Pre-Bid Conference
Known from stored extractionA specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Buying agencyMUNICIPALITY OF CASTILLEJOS, ZAMBALES
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
Relevance does not establish whether your company meets the bid requirements.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Electrical Systems and Lighting Components
SPECS OF DESCRIPTION UNIT QUANTITY ITEM NO. PART I MATERIALS a. PV Solar 580W Modules, Monocrystalline, High Efficiency pcs 40 b. 10kW Single Phase On-Grod Inverter pcs 2 c. Rapid Shutdown Device pcs 2 d. Solar Distribution Panel (NEMA 3R Enclosure) with 1-100 AT, 1P Main and 3-50AT, 1P Branches lot 1 e. Intermediate Metal Conduit pcs 44 f. Intermediate Metal Conduit Elbow pcs 4 g. Gutter 6m x 150mm x 200mm pc 1 h. Pull box 3m x 300mm x 100mm pcs 10 i. Fittings and Supporting Materials lot 1 j. Surge Protecting Device, 1P set 2 k. Watt-meter DC, 1PH set 1 l. PV Cable 4/6 sq.mm m 100 m. Panel Board (Surface Mounted) 1-100AT, 3P; 6-20AT, 2P; 6-15AT, 2P lot 1 n. 38.00 sq.mm. THW Copper Wire m 20 o. 8.00 sq.mm. THW Copper Wire m 50 p. 50mm Dia. PVC Conduit pcs 20 q. GI Sheet Roof Mounting Solution sets 40 PART II LABOR COST a. Electrical Engineer (1) days 15 b. Skilled Worker/ Electrician (10) days 15 c. Labor / Helper (10) days 15 d. Driver (3) days 15 PART III EQUIPMENT a. Impact Wrench days 15 b. Boom Truck days 15 PART IV TOTAL DIRECT COST PART V OVERHEAD COST (12% OF IV) PART VI CONTRACTOR'S PROFIT (8% OF IV) PART VII VALUE ADDED TAX (5% OF IV, V, VI) Pre-bid Conference Date Time Venue 27/10/2026 9:00 AM BAC OFFICE, MUNICIPALITY OF CASTILLEJOS, ZAMBALES Created by Amelia P. Santos Date Created 19/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 20, 2026, 12:00 AM
Nov 10, 2026, 9:00 AM
10 days leftOct 20, 2026, 1:26 AM
Oct 20, 2026, 1:26 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 20, 2026, 1:26 AM; last database update Oct 20, 2026, 1:26 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.