Schedule A- Supply, Delivery, Installation and Commissioning of Five (5) Units Brand New Electromagnetic Production Flowmeters with Five (5) Units Brand New Automatic Voltage Regulator (AVR)
Buying agencyCITY OF KORONADAL WATER DISTRICT
Bid Brief
Is this bid worth a closer look?
Stored notice data. Confirm all decisions with the official documents.
Open · storedCompany screening · Not checked
Approved budget₱1,110,900.00
Time remaining11 days leftDeadline Nov 11, 2026, 12:00 PM
Company screeningCompany screening has not been run for this bid.
Main thing to check
Company screening is not checkedCheck statusWhy this matters
Relevance does not establish whether your company meets the bid requirements.
Next action
Check my company
Use the supporting sections below to verify the evidence.
Stored category: Industrial Machinery and Equipment
Item Specification Statement of Compliance “Comply” or “Not Comply” For all items 1-2 A. General Specification:
Scope
The scope of work shall be to supply, deliver, install and commission five (5) units brand new electromagnetic production flowmeters with five (5) units brand new automatic voltage regulator (AVR).
Site Location
The units shall be installed at the following locations:
Agreville Pumping Station (PS No. 06), Purok G. Morillo, Brgy. Sta. Cruz, City of Koronadal
Victory Homes Pumping Station (PS No. 08), Purok Kalikasan, Brgy. Paraiso, City of Koronadal
PRC Pumping Station (PS No. 10), Prime Regional Center (PRC), Brgy. Carpenter Hill, City of Koronadal
San Antonio P.2 Pumping Station (SA P. 2 PS), San Antonio P. 2 Subd., Brgy. Sta. Cruz, City of Koronadal
Assumption Pumping Station (Spring no. 01), Sitio Datal Fitak, Brgy. Assumption, City of Koronadal
Conditions
a. The scope of work shall be to supply, deliver, install and commission five (5) units brand new electromagnetic production flowmeters with five (5) units brand new automatic voltage regulator (AVR) and its related accessories to CKWD. The units and accessories shall be brand-new, at most three years ex-stock. b. The supplier shall present during the installation of the supplied units. c. The supplier shall commission the unit within Ninety (90) days after signing of Contract/ Purchase Order (PO). The 15-day time frame shall be allotted to check the proper alignment/ setting of the units and make necessary corrections of mechanical failures found during installation and construction. The supplier shall inform the CKWD measures and proper procedures on the unit’s operation to guarantee a smooth and proper function of the newly installed unit. d. Field-testing shall be made once the mounted equipment is ready for operation and when both the CKWD and supplier have finished their scopes of work on the installed unit. CKWD engineers shall conduct field testing with the presence of supplier’s representative. e. In case the unit failed during field testing, the supplier shall make necessary corrections, repair, or replace the unit without cost to the owner. All incidental expenses including the pulling out and transporting of the unit shall be borne by the supplier. f. The supplier shall provide a comprehensive warranty covering all parts and labor for a minimum period of one year from the date of commissioning of the equipment. g. The supplier must respond to a warranty repair request within 24 hours of notification by the buyer. The supplier is required to complete the repair or provide a replacement within a maximum lead time of 1 week from the time of notification. This includes the time for diagnostics, shipping of parts, and on-site or off-site repair as necessary. h. All equipment/ materials must be brand new. i. On-site inspection is highly recommended. Electromagnetic Production Flowmeters, 50mm-100mm diameter with mating flanges and display monitor with Automatic Voltage Regulator B. Technical Specifications
Electromagnetic Flow Meter
a. Nominal Diameter: 50mmØ 100mmØ
San Antonio P2 PS (SA P. 2 PS) 1. Agreville PS (PS No. 06)
Assumption Spring (Spring No. 01) 2. Victory Homes PS (PS No. 08)
PRC PS (PS No. 10)
b. Meter Body Sensor:
Cast Iron epoxy powder coated or higher
Hard rubber Lining suitable for potable water
The unit must be capable of 0D/0D straight pipe installation
IP 68 enclosure protection
Stainless steel 316 sensor electrodes
Tamper proof protection
Meter size and flow direction arrow embossed
Individual calibration factor/code for each sensor
Suitable for continuous operation with water temperature of at least 50°C
Suitable for compact or remote installation; and
At least 20 meters of signal cable for remote installation.
c. Converter w/ Display:
Configurable multi-line digital display capable of showing flow rate, totalized volume, and flow direction.
