Stored category: Industrial Machinery and Equipment
Item Specification Statement of Compliance “Comply” or “Not Comply” A. General Specification:
Scope
a. The scope of work is to supply, deliver, install and commission two (2) sets of brand-new variable frequency drive motor controller. b. Commissioning of motor controller and accessories including miscellaneous equipment shall be borne entirely by the supplier.
Conditions
a. The scope of work is to supply, deliver, install and commission two (2) sets of brand-new variable frequency drive motor controller and its related accessories to CKWD. The motor controller unit and accessories shall be brand-new, at most three years ex-stock. b. The supplier shall be responsible for the proper installation of the supplied motor controller unit. c. The supplier shall commission the motor controller unit within forty-five (45) days after signing of Contract/ Purchase Order (PO). The 15-day time frame shall be allotted in order to check the proper setting of the motor controller unit and make necessary corrections of both mechanical and electrical failures found during installation and construction. The supplier shall inform the CKWD measures and proper procedures on the unit’s operation to guarantee a smooth and proper function of the newly-installed unit. d. Field-testing shall be made once the mounted equipment is ready for operation and when both the CKWD and supplier have finished their scopes of work on the installed unit. CKWD engineers shall conduct field testing with the presence of supplier’s representative at CKWD Pump and Motors Testing Facility. Supplier must train the CKWD representative on the operation and configuration of the equipment. e. In case the unit failed during field testing, the supplier shall make necessary corrections, repair or replace the unit without cost to the owner. All incidental expenses including the pulling out and transporting of the unit shall be borne by the supplier. f. The supplier shall provide a comprehensive warranty covering all parts and labor for a minimum period of one year from the date of commissioning of the equipment. g. The supplier must respond to a warranty repair request within 24 hours of notification by the buyer. The supplier is required to complete the repair or provide a replacement within a maximum lead time of 1 week from the time of notification. This includes the time for diagnostics, shipping of parts, and on-site or off-site repair as necessary. h. All equipment/ materials must be brand new.
Location of Commissioning:
a. PS No.9 (Celino), Purok Mabuhay, Brgy. San Isidro, City of Koronadal b. PS No. 14 (San Jose PS), Purok Maawain, Brgy. San Jose, City of Koronadal B. Technical Specifications It shall meet the following operating requirements: Description Metric (English) Units No. of Units: 2 Type: Variable Frequency Drive HP Rating: 60 horsepower or higher Phase: 3 Frequency: 60Hz Speed: 3450-3600 rpm Voltage rating: 230 volts Specification and Features:
Pre-wired and tested set-up in NEMA enclosure protection
UL safety level compliance
Capable of either manual or automatic application
Status indicator display
Detection of underload/ overload
Trouble log
Ingress protection: 20 or higher
Includes on-site programming
Dimension: at least 16”x32”x48”
Ventilation system: at least 4 fans
Built-in hour counter
Applicable for a both single-phase and three-phase power supply with 3 phase electrical load
Voltage Fluctuation Protection or Surge Protector
Complete with the following accessories:
Main circuit breaker, magnetic contactor, overload, over/underload voltage, start/stop push button switch, HOA selector switch, hour counter and frequency, surge protector device, etc.
At least twenty (20) meters length of 38mm2 electrical wire compatible to the maximum load of the unit with twelve (12) pieces terminal lugs.
C. Additional Requirements: (Compliance upon submission of quotation)
Must submit product catalog / brochure.
The manufacturer should have ISO 9001:2015 certificate.
Must submit a notarized statement of undertaking indicating that the bidder has a Regional Presence or a Regional Service/Support Partner/Center within Mindanao and could comply with the condition set on items A.2.e to A.2.g.
The Bidders must have a Certificate Of Good Performance in City of Koronadal Water District (CKWD) or its equivalent documents from other Local Water District(LWD)/agency/company (for those without previous project in CKWD). Otherwise, Bidders with incurred liquidated damages from recent or previous project in City of Koronadal Water District (CKWD) will be disqualified. Furthermore, a certificate of good performance with no liquidated damages will be submitted together with other required documents. Otherwise, non-submission of said certificate will be ground for disqualification.
D. Additional Requirements (Compliance upon Delivery)
Must have standard manufacturer’s installation accessories.
Minimum manufacturer's warranty certificate of one (1) year.
The supplier’s technical representative shall be present during commissioning for final testing and Configuration.
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
Extracted from the stored notice
Key requirements
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Submission & process
Pre-Bid Conference
Known from stored extraction
Required in stored extraction
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Stored timeline
Important dates
Published · Manila
Oct 21, 2026, 12:00 AM
Deadline · Manila
Nov 11, 2026, 12:00 PM
11 days left
First saved / captured
Oct 21, 2026, 1:57 AM
Last database update
Oct 21, 2026, 1:57 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Freshness: First saved / captured Oct 21, 2026, 1:57 AM; last database update Oct 21, 2026, 1:57 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.