Pre-Bid Conference
Known from stored extractionA specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Buying agencyMUNICIPALITY OF SAGADA, MOUNTAIN PROVINCE
Bid Brief
Stored notice data. Confirm all decisions with the official documents.
Relevance does not establish whether your company meets the bid requirements.
Use the supporting sections below to verify the evidence.
Compare stored requirements with evidence from this browser. Unknown answers stay as Needs verification.
Checking the stored deadline…
Add only the evidence relevant to this bid, or screen with unknown answers.
Not assessed yet
Stored category: Construction Projects
NAME OF CONTRACT: CW-GEF-TNORTE-05-2026, IMPROVEMENT / UPGRADING THE BARANGAY TETEP-AN NORTE ROAD LOCATION: TETEP-AN NORTE, SAGADA, MOUNTAIN PROVINCE ITEM DESCRIPTION QTY UNIT UNIT COST COST B.5 Project Billboard/Signboard 2.00 Each B.7(2) Occupational Safety and Health Program 1.00 lumpsum B.9 Mobilization/Demobilization 1.00 lumpsum 100(1) Clearing and Grubbing 33.00 Sq.m 103(1)a Structure Excavation (Common Soil) 60.30 Cu.m 103(1)c Structure Excavation (Hard Rock) 53.13 Cu.m 104(2)a Embankment from Borrow (Common Soil) 76.50 Cu.m 105(1)a Sub-Grade Preparation (Common Materials) 614.87 Sq.m 200 Aggregate Subbase Course 92.23 Cu.m 311(1)b1 PCC Pavement (Unreinforced , 200mm thick 14 days) 547.37 Sq.m 404(1)a Reinforcing Steel Bars (Grade 40) 431.57 kgs 405(1)a3 Structural Concrete (Class A) 4.86 Cu.m 505(2)a Grouted Riprap (Class A) 248.00 Cu.m 600(4) Curb and Gutter (Cast in Place) 135.00 Lin.m Pre-bid Conference Date Time Venue 05/11/2026 2:00 PM BAC OFFICE, THIRD FLOOR, NEW MUNICIPAL BUILDING Created by TOMAS MANGACAM BOMAY-ET Date Created 20/10/2026 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. © 2004-2026 DBM Procurement Service. All rights reserved. Help | Contact Us | Sitemap
This presentation only restructures stored source text. It does not add quantities, specifications, or delivery terms.
These checks organize what BidAssistant found. “Known from stored extraction” describes the source record, not your company’s eligibility. Unknowns remain verification items.
A specific pre-bid conference is identified in the procurement notice.
This means the requirement is present in the stored extraction. It does not mean your company satisfies it.
Oct 24, 2026, 12:00 AM
Nov 16, 2026, 2:00 PM
16 days leftOct 24, 2026, 1:27 AM
Oct 24, 2026, 1:27 AM
These are stored timestamps. A missing pre-bid or other procurement date is not shown.
Open the stored PhilGEPS source link
Freshness: First saved / captured Oct 24, 2026, 1:27 AM; last database update Oct 24, 2026, 1:27 AM.
New notices are collected periodically, but this service does not routinely refresh already-known notices. Stored dates and status may miss deadline extensions, cancellations, or amendments. Always check the latest official PhilGEPS notice. First-saved and last-update times describe our stored record, not a fresh check of the official notice.
BidAssistant PH is an independent discovery and screening aid, not PhilGEPS or a procuring agency.