Built-in keypad for on-site programming
Display of instantaneous flow, flow direction, and totalized volume, etc.
Total volume register in cubic metres (m³);
Flow-rate display/register in litres per second (L/s)
Measuring range: minimum flow rate of 1 L/s or less and max. flow rate of at least 50 L/s or higher for 100 mm Meter, max. flow rate of at least 20 L/s or higher for 50mm meter.
Pulse output capability for connection to external data acquisition equipment
Suitable of 230Vac power supply
With analog output of 4 ~ 20mA
An accuracy of +/- 0.20% or better
With relay output alarms
Polycarbonate housing, glass reinforced or powder-coated aluminum housing
RS 485, USB 1.1 or Infrared interfaced
IP 67 enclosure protection
Password/parameter protection against unauthorized changes.
d. Accuracy and Metrological Requirements:
Comply with ISO 4064-1:2014 Class 1 or Clas 2 applicable metrological requirements
Have Accuracy Class 2 or better
Have manufacturer's accuracy of ±0.20% of measured value or better
Clearly state Q₁, Q₂, Q₃, Q₄, and Q₃/Q₁ (R ratio)
Maintain the specified accuracy within the manufacturer's stated operating conditions
For ISO 4064-1:2014 Accuracy Class 2, the maximum permissible error shall be:
±5% from Q₁ to below Q₂; and ±2% from Q₂ to Q₄ for water temperatures from 0.1°C to 30°C; and ±3% above 30°C, where applicable. e. Other conditions:
Factory calibration certificate for each meter
Manufacturer's technical datasheet
Installation and operation manual
Calibration factor/code for each sensor
Wiring and communication information; and
Automatic Voltage Regulator (AVR)
a. Load Capacity: Load capacity compatible with the electromagnetic flow meter or one step higher. b. Input Voltage: 100Vac – 260Vac c. Output Voltage: 220Vac ± 10% d. Electrical Phase: Single Phase e. Frequency: 60Hz f. Protection Features: Overvoltage, Undervoltage, Short-circuit, Overload, Thermal Overload, Time Delay, Surge, etc. C. Additional Requirements: (Compliance upon submission of quotation)
Must submit original product catalog / brochure of the units.
The manufacturer should have a valid ISO 9001:2015 certificate.
Must submit a notarized statement of undertaking indicating that the bidder have a Regional Presence or a Regional Service/Support Partner/Center within Mindanao and could comply with the condition set on items A.3.e to A.3.g.
The Bidders must have a Certificate Of Good Performance in City of Koronadal Water District (CKWD) or its equivalent documents from other Local Water District(LWD)/agency/company (for those without previous project in CKWD). Otherwise, Bidders with incurred liquidated damages from recent or previous project in City of Koronadal Water District (CKWD) will be disqualified. Furthermore, a certificate of good performance with no liquidated damages will be submitted together with other required documents. Otherwise, non-submission of said certificate will be ground for disqualification.
D. Accessories/Additional Requirements (Compliance upon Delivery)
The unit must have mating flanges, bolts, and nuts at both ends.
The supplier must submit product brochure and operating manual and software.
The units shall be tested and certified by NWRB or its authorized testing laboratory prior to shipment. Supplier must submit certificate of tests.
The units shall be covered by a minimum of one (1) year manufacturer’s warranty against material and workmanship defects. Supplier must submit warranty certificate.
The supplier’s technical representative shall be present during installation and commissioning for final testing.
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
Extracted from the stored notice
Key requirements
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
Submission & process
Pre-Bid Conference
Known from stored extraction
Required in stored extraction
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Stored timeline
Important dates
Published · Manila
Oct 21, 2026, 12:00 AM
Deadline · Manila
Nov 11, 2026, 12:00 PM
11 days left
First saved / captured
Oct 21, 2026, 1:57 AM
Last database update
Oct 21, 2026, 1:57 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Schedule A- Supply, Delivery, Installation and Commissioning of Five (5) Units Brand New Electromagnetic Production Flowmeters with Five (5) Units Brand New Automatic Voltage Regulator (AVR)
Freshness: First saved / captured Oct 21, 2026, 1:57 AM; last database update Oct 21, 2026, 1:57 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.