Screening

Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.

How screening states work
GO No known blocker foundREVIEW More information requiredNO-GO Known conflict

Checking the stored deadline…

Not checked yet

Add only the evidence relevant to this bid, or screen with unknown answers.

Open full Your Company profile

Not assessed yet

Source-backed scope

What they’re buying

Stored category: Electrical Systems and Lighting Components

SPECS OF DESCRIPTION UNIT QUANTITY ITEM NO. PART I MATERIALS a. PV Solar 580W Modules, Monocrystalline, High Efficiency pcs 108 b. 10kW Single Phase On-Grod Inverter pcs 6 c. Rapid Shutdown Device pcs 2 d. Solar Distribution Panel (NEMA 3R Enclosure) with 1-100 AT, 1P Main and 3-50AT, 1P Branches lot 2 e. Intermediate Metal Conduit pcs 40 f. Intermediate Metal Conduit Elbow pcs 8 g. Gutter 6m x 150mm x 200mm pcs 2 h. Pull box 3m x 300mm x 100mm pcs 20 i. Fittings and Supporting Materials lot 2 j. Surge Protecting Device, 1P sets 6 k. Watt-meter DC, 1PH sets 2 l. PV Cable 4/6 sq.mm m 200 m. Panel Board (Surface Mounted) 1-100AT, 3P; 6-20AT, 2P; 6-15AT, 2P lot 2 n. 200 sq.mm. THW Copper Wire m 40 o. 80.00 sq.mm. THW Copper Wire m 40 p. 8.00 sq.mm. THW Copper Wire m 300 q. 50mm Dia. PVC Conduit pcs 50 PART II LABOR COST a. Electrical Engineer (1) days 50 b. Skilled Worker/ Electrician (10) days 50 c. Labor / Helper (10) days 50 d. Driver (3) days 50 PART III EQUIPMENT a. Impact Wrench days 50 b. Boom Truck days 50 PART IV TOTAL DIRECT COST PART V OVERHEAD COST (12% OF IV) PART VI CONTRACTOR'S PROFIT (8% OF IV) PART VII VALUE ADDED TAX (5% OF IV, V, VI) Pre-bid Conference Date Time Venue 27/10/2026 9:00 AM BAC OFFICE, MUNICIPALITY OF CASTILLEJOS, ZAMBALES Created by Amelia P. Santos Date Created 19/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.

Extracted from the stored notice

Key requirements

These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.

Submission & process

Pre-Bid Conference

Known from stored extraction

Required in stored extraction

A specific pre-bid conference is identified in the procurement notice.

This means the requirement is present in the stored extraction. It does not mean your company satisfies it.

Stored timeline

Important dates

Published · Manila

Oct 20, 2026, 12:00 AM

Deadline · Manila

Nov 10, 2026, 9:00 AM

10 days left
First saved / captured

Oct 20, 2026, 1:26 AM

Last database update

Oct 20, 2026, 1:26 AM

These are stored timestamps. A missing pre-bid or other procurement date is not shown.

Source and provenance

Official source

Open the stored PhilGEPS source link

Original reference
13295085
Original stored title
PROCUREMENT & INSTALLATION OF SOLAR PANELS (CASTILLEJOS SUPER HEALTH CENTER ON-GRID PV SYSTEM CONFIGURATION)
Original buying agency
MUNICIPALITY OF CASTILLEJOS, ZAMBALES
Stored status
active
View original stored description
SPECS OF DESCRIPTION UNIT QUANTITY ITEM NO. PART I MATERIALS a. PV Solar 580W Modules, Monocrystalline, High Efficiency pcs 108 b. 10kW Single Phase On-Grod Inverter pcs 6 c. Rapid Shutdown Device pcs 2 d. Solar Distribution Panel (NEMA 3R Enclosure) with 1-100 AT, 1P Main and 3-50AT, 1P Branches lot 2 e. Intermediate Metal Conduit pcs 40 f. Intermediate Metal Conduit Elbow pcs 8 g. Gutter 6m x 150mm x 200mm pcs 2 h. Pull box 3m x 300mm x 100mm pcs 20 i. Fittings and Supporting Materials lot 2 j. Surge Protecting Device, 1P sets 6 k. Watt-meter DC, 1PH sets 2 l. PV Cable 4/6 sq.mm m 200 m. Panel Board (Surface Mounted) 1-100AT, 3P; 6-20AT, 2P; 6-15AT, 2P lot 2 n. 200 sq.mm. THW Copper Wire m 40 o. 80.00 sq.mm. THW Copper Wire m 40 p. 8.00 sq.mm. THW Copper Wire m 300 q. 50mm Dia. PVC Conduit pcs 50 PART II LABOR COST a. Electrical Engineer (1) days 50 b. Skilled Worker/ Electrician (10) days 50 c. Labor / Helper (10) days 50 d. Driver (3) days 50 PART III EQUIPMENT a. Impact Wrench days 50 b. Boom Truck days 50 PART IV TOTAL DIRECT COST PART V OVERHEAD COST (12% OF IV) PART VI CONTRACTOR'S PROFIT (8% OF IV) PART VII VALUE ADDED TAX (5% OF IV, V, VI) Pre-bid Conference Date Time Venue 27/10/2026 9:00 AM BAC OFFICE, MUNICIPALITY OF CASTILLEJOS, ZAMBALES Created by Amelia P. Santos Date Created 19/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. ©&nbsp2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap

Freshness: First saved / captured Oct 20, 2026, 1:26 AM; last database update Oct 20, 2026, 1:26 AM.

New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.

BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